Remained not decision-useful for three of five audiences, because the 20.8% gas cut is not split between abatement, 10% lower gas flows and a new methane method
This review tests APA Group's publicly available climate disclosure against CRI's Climate Disclosure Review Rules, which use the CRI Net Zero Standard as the reference for a credible claim together with AASB S2 Climate-related Disclosures. It reflects the information available at the review date, states what the evidence supports, what it does not, and what would resolve each open point, and says "cannot verify", not "no issue", where evidence is missing. It is general information, not legal, financial or investment advice, and not an audit or an assurance engagement. It does not allege illegality, misconduct, greenwashing or dishonesty. Organisations may contact CRI at robc@noco2.com.au to identify an error, provide relevant public information or request review of updated disclosures. See Important information at the end of this report.
| Company | Carbon / supply-chain accounting | Institutional investors | Consumer / retail investors | Consumers & public | Regulators |
|---|---|---|---|---|---|
APA Group (APA) | 2 | 1 | 1 | 1 | 2 |
The same disclosure can be reliable for one reader and misleading for another, so we rate decision-usefulness separately for each audience on the three-point scale below. There is no single pass/fail verdict — decision-usefulness is a judgement about each audience, not the report as a whole.
The bar below adds the five audience ratings into an overall score out of 15. It is used only to rank reports against one another — it carries no band and no verdict label. Its colour simply reflects the mix of the five ratings: the more red, the more audiences the disclosure falls short for.
This review assesses whether the company's climate disclosure is *decision-useful*: whether a reader can actually rely on it for the decision they are making. Because a disclosure that is sound for one reader can mislead another, we score decision-usefulness separately for each of the main audiences that rely on climate disclosure. The audiences, and what each needs from the disclosure, are the same across all our reviews:
| Audience | What they rely on the disclosure for |
|---|---|
| Carbon / supply-chain emissions accounting | Lifting the company's emissions figures into their own inventory. They need complete category coverage (nothing material excluded), a single reconcilable footprint, and a disclosed, transparent method. Whether a figure is estimated or supplier-specific is a maturity question, not a fault; the fault is exclusion. |
| Institutional investors | Pricing climate risk (physical and transition) including target credibility and whether targets are being met with real reductions, the completeness of financed / portfolio exposure, and flow-through exposure inherited from investees or counterparties whose own emissions may be growing. They can usually reconstruct detail, so they are judged on whether the true position is derivable. |
| Consumer / retail investors | Understanding the company's climate position and target progress without expert reconstruction. They need the headline claims to match the evidence, the material sources to be targeted, and caveats to be easy to find. |
| Consumers & public | Knowing whether the company's public claims are true: that it is genuinely acting rather than greenwashing, and not fuelling climate change while presenting otherwise. Headline claims matter most to this audience, which is least able to read past a buried caveat. |
| Regulators | Whether the disclosure is compliant, consistent across sources and audiences (does the company say one thing to one audience and something else to another), and useful across the board. |
The overall score is simply the sum of the five audience ratings, out of 15. It has no band and no pass/fail label; we use it only to rank reports against one another; its colour bar reflects the mix of the five ratings (the more red, the more audiences the disclosure falls short for). §2.1 gives each audience's rating and the reason behind it; §1 covers scope and basis, §2.2–2.3 the evidence dashboard, §3 what the disclosure means for a reader (what's counted, financed-emissions detail, real-vs-accounting movement, trajectory), §4 the findings, §5 disclosure-risk, §6 how to fix it and §7 the conclusion; the working annexes show the rule-level derivation.
Two conventions apply throughout. A certification (including the Australian Government's Climate Active program) is treated as a claim to be tested, not as a strength in itself. Detailed disclosure and candour about a company's own gaps are the baseline expected of a credible discloser, not a credit.
| Document | Reviewed? | If missing, effect on this review |
|---|---|---|
| APA Group, *FY26 Annual Report*, including the Sustainability Report (folios 76–139): the mandatory AASB S2 climate-related disclosures, the directors' declaration, and Deloitte's mandatory audit and review report and voluntary assurance report | Yes | The primary disclosure and APA's first mandatory climate statement |
| APA Group, *FY26 Sustainability Data Book* (PDF and workbook) | Yes | The source of every emissions table, the re-baselining schedule, the carbon credit and certificate registers and the enhanced methane data |
| APA Group, *FY26 Greenhouse Gas Emissions Methodology* | Yes | The stated method, including the enhanced methane method now in the inventory |
| APA Group, *Climate Policy*, 6 January 2026 | Yes | Restates the 2050 net zero ambition; no change in commitments |
| APA Group, *2025 Climate Transition Plan* | Yes | The commitments FY2026 is measured against |
| APA Group, *FY25 Annual Report*, *FY25 Sustainability Data Book* and methodology, and the 2022 to 2024 climate reports and data books | Yes | Prior periods, used to establish the direction of travel and what changed in the disclosure. Context, not the reviewed year |
| Clean Energy Regulator, NGER register for FY2025-26 | Not published: not yet released at the review date | The register for the reviewed year is published after this review date, so the regulator reconciliation for FY2026 cannot be made. The FY2024-25 row was used for the prior-year check |
| Standard / framework | Referenced by company? | How strongly | Sector module(s) applied |
|---|---|---|---|
| Corporations Act / Ch 2M | Yes | Binding: the Sustainability Report is prepared under Part 2M.3, with a directors' declaration that it complies with AASB S2 | Energy infrastructure |
| AASB S2 | Yes | Binding: FY2026 is APA's first mandatory year. "Prepared in accordance with" AASB S2; first-year relief from comparatives taken, with comparatives given voluntarily | Energy infrastructure |
| ASIC RG 280 | No | Not referenced: relevant to the mandatory statement | Energy infrastructure |
| GHG Protocol (Corporate / Scope 2 / Scope 3) | Yes | In accordance with: "APA discloses its GHG emissions in accordance with" the Corporate Standard, the Scope 2 Guidance and the Scope 3 Standard | Energy infrastructure |
| PCAF (financed emissions) | No | Not applicable | Not applicable |
| SBTi | Yes: by reference | Mentioned: no pathway exists for midstream gas; targets "have not been validated by a third party" | Not applicable |
| Climate Active / other carbon-neutral framework | No | Not referenced: no carbon-neutral claim | Not applicable |
| Certificates (GreenPower / LGC / ACCU / REC) | Yes | With reference to: large-scale generation certificates for grid electricity; ACCUs for Safeguard compliance at Newman Power Station and for business travel | Energy infrastructure |
| NGER Act and Safeguard Mechanism | Yes | Binding | Energy infrastructure |
| ASSA 5000 and ASSA 5010 | Yes | Binding: assurance | Energy infrastructure |
| OGMP 2.0 and US EPA Method 21 | Yes | With reference to: methane method guides | Energy infrastructure |
| TCFD | Yes | Mentioned | Energy infrastructure |
This is a standard review of APA Group's FY2026 climate disclosure, scoped to documents covering FY2026 and earlier, with FY2025 as the prior period. FY2026 is APA's first year under AASB S2, so findings about the mandatory statement can be compliance findings as well as decision-usefulness findings. The corpus for the reviewed year is complete.
Two limitations bound the conclusions. The regulator's register for FY2025-26 is not yet published, so the reported Scope 1 and Scope 2 cannot be reconciled to it. Several drivers the review would ordinarily test are not quantified in any reviewed source. They are the share of the gas-infrastructure reduction due to lower gas flows, the cause of a 41% fall in electricity line losses, and what happened to the credits issued at Newman Power Station. They are carried in §4.3.
What the company should fix first: publish the split of the gas-infrastructure reduction between compressor efficiency, methane abatement, lower gas flows and the change of methane method, and set the gross target the standard asks for beside the net one.
| Dimension | Rating | Justification |
|---|---|---|
| Headline claim ↔ evidence match | 2/5 | The 20.8% is on the audited basis and uses no credits, but its drivers are not separated, and the snapshot presents three reductions without their causes |
| Disclosure quality | 7 / 15 overall | Six-year series, both consolidation bases, both Scope 2 bases, disaggregated consolidated and investee emissions, asset-by-asset re-baselining, and emissions for approved growth projects |
| Inventory completeness (Scope 1/2/3) | 4/5 | All fifteen categories screened; end-user emissions of 60.1 MtCO₂e disclosed separately |
| Financed-emissions completeness (if FI) | N/A | Not a financial institution |
| Target credibility | 1/5 | One absolute target over 24% of operational emissions with about half of the planned reduction by FY30 from credits; an intensity goal over 71%; growth expected after 2030 with no pathway; Scope 3 goals already met or process-only |
| Real reduction vs accounting movement | 2/5 | Real abatement is evident, but lower throughput and the method change sit inside the same figure and are not quantified |
| Offset / certificate / renewable integrity | 3/5 | No credits used for the voluntary target in FY26. 169,418 ACCUs issued at Newman are not netted against the gross intensity goal, and their disposition is not stated |
| Assurance coverage vs claim | 5/5 | Audit opinion over Scope 1 and Scope 2 and the target metrics; review over governance, strategy and Scope 3; limited assurance over enhanced methane data |
| Standards / compliance confidence | 3/5 | A complete first-year statement with one requirement not met as written (gross target) |
| Comparability (like-for-like only) | 3/5 | History restated for the methane method and divestments, disclosed line by line. The mandatory table's FY25 comparative is unrestated, and "underlying" changed meaning |
| Reader accessibility | 3/5 | Voluntary content added at the front for readability; the drivers of the headline figures are not |
| Evidence limitations | 3/5 | The flow effect, the line-loss fall and the Newman credits are unverifiable |
| Area | Rating | Basis |
|---|---|---|
| Corporations Act / Ch 2M | Appears broadly compliant: minor limitations | A Sustainability Report under Part 2M.3 with a directors' declaration and an auditor's report under ASSA 5010. The limitation is the target disclosure below |
| AASB S2 | Potential compliance concern | The standard requires that a net greenhouse gas target be disclosed with its associated gross target. APA's 30% gas-infrastructure target is net, and APA states it "has not established an accompanying gross target". The rest of the statement is complete, including disaggregated Scope 1 and Scope 2, cross-industry metrics and transition-plan information |
| ASIC RG 280 | Not applicable for the period | Not referenced; no separate finding |
| GHG Protocol / Scope 2 / Scope 3 | Appears broadly compliant: minor limitations | Operational control applied consistently; all fifteen categories screened. Market-based line losses still reuse the location-based factor; the line-loss fall is unexplained |
| PCAF / financed emissions | Not applicable for the period | Not a financial institution |
| Carbon-neutral / net-zero framework | No apparent issue | Net zero is an ambition for total operational emissions by 2050 |
| Certificates / credits | Appears broadly compliant: minor limitations | Credits registered and retired with project detail. The disposition of 169,418 ACCUs issued at Newman is not stated |
| Other company-referenced framework | No apparent issue | Assurance under ASSA 5000 and ASSA 5010 |
Basis and period. All figures are FY2026 (year ended 30 June 2026) on APA's operational-control boundary, from the FY26 Sustainability Data Book and the Greenhouse gas emissions data summary (Annual Report folio 118). Methane for seven gas assets is on APA's enhanced method and for the rest on the regulated method. Scope 2 location-based is line losses (82,610 tCO₂e) plus grid electricity (12,945 tCO₂e); market-based is the same line losses with grid electricity reduced to zero by certificates. The two bases measure the same electricity and are never added. Categories 2 and 4 are calculated inside Category 1, as APA states. Category shares are of a footprint of 2,316,254 tCO₂e, being Scope 1, location-based Scope 2 and gross Scope 3.
| Scope / category | Status | Quantified (tCO₂e) | Material? | Note |
|---|---|---|---|---|
| Scope 1: combustion / fugitive / fleet | Reported | 1,703,296 | Yes: 73.5% | Power generation 1,266,668; gas infrastructure 436,543, which includes part-year emissions of divested gas networks; electricity transmission 84. Consolidated group 1,667,223 and other investees 36,073. Audited |
| Scope 2: electricity (location-based) | Reported | 95,554 | Yes: 4.1% | Line losses 82,610, down from 139,281 with no explanation, and grid electricity 12,945. Audited |
| Scope 2: electricity (market-based) | Reported | 82,610 | Yes | Line losses only; APA reuses the location-based value for them as it retires no certificates against them. Not additive to the location-based row |
| Scope 3 C1 Purchased goods & services | Reported | 115,250 | Yes: 5.0% | Spend-based, including capital goods and upstream transport. Down 38% on lower project spend |
| Scope 3 C2 Capital goods | Reported within C1 | Included in the 115,250 above | Yes | Cannot be separated from operating spend |
| Scope 3 C3 Fuel- & energy-related | Reported | 210,172 | Yes: 9.1% | The largest Scope 3 category |
| Scope 3 C4 Upstream transport & distribution | Reported within C1 | Included in the 115,250 above | No | |
| Scope 3 C5 Waste | Reported | 844 | No | |
| Scope 3 C6 Business travel | Reported | 3,681 | No | Offset in full with 3,681 ACCUs |
| Scope 3 C7 Employee commuting | Reported | 1,699 | No | |
| Scope 3 C8 Upstream leased assets | Reported within Scope 2 | Included in Scope 1 and Scope 2 | No | Leased offices are inside the regulated inventory |
| Scope 3 C9 Downstream transport & distribution | Reported within C11 | Included in the 182 below | No | |
| Scope 3 C10 Processing of sold products | Not relevant | Not applicable | No | |
| Scope 3 C11 Use of sold products | Reported | 182 | No | Gas APA itself sells; almost all sale contracts have expired. Transported gas APA does not own is not its product: its combustion, 60,135,397 tCO₂e, is disclosed separately as end-user emissions and correctly kept outside Scope 3 |
| Scope 3 C12 End-of-life of sold products | Not relevant | Not applicable | No | |
| Scope 3 C13 Downstream leased assets | Not relevant | Not applicable | No | |
| Scope 3 C14 Franchises | Not relevant | Not applicable | No | |
| Scope 3 C15 Investments / financed & facilitated | Reported | 185,575 | Yes: 8.0% | Assets APA owns but does not operate: gas infrastructure 39,167 and power generation 146,408. Reviewed under the mandatory engagement |
N/A, not a financial institution. APA's owned but non-operated assets are quantified as Category 15 at 185,575 tCO₂e and are covered in §3.1 and §4.
APA reports a 20.8% fall in gas-infrastructure emissions against an adjusted FY21 base, with gross and net the same because no credits were surrendered. The base itself is new: the history has been restated for the enhanced methane method and for two divested gas networks, moving FY21 from 553,512 to 532,786 tCO₂e. The table tests what sits inside the 20.8%, then each scope separately.
| Reported change | Driver | Real-world reduction? |
|---|---|---|
| Gas infrastructure, adjusted, 532,786 → 422,131 tCO₂e, −20.8% | Mixed: APA cites compressor efficiency (50,078 t of estimated abatement), methane abatement projects (1,367 t of methane, 38,272 t), and certificates for grid electricity (8,325 t, 1.6 points). It adds that "emissions reductions were partially due to lower gas transmission volumes", without a figure. Gas delivered fell 9.9% in the year and is 11.6% below FY21. On the seven re-measured assets, the new method adds 10,188 t to the base year and sits 16,558 t below the regulated method in FY26: a swing of 26,746 t, or 5.0 points | Partly: efficiency and methane projects are own action. Lower throughput is activity. How much of the 5.0-point method swing is abatement between measurement campaigns, and how much is the method, is not stated. The components overlap and cannot be separated from the disclosure |
| Gas infrastructure, FY25 → FY26, 497,484 → 422,131 tCO₂e, −15.1% | Mixed: combustion carbon dioxide falls 20.9% and compressor energy use 21.1%, while gas delivered falls 9.9%. The South West Queensland Pipeline drops below the 100,000 t Safeguard threshold for the first time | Partly: for the same reasons |
| Zero credits surrendered for the gas target | Offsets: the 2025 transition plan restricts surrenders to Safeguard obligations, and no gas facility had one in FY26 because both covered pipelines fell below the threshold | No: not a reduction in itself. The plan expects credits to supply about half of the forecast reduction by FY30 |
| Methane, adjusted, 7,934 → 7,538 t, −5.0% | Mixed: valve upgrades (68 in FY26, 53% of high-bleed valves done) and leak repairs, offset by growth of about 241 t on the Northern Goldfields Interconnect. FY25 is restated to 8,308 t, 4.7% above base, from the 3.1% above first reported | Yes: on a new method whose base-year reconstruction is disclosed but whose split between abatement and method is not |
| Power generation intensity, 0.384 → 0.313 tCO₂e/MWh, −18.5% | Real abatement: first full year of Port Hedland solar and battery, heat-rate optimisation at Diamantina, higher solar output at Dugald River and Darling Downs. Absolute emissions 5.8% lower than FY25, while generation rose 2.1% | Yes: in intensity. 169,418 ACCUs were issued to APA at Newman Power Station in FY26, equal to 13% of power generation emissions; the goal is measured gross, before APA's own add-back of issued credits, and who holds the credits is not stated |
| Electricity transmission, 139,336 → 82,694 tCO₂e, −40.7% | Cannot verify: line losses fall from 139,281 to 82,610 | Cannot verify: no explanation in the report, the data book or the methodology |
| Scope 2 location-based, 150,471 → 95,554 tCO₂e, −36.5% | Cannot verify: line losses; grid electricity rises 15.7% | Cannot verify: for the same reason |
| Scope 3, 636,284 → 517,404 tCO₂e, −18.7% | Activity: lower project spend (Category 1), less gas used in operations (Category 3), expired gas sale contracts (Category 11), less compression on the Victorian Transmission System (Category 15) | Partly: most of it is lower activity rather than value-chain abatement |
| Category 15 gas infrastructure, 69,899 → 39,167 tCO₂e, −44.0% | Mixed: "reduced compression at our Brooklyn compressor station, primarily due to the implementation of the Western Outer Ring Main project, and at our Gooding compressor station due to lower volumes of Longford gas flow". Both sit on an asset operated by the market operator | Partly: the ring main is an APA capital project; lower Longford flows are activity |
The consequence for a reader is that the 20.8% is the largest gas reduction APA has reported, and it still cannot be read as abatement alone. The one caveat that qualifies it, lower gas volumes, is unquantified. The one that moves it most, the method change on seven assets, is not mentioned beside it.
Measured on APA's restated series, gas-infrastructure emissions were broadly flat from FY21 to FY24, fell 4.7% in FY25 and fell a further 15.1% in FY26. Power generation intensity has improved each year and is now 18.5% below the base. Scope 3 is a third below FY21, almost all of it from gas APA no longer sells and projects it is no longer building. Methane, flat or rising against the base through FY25, is now 5.0% below it on the new method.
Four things changed in the disclosure. First, the whole history was restated: the enhanced methane method moved the FY21 base up by 10,188 tCO₂e on seven assets, and two divested networks moved it down. The FY25 figures APA reported last year (6.5% gross, 13.3% net, methane 3.1% above base) now read 6.6%, 13.7% and 4.7%. Second, "underlying" changed meaning. In the FY25 report it meant excluding growth and including offsets and unassured abatement (22.3%). In FY26 it means the inventory with the new methane method (20.8%), and the growth-excluded figure is 27%. Third, APA's FY25 expectation that its portfolio methane would come out lower on the new method was borne out in aggregate for the seven assets: 16% below the regulated method in FY26, though above it on the assets with compression. Fourth, from FY26 no voluntary credits are used for the gas target, as the 2025 transition plan set out.
Metrics over time
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 | Movement | Driver | Note |
|---|---|---|---|---|---|---|---|---|---|
| Scope 1 (tCO₂e) | 1,440,167 | 1,503,042 | 1,389,402 | 1,915,392 | 1,874,546 | 1,703,296 | Mixed: up with the FY24 acquisitions, down 9.1% in FY26 | Mixed: throughput, efficiency and method | Restated series. FY24 step is the Pilbara acquisitions. The mandatory table shows FY25 as 1,862,661, unrestated |
| Scope 2 location-based (tCO₂e) | 81,790 | 92,693 | 152,018 | 141,843 | 150,471 | 95,554 | Mixed: up to FY23, down 36.5% in FY26 | Cannot verify | Line losses fall 40.7%, unexplained |
| Scope 2 market-based (tCO₂e) | 81,791 | 92,693 | 137,643 | 129,718 | 139,281 | 82,610 | Flat: first to last; up to FY23, down with line losses in FY26 | Certificates: cover grid electricity from FY23 | |
| Scope 3 total (tCO₂e) | 771,671 | 853,473 | 815,284 | 664,598 | 636,284 | 517,404 | Down | Activity | Gross |
| Emissions intensity (power generation, tCO₂e/MWh) | 0.384 | 0.385 | 0.367 | 0.341 | 0.339 | 0.313 | Down | Real abatement: renewables and heat rate | Goal 0.25 by FY30 |
| Renewable electricity (% of consumption) | 0% | 0% | 100% | 100% | 100% | 100% | Up: held at 100% since FY23 | Certificates: including 3,579 surrendered under the national scheme in FY26 | Grid electricity only. Covers 13.5% of location-based Scope 2 |
| Certificates and offsets retired (tCO₂e) | 0 | 19,537 | 22,409 | 53,347 | 44,465 | 101,845 | Up | Offsets: FY26: 98,164 for Newman Safeguard, 3,681 for business travel, none for the gas target | Offset units surrendered. Newman issued 169,418 ACCUs |
| Gas infrastructure, adjusted gross (tCO₂e) | 532,786 | 533,356 | 510,457 | 521,843 | 497,484 | 422,131 | Down: flat, then down | Mixed: see §3.3 | Restated in FY26 |
| Gas infrastructure, net (tCO₂e) | 532,786 | 513,819 | 493,694 | 476,253 | 459,902 | 422,131 | Down | Offsets: credits to FY25; none in FY26 | |
| Methane, adjusted (t CH₄) | 7,934 | 8,060 | 7,848 | 8,071 | 8,308 | 7,538 | Down: in FY26 | Mixed: abatement and method | Restated in FY26; target 5,554 t |
Targets and claims over time
| Target or claim | As first stated (period) | As stated for FY2026 | Change | Explained? | Note |
|---|---|---|---|---|---|
| Gas infrastructure operational emissions target | 30% gas infrastructure by FY30, FY21 base (FY2021) | 30% gas infrastructure by FY30, FY21 base, base restated | Rebased: methane method and divestments | Yes: restated asset by asset | Covers 24% of FY26 operational emissions. A net target with no gross target (F-5) |
| Net zero operational emissions goals | Gas 2050; power and transmission 2040 (FY2021) | All operations 2050 | Extended: deferred in FY25, held in FY26 | Partly: the 2025 transition plan gives the reason | No pathway after 2030 (F-6) |
| Methane target | 30% by FY30, FY21 base (period not stated in this review) | 30% by FY30, base restated on the enhanced method; target 5,554 t | Rebased | Yes | 5.0% below the restated base |
| Power generation emissions intensity goal | 35% by FY30, FY21 base (period not stated in this review) | 0.25 tCO₂e/MWh by FY30 | Unchanged | Not applicable | 18.5% below the base; ACCUs issued at Newman are not netted against it (F-10) |
| Category 15 gas infrastructure goal | 20% reduction by FY30, FY21 base (FY2025) | Unchanged | Unchanged | Not applicable | At 44%, largely from lower flows and the ring main on an asset APA does not operate (F-7) |
| Renewable electricity target | 100% renewable electricity (period not stated in this review) | Held at 100% of grid electricity | Achieved: from FY23 | Not applicable | Covers grid electricity only, 13.5% of location-based Scope 2 |
| Straight-line offset approach | Voluntary offsets surrendered to a straight-line trajectory to the gas target (2022 transition plan) | No voluntary credits used for the gas target | Withdrawn: from FY26 | Yes | The transition plan expects credits to supply about half of the forecast reduction by FY30 |
APA's first mandatory statement is complete and audited, and it says more than last year's report about what lies ahead: it states that growth will affect its pathway after 2030 and publishes the emissions of approved projects. It also drops the two statements last year's tables contradicted. The exposure now sits in two places. The first is one requirement of the standard not met as written: a net target without its gross target. The second is a headline reduction whose drivers are not separated, in a year when gas throughput fell 10% and the methane method changed. The single biggest driver is target architecture: a single absolute target covering a quarter of operational emissions, about half of whose planned reduction by FY30 is expected to come from credits. Beside it sits an intensity goal over 71%, and there is no pathway after 2030.
| Lens | Exposure | Confidence | What drives it | What would reduce it |
|---|---|---|---|---|
| Legal (misleading-conduct / disclosure / director-duty) | Moderate | Medium | A directors' declaration of compliance over a statement that does not disclose a gross target for a net target; a headline reduction and a remuneration outcome whose drivers are not disclosed | Disclose the gross target and the driver split |
| Regulatory (ASIC / ACCC / Clean Energy Regulator / AASB S2) | Moderate | High | The gross-target requirement; the unrestated mandatory comparative; the unexplained line-loss movement in the audited Scope 2 figure | Close the three items in the FY27 statement |
| Technology (dependence on unproven abatement) | Moderate | Medium | Methane recovery is in early delivery; power generation's long-term path depends on hydrogen-ready turbines APA calls commercially challenging; about half of the gas target by FY30 relies on credits | Publish the lever-by-lever pathway to FY30 and the credit volume |
| Physical (physical-risk disclosure consistency) | Low | Medium | 0% and $0 of assets assessed as vulnerable on a high-residual-risk threshold under SSP2-4.5; a group procedure established | Publish the residual ratings behind the 0% |
| Other: market and commercial | Moderate | Medium | Transition vulnerability reported as 0% and $0 on the house-view below 2°C scenario with a threshold of a 15% fall in value, and impacts "negligible" in aggregate across all scenarios, while APA plans to expand gas transport capacity by about 50% by FY30 and to build a Beetaloo pipeline | Show the scenario results by business unit, as in FY25, beside the growth plan |
| Claim / metric | To the regulator | To investors / public | Consistent after normalising boundary? |
|---|---|---|---|
| Scope 1 and Scope 2, FY2026 | Register for FY2025-26 not yet published | 1,703,296 and 95,554 tCO₂e | Cannot verify |
| FY2025 Scope 1 comparative | NGER FY2024-25: 1,862,642 | Mandatory table 1,862,661; data book 1,874,546 restated | No: the mandatory table matches the regulator; the data book is restated on a different method. Both are in one suite |
| Climate performance for remuneration | Audited remuneration report: "achieved the stretch emissions reduction targets" | Sustainability report: 20.8%, partly lower volumes | Cannot verify: the threshold is not disclosed |
| Credits for the gas target | N/A | Sustainability report: none surrendered; transition plan: about half of the FY30 reduction from credits | Yes: the difference is timing |
| Finding | Review finding (why it matters) | NoCO2 mechanism | Document / clause | Required evidence | Likely NoCO2 outcome |
|---|---|---|---|---|---|
| D6-01 | 20.8% not split by driver | Metric integrity and base-year consistency | 4.9.2 Metrics & Targets; 4.3 Initial Year & Reporting Period; 5.1.10 Emissions Tracking | Driver bridge | Non-conformance on presentation |
| D1-02 | Net target without gross | Reduction obligations reported gross | 4.7 Reduction Obligations; 4.7.5 Net Zero Status Requirements | Gross target | Non-conformance |
| D6-02 | Intensity goal on 71%; no post-2030 pathway | Reduction obligations and accelerated reduction timeline | 4.7; 4.7.4 Accelerated Reduction Timeline | Absolute pathway | Non-conformance |
| D4-03 | Scope 3 goals require no forward reduction | Reduction obligations across the inventory | 4.7; 4.5.3 | Forward goals | Non-conformance |
| D5-03 | Newman credits disposition | Credit reversal and double claim | 4.8.4 Credit Reversal; 4.5.6.3 Category C (Other Impacts, Benefits & Insetting) | Disposition | Cannot determine |
| D5-02 | Half the FY30 reduction from credits | Clean alternative assessment and abatement principles | 4.7.2 Clean Alternative Assessment; 4.8.1 Abatement Principles | Assessment of alternatives | Potentially applicable |
| D3-01 | Line losses unexplained | Emissions tracking | 5.1.10 Emissions Tracking; 4.5.5 Methodology | Explanation | Minor non-conformance |
| D3-02 | Market-based line losses on location factor | Contractual instruments | 5.1.13 Contractual Instruments | Residual mix | Minor non-conformance |
| D6-03 | "Underlying" redefined | Use of claims, public reporting | 4.9.1 Use of Claims; 4.9.4 Public Reporting & Disclosure | One definition | Non-conformance on presentation |
| F-8 | Snapshot without drivers | Use of claims, partial application | 4.9.1.5 Partial Application | Drivers beside figures | Non-conformance on presentation |
| D7-01 | Climate incentive threshold undisclosed | Governance | 4.9 Governance & Decision Making; 4.9.3 Roles & Responsibilities | Threshold | Non-conformance on disclosure |
| D8-01 | Transported-gas emissions without plan | Influence-based inventory | 4.5.6 Influence Based Inventory; Annex B | Plan | Development item |
| F-1 | Measured methane in the inventory | Data quality | 4.6.1 Data Quality ranking | Asset results | Conformant |
| F-2, F-3 | Physical abatement and renewables | Reduction obligations | 4.7 Reduction Obligations | Delivered results | Conformant in substance |
| D7-02 | Audit and review | Assurance | 6.1 Assurance; 6.2 Conformance | Already obtained | Conformant |
| D8-02 | Aggregated scenario result | Standard review item, no direct clause | Standard review item, no direct clause | Business-unit results | No outcome |
APA Group's first mandatory climate statement is complete and audited, and it removes the two statements last year's report made that its own tables contradicted. The ratings rest on gaps the FY2026 disclosure still carries. The one absolute target covers a quarter of operational emissions, and it is a net target without the gross target the standard asks for. Its headline 20.8% cut used no credits, but the report does not say how much of it came from abatement, from gas deliveries almost 10% lower, or from a new methane method that moves the comparison by about 5 points. Power generation, 71% of operational emissions, remains under an intensity goal with no cap, and there is no pathway after 2030 while growth is planned.
The first fix is a driver bridge for the gas target, showing efficiency, methane projects, throughput, certificates and method change separately, with the gross target set beside the net one. Next, explain the 41% fall in line losses and state what happened to the 169,418 credits issued at Newman. The structural question remains an absolute path for power generation and for the years after 2030, which the next transition plan is expected to address.
This diagnosis is general information, published to support transparency, accountability and public debate on corporate climate disclosure. It sets out CRI's assessment of the publicly available climate disclosures of the organisation named above, for the reporting period stated, based on third-party information available at the review date. The assessment is made against CRI's Climate Disclosure Review Rules (version stated above), which use the CRI Net Zero Standard as the reference for a credible claim together with AASB S2 Climate-related Disclosures, and it gives reasons for each finding.
It assesses the disclosure, not the organisation's underlying climate performance or intent, and it does not allege illegality, misconduct, greenwashing or dishonesty. It is not tailored advice, nor legal, financial or investment advice, and it is not an audit, an assurance engagement or a certification. CRI does not accept liability for any error or omission in this analysis, or for any loss arising from use of or reliance on it.
AI tools help locate, extract and organise material from the source documents against a fixed rule set. Every rating and conclusion is reviewed and confirmed by CRI analysts; the rules, not the model, determine the outcome.
Organisations may contact CRI at robc@noco2.com.au to identify an error, provide relevant public information or request review of updated disclosures. Where a correction affects a finding, the diagnosis is updated and the change is noted. Further information about the review method is at noco2.com.au.
© Carbon Reduction Institute Pty Ltd, ABN 26 122 969 233. This report is protected by copyright. It reproduces third-party material for the purpose of criticism and review; any reproduction of this report not permitted under the Copyright Act 1968 (Cth) requires CRI's consent.
These annexes are the detailed working layer behind the findings in the body: the evidence base, rule application and traceability. Much of it is review working, retained for transparency and of interest to both the internal review team and external readers who want to see how each finding was reached.
| Document | Status | Criticality | Notes |
|---|---|---|---|
| APA Group, *FY26 Annual Report* (247 pp; Sustainability Report folios 76–139; mandatory auditor's report folios 120–126; voluntary assurance folios 127–133; remuneration report from folio 138) | Reviewed | Critical | Identity confirmed from body text: "the climate-related disclosures for APA and its subsidiaries for the year ended 30 June 2026". Assurance pages are images, read from rendered pages |
| APA Group, *FY26 Sustainability Data Book* (PDF and workbook) | Reviewed | Critical | Workbook read directly. Sheets: GHG emissions, Rebaselining, Energy, Carbon credits, LGCs, Enhanced methane reporting, Safeguard position statement, Expanded climate-related performance, Assets |
| APA Group, *FY26 Greenhouse Gas Emissions Methodology* | Reviewed | Critical | Changes from prior year: enhanced methane method in the inventory for seven assets |
| APA Group, *Climate Policy*, 6 January 2026 | Reviewed | Useful, optional | No change in commitments |
| APA Group, *2025 Climate Transition Plan* | Reviewed | Critical | Commitments in force for FY2026 |
| APA Group, FY25 suite (Annual Report, Data Book, methodology) and the FY22–FY24 climate reports, data books and 2022 CTP | Reviewed | Material, not critical | Prior periods; context only (SEC-SF-11). The FY2025 diagnosis in 051_APA Group/FY2025/ was read as the record of prior findings |
| Clean Energy Regulator, NGER register FY2025-26 | Not published at review date | Critical for A-01C | Checked against the register extract held in reference/, which is FY2024-25. Absence of the later year is timing, not non-reporting |
Completeness screen (A-01A). No critical document is missing for the reviewed year. Documents retrieved from apa.com.au on 30 September 2026.
| Evidence ID | Source (doc · page/table) | What it shows | Linked claim / finding | Rule IDs | Status |
|---|---|---|---|---|---|
| EV-01 | DB26 GHG emissions tab; AR26 folio 118 | Scope 1 1,703,296; Scope 2 LB 95,554 (line 82,610, grid 12,945); MB 82,610; consolidated 1,667,223 and investees 36,073; FY25 comparative 1,862,661 in the disaggregated table; total line FY25 1,874,546 restated | §3.1, F-11, F-12 | G-06, G-07, S2-26, S2-28, S2-29 | Confirmed |
| EV-02 | DB26 GHG emissions tab, gas infrastructure; AR26 folio 111 | Adjusted gross = net 422,131 vs 532,786 (−20.8%); no credits; FY25 restated 497,484 gross, 459,902 net (13.7%) | F-4, §3.3 | T-11, T-BASE-01 | Confirmed |
| EV-03 | AR26 folio 111 | "Emissions reductions were partially due to lower gas transmission volumes. If gas flows were to increase in future years, it may result in lower emissions reductions"; "Excluding growth and including additional estimated abatement ... this reduction improved to 27%"; "APA has not established an accompanying gross target" | F-4, F-5, F-9 | A-19, G-BAU, S2-36 | Confirmed |
| EV-04 | AR26 folio 82 | 50,078 t compressor efficiency abatement; 1,367 t CH₄ (38,272 t) methane abatement; "Some reduction is due to changes in gas flows" | F-4, F-2 | A-19 | Confirmed; APA estimates |
| EV-05 | DB26 Rebaselining tab | FY21 enhanced methane adjustments by asset: Dandenong LNG −22,466; Mondarra −8,160; SWQP +13,146; MSP +38,864; Central Ranges −3,364; Central West −2,403; EGP −5,428; total +10,188. Allgas −28,814 and Central Ranges network −2,073 | F-4, F-1, F-16 | T-BASE-01, G-10, YOY-04 | Confirmed |
| EV-06 | DB26 Enhanced methane tab | FY26, tCO₂e, enhanced vs regulated: SWQP 25,338 vs 21,774; EGP 797 vs 6,886; Mondarra 3,554 vs 10,357; MSP 55,873 vs 33,763; Central Ranges 16 vs 3,393; Central West 163 vs 2,967; Dandenong LNG 2,540 vs 25,700; totals 88,281 vs 104,839 | F-4, F-1 | T-BASE-01, A-21 | Confirmed; swing 26,746 = 5.0% of 532,786 |
| EV-07 | DB26 Assets tab | Natural gas delivered: FY21 1,268.6 PJ (DB25); FY25 1,245.4 PJ; FY26 1,121.8 PJ | F-4, F-15 | A-19, G-BAU | Confirmed; −9.9% in the year |
| EV-08 | DB26 GHG tab, gas CO₂ and Energy tab | Gas combustion CO₂ 263,043 → 208,097; energy consumed 6.66 → 5.26 PJ | §3.3 | A-19 | Confirmed |
| EV-09 | AR26 folio 111 | "In FY26, as our Goldfields Gas Pipeline remained under the 100,000 t CO2-e Safeguard Mechanism threshold and SWQP dropped below the threshold for the first time, there were no carbon credit surrenders" | §3.3 | G-11, E-08 | Confirmed |
| EV-10 | AR26 folio 117 | "structural abatement is currently anticipated to contribute about half of the emissions reduction forecast by FY30 with the balance being from carbon credits surrendered to meet our Safeguard Mechanism obligations and, where necessary, to address any residual gap" | F-5, §5.2 | S2-36, G-11 | Confirmed |
| EV-11 | AASB S2 paragraph 36(c) | "If the entity discloses a net greenhouse gas emissions target, the entity is also required to separately disclose its associated gross greenhouse gas emissions target" | F-5, G1 | S2-40, L-05 | Confirmed from the standard |
| EV-12 | AR26 folio 111, methane | 7,538 t vs 7,934 adjusted (−5.0%); NGI growth about 241 t; 16% excluding growth with estimated abatement | §3.3 | T-11 | Confirmed |
| EV-13 | DB26 GHG tab, power generation; Safeguard tab | 1,266,668; 4,045,709 MWh; 0.31 (−18.5%); ACCUs issued 169,418; surrendered 98,164; Newman covered 398,901, baseline 470,154, NEN 568,319 | F-10, F-3 | T-14, E-08, E-13 | Confirmed |
| EV-14 | DB26 Carbon credits tab | Units surrendered 101,845: 98,164 Newman Safeguard (HIR and savanna), 3,681 business travel (savanna); holdings as at 1 August 2026 37,127 savanna units; Newman KACCUs not listed | F-10, F-18 | E-08, E-12 | Confirmed |
| EV-15 | DB26 GHG tab, transmission | Line losses 139,281 → 82,610; no footnote. Methodology 2026: no change noted | F-11, F-17 | G-10, S2-28 | Confirmed |
| EV-16 | AR26 folios 83, 116 | Category 15 gas −44%: "reduced fuel gas used on the VTS associated with the reduced compression at our Brooklyn compressor station, primarily due to the implementation of the Western Outer Ring Main project, and at our Gooding compressor station due to lower volumes of Longford gas flow"; engagement 24%; suppliers with a net zero goal 32% | F-7 | T-PROC-05, T-COV-02 | Confirmed |
| EV-17 | AR26 folio 81 | Progress snapshot: 20.8%, 18.5%, 44%, 24% | F-8 | OUT-TB-02, OUT-TB-03 | Confirmed |
| EV-18 | AR26 folio 111 footnote 1; AR25 folio 93 footnote 1 | FY26: underlying includes "methane emissions estimates for facilities where APA's enhanced methane methodology is applied"; FY25: "emissions excluding emissions associated with growth and including non-reportable methane abatement and offsets" | F-9 | YOY-04, OUT-TB-08 | Confirmed |
| EV-19 | AR26 folio 84 | "Our Scope 1 and Scope 2 emissions reduction targets and goals for 2030 cover 95% of our operational emissions"; target and goal definitions | F-13 | T-COV-02 | Confirmed; gas 24.4%, power 70.9% |
| EV-20 | AR26 folios 90–91 | "we expect to see growth in our emissions, which will affect the trajectory of our decarbonisation pathway post 2030"; "it is not currently feasible to provide detailed analysis of APA's decarbonisation pathways post 2030"; ECGG Stage 3 about 25 kt in FY30; South West Pipeline about 5 kt, Scope 3; NEAP "likely to exceed the current Safeguard Mechanism threshold", 2032–2034 | F-6 | T-DEP-04, S2-14 | Confirmed |
| EV-21 | AR26 folio 104 | Transition: "0% and $0 million of APA's business activities are vulnerable"; physical: "0% and $0 million of APA's assets are assessed as being vulnerable"; threshold moderate risk (>−15% to −25%) on the house view | §5.2 | S2-29, S2-22 | Confirmed |
| EV-22 | AR26 folio 101 | "In aggregate, impacts on APA Group were quantitatively modelled to be 'negligible' across all time horizons and scenarios considered" | §5.2 | S2-22, N-04 | Confirmed |
| EV-23 | AR26 folios 95–96 | Medium- and long-term financial effects "cannot be reliably quantified"; FY27–FY29 $131m capex and $24m opex on gas abatement; $1.1bn power growth capex | I2 | S2-15, S2-21 | Confirmed |
| EV-24 | AR26 folio 149, remuneration | Climate 10%: "achieved the stretch emissions reduction targets"; AR26 folio 111: internal in-year abatement target "for management purposes including to inform executive and employee remuneration" | F-14 | GOV-05, A-11, S2-29(g) | Confirmed |
| EV-25 | AR26 folios 120–126, Deloitte (mandatory) | Audit opinion: Scope 1 and 2 emissions (29(a)(i)(1)–(2), 29(a)(ii)–(v)); gas infrastructure adjusted net; renewable %; methane adjusted and change; power intensity. Review: governance, strategy risks and opportunities, Scope 3 and supplier metrics | A4 | GOV-10, GOV-11 | Confirmed from rendered pages |
| EV-26 | AR26 folios 127–128, Deloitte (voluntary) | Limited assurance over Scope 3 detail, end-user emissions and enhanced methane data for seven assets | A4 | GOV-10 | Confirmed |
| EV-27 | AR26 folio 87 | Directors' declaration; first-year relief from comparatives, voluntary comparatives given; GHG Protocol standards named | G1 | L-05, S2-01 | Confirmed |
| EV-28 | AR26 folio 82 | "Maintain our Scope 2 emissions at zero", under "Decarbonising gas infrastructure"; renewable interim milestone "Procure 100% renewable electricity for grid consumed electricity by FY23" | P1 | OUT-TB-21 | Confirmed; bounded by its section |
| EV-29 | DB26 end-user emissions | 60,135,397 | D8-01 | SEC-PROP-01 | Confirmed |
| EV-30 | AR26 folio 85 | North to south east coast gas capacity "forecast ... to increase by around 50% by FY30 relative to FY25" | D8-01 | SEC-PROP-01 | Confirmed |
| Claim ID | Wording / paraphrase | Claim object | Claim source & basis (OUT-TB-15) | Doc & location | Strength | Audience | Evidence req/found/missing | Triggered scans | Rule IDs | Status |
|---|---|---|---|---|---|---|---|---|---|---|
| CL-01 | "20.8% reduction in gas infrastructure underlying gross emissions relative to our adjusted FY21 base year ... without needing to surrender any carbon credits" | Gas target progress | Audited adjusted net figure; self-declared attribution | AR26 folios 78, 81, 111 | Strong | All | Required: driver split. Found: named drivers, flow caveat unquantified. Missing: split | Target achievement; methodology change | T-11, A-19, T-BASE-01 | Substantiated as a figure; decision-usefulness concern on drivers |
| CL-02 | "This is a considerable achievement" | Characterisation | Self-declared | AR26 folio 78 | Moderate | Public | N/A | N/A | OUT-TB-02 | Not tested as a claim; context for P2 |
| CL-03 | "18.5%▼ power generation operational emissions intensity" | Power goal progress | Audited | AR26 folios 81, 114 | Strong | All | Missing: disposition of issued credits | Intensity; offsets | T-14, E-13 | Substantiated gross; cannot verify on double claim |
| CL-04 | "44%▼ gas infrastructure owned but not operated asset emissions" | Category 15 gas goal | Reviewed (ASSA 5010) | AR26 folios 81, 116 | Strong | All | Found: drivers stated at folio 116 | Scope 3; supplier / operator dependency | T-DEP-04, A-19 | Substantiated; driven by operator activity and ring main |
| CL-05 | "targets and goals for 2030 cover 95% of our operational emissions" | Coverage | Self-declared | AR26 folio 84 | Strong | Retail | Found: 24.4% target, 70.9% goal | Coverage % | T-COV-02 | Decision-usefulness concern |
| CL-06 | "Maintain our Scope 2 emissions at zero" | Gas infrastructure Scope 2 | Self-declared, within the gas infrastructure section | AR26 folio 82 | Moderate, bounded by section | All | Gas infrastructure market-based Scope 2 is 0 | 100% renewable | OUT-TB-21 | Literally true within its section |
| CL-07 | "APA has not established an accompanying gross target" | Target architecture | Self-declared | AR26 folio 111 | N/A | Regulators | AASB S2 36(c) | Net target | S2-40 | Potential compliance concern |
| CL-08 | "achieved the stretch emissions reduction targets" | Remuneration outcome | Audited remuneration report | AR26 folio 149 | Strong | Institutional; regulators | Missing: target value, flow treatment | Remuneration | GOV-05, A-11 | Cannot verify |
| CL-09 | "0% and $0 million of APA's business activities are vulnerable to climate-related transition risk" | Cross-industry metric | Reviewed within strategy | AR26 folio 104 | Strong | Institutional | Found: method and threshold; house view only | Scenario analysis | S2-22, S2-29 | Substantiated on its stated method; decision-usefulness concern on the choice |
| CL-10 | "In FY26, of the 24 industry associations reviewed, 24 were found to be aligned with APA's climate position" | Association alignment | Self-assessed | AR26 folio 75 | Moderate | Public | Not a climate performance claim | N/A | A-16 | Screened out as immaterial |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D1-01 | FY2026 is APA's first mandatory year. Directors' declaration made; first-year comparative relief taken, comparatives given voluntarily (EV-27) | Applicable (L-05, S2-01) | Statement complete across governance, strategy, risk management, metrics and targets | No apparent issue · High | None | N/A |
| D1-02 | The 30% gas target is net; "APA has not established an accompanying gross target" (EV-03); AASB S2 36(c) requires the associated gross target to be disclosed (EV-11) | Potential compliance concern: a required disclosure not made | The gross performance series is published beside the net, so the gap is architecture rather than data | Potential compliance concern · High | First-year statement does not meet one requirement as written | Set and disclose the gross target |
| D1-03 | Medium- and long-term financial effects stated as not reliably quantifiable, with reasons (EV-23) | Permitted by the standard where the conditions are met and explained | Explanation given; no finding | No apparent issue · Medium | None | N/A |
| D1-04 | Mandatory emissions table shows FY25 Scope 1 unrestated (1,862,661) while the data book restates it to 1,874,546 (EV-01) | Comparatives are voluntary under first-year relief | Two figures for one year in one suite | Minor limitation · High | F-12 | Restate or label |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D2-01 | Enhanced methane method incorporated for seven assets; history restated by asset with the assumption that "Methane emission rates measured during FY24–FY26 are representative of historical emissions sources unless material changes" (EV-05; AR26 folio 110) | No apparent issue: method changes are disclosed and the base is recalculated | F-1: the restatement raises the base on compressed assets. The effect of the change on the headline is not stated (D6-01) | No apparent issue on the method; see D6-01 · High | None on its own | State the effect |
| D2-02 | Disaggregated consolidated and investee Scope 1 and Scope 2 (EV-01) | Meets AASB S2 29(a)(iv) | Baseline | No apparent issue · High | None | N/A |
| D2-03 | Gas Scope 1 includes part-year emissions of divested networks, removed in the adjusted series (EV-05) | No apparent issue; disclosed in footnote 3 | Transparent | No apparent issue · High | None | N/A |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D3-01 | Line losses fell 40.7% with no stated cause (EV-15) | A material movement in audited Scope 2 without explanation | The largest single inventory movement has no driver; it also raises the target-and-goal coverage from 93% to 95% | Decision-usefulness concern · High | F-17 | Explain |
| D3-02 | Market-based line losses reuse the location-based value (DB26 footnote 2) | Disclosed departure from residual mix | Unchanged from FY25 | Minor limitation · Medium | None new | Residual mix |
| D3-03 | Renewable claim now bounded to grid-consumed electricity; the FY25 "zero Scope 2 emissions for purchased and acquired electricity" and transmission "total ... 99% lower" statements are not repeated (EV-28) | No apparent issue | Improvement on the prior report; the bounded claim is true (OUT-TB-21) | No apparent issue · High | None | N/A |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D4-01 | All fifteen categories screened; Scope 3 reviewed under ASSA 5010 and limited-assured (EV-25, EV-26) | Meets AASB S2 29(a)(vi) | Complete; OUT-STK-13 not triggered | No apparent issue · High | None | N/A |
| D4-02 | Scope 3 −18.7% on lower spend, lower gas use, expired contracts and less VTS compression | No apparent issue | Activity-driven (A-19); correctly described by APA | No apparent issue · High | None | N/A |
| D4-03 | Category 15 gas goal of 20% at 44%, driven by the ring main and lower Longford flows on an AEMO-operated system; engagement goal at 24% (EV-16) | No obligation to set Scope 3 goals | The reduction goal was met before it was set and is now met twice over; the engagement goal is a process measure (T-PROC-05). Category 3, the largest category, has no goal | Decision-usefulness concern · High | F-7 | Forward goals |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D5-01 | No credits for the gas target in FY26 because surrenders are Safeguard-only and no gas facility had an obligation (EV-09) | No apparent issue | Consistent with the 2025 CTP. Framed as "a considerable achievement"; the reason is policy and the threshold, which the report states | Minor limitation · High | Reader credits the zero to abatement | State the reason in the headline |
| D5-02 | About half the FY30 gas reduction is planned from credits (EV-10) | Disclosed as AASB S2 36(e) requires | Transparent; not a defect | No apparent issue · High | None | N/A |
| D5-03 | 169,418 ACCUs issued at Newman; not in holdings; power goal measured gross (EV-13, EV-14) | No apparent issue under the Safeguard rules | Double-claim risk on the intensity goal if sold | Cannot verify, material evidence missing · Low | F-18 | Disposition |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D6-01 | 20.8% not split between efficiency, methane projects, throughput (−9.9%), certificates and a 5.0-point method swing (EV-02, EV-03, EV-04, EV-06, EV-07) | AASB S2 33 and 34 met on the figure; no driver split required | A-19 and T-BASE-01: the movement is not decomposed against throughput and method. The caveat is unquantified | Decision-usefulness concern · High | F-4 | Driver bridge |
| D6-02 | Power generation under an intensity goal, 70.9% of operational emissions (EV-19); growth post-2030 with no pathway (EV-20) | No apparent issue | T-14 and T-DEP-04 | Decision-usefulness concern · High | F-6 | Absolute pathway |
| D6-03 | "Underlying" redefined between FY25 and FY26 (EV-18) | No apparent issue; each year defines it | YOY-04 and OUT-TB-08: same word, different measure, change not flagged | Decision-usefulness concern · Medium | F-9 | One definition |
| D6-04 | Coverage stated as 95% for targets and goals (EV-19) | No apparent issue | T-COV-02; unchanged from FY25 | Decision-usefulness concern · High | F-13 | Separate coverage |
| D6-05 | Growth emissions for approved projects disclosed (EV-20) | Meets transition-plan disclosure | Baseline; not credited (A-16) | No apparent issue, baseline (not credited) · High | None | N/A |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D7-01 | Climate 10% of STI; "achieved the stretch emissions reduction targets"; internal in-year target undisclosed (EV-24) | AASB S2 29(g) met on the percentage | GOV-05: the metric and its throughput treatment are not disclosed in a year the report attributes part of the result to lower flows | Decision-usefulness concern · Medium | F-14 | Disclose |
| D7-02 | Audit opinion over Scope 1 and 2 and target metrics; review over governance, strategy and Scope 3 (EV-25) | Meets ASSA 5010 for year one and goes beyond it | Baseline; not credited | No apparent issue, baseline (not credited) · High | None | N/A |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D8-01 | SEC-PROP-01: end-user emissions 60.1 MtCO₂e (EV-29), quantified and assured; no improvement plan; transport capacity to rise about 50% by FY30 (EV-30) | No apparent issue; correctly outside Scope 3 | Quantification limb met, plan limb not; the growth plan now points the other way. Decision-usefulness concern, not an exclusion | Decision-usefulness concern · High | Largest dependent emissions outside every commitment | Plan addressing transported volumes |
| D8-02 | Transition vulnerability 0% and $0 on the house view with a 15% threshold; aggregate "negligible" across scenarios (EV-21, EV-22). The FY25 report showed West Coast Gas at low risk under 1.5°C | Meets the cross-industry metric on its stated method | The aggregation removes the business-unit granularity the FY25 report gave; decision-usefulness concern for investors pricing a 1.5°C case | Minor limitation · Medium | Reduced granularity | Show results by business unit |
Financed-emissions target headroom & benchmark (SEC-FI-TGT-04): N/A, not a financial institution.
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D9-01 | Group physical-risk procedure established; 0% and $0 of assets vulnerable on a high-residual-risk threshold under SSP2-4.5 (EV-21) | Meets AASB S2 29(c) on its method | Relevant and transparent (N-04); the metric is financially expressed | No apparent issue · Medium | None | Publish the residual ratings |
| Base issue | Chains to | Rule + evidence IDs | Escalated severity |
|---|---|---|---|
| Driver split missing (D6-01) | The headline (CL-01), the snapshot (CL-04), and the remuneration outcome (CL-08) | A-19, T-BASE-01, GOV-05 · EV-03, EV-06, EV-07, EV-24 | Load-bearing for I3 and P2 |
| Net target without gross target (D1-02) | Directors' declaration and the remuneration measure | S2-40, A-11 · EV-03, EV-11 | Potential compliance concern |
| Newman credits (D5-03) | The power intensity goal (CL-03) | E-13, T-14 · EV-13, EV-14 | Held at cannot-verify |
| Line losses unexplained (D3-01) | Coverage 93% → 95% (CL-05) | G-10, T-COV-02 · EV-15, EV-19 | Decision-usefulness concern |
| Screen | Output | Basis |
|---|---|---|
| Required Interventions Schedule | Potentially applicable; evidence required | Methane recovery and compressor electrification; one recovery project in delivery and an electric compressor selected for Uranquinty |
| Clean Alternative Assessment | Applicable | About half the FY30 gas reduction planned from credits |
| Prohibited Activities Schedule | Not apparently applicable | Gas transmission, storage, power generation and electricity transmission. Screen only |
| Rule family | Applied? | Result |
|---|---|---|
| Applicability gate (L / S2-01..06) | Yes | Mandatory year (D1-01); gross target (D1-02) |
| GHG inventory foundation (G / GHG-STD) | Yes | Method change disclosed (D2-01) |
| Scope 1 (G-06 / S2-26) | Yes | Disaggregated (D2-02) |
| Scope 2 & renewables (E / S2-28) | Yes | Line losses unexplained (D3-01); claims now bounded (D3-03) |
| Scope 3 (S3 / S3A / G-15) | Yes | Complete (D4-01); goals (D4-03) |
| Offsets / net claims (E-08..22 / G-11) | Yes | Zero credits framing (D5-01); Newman (D5-03) |
| Targets & transition (T / S2-14/15/40) | Yes | D6-01 to D6-05 |
| Governance / remuneration / assurance (GOV / A-11) | Yes | D7-01, D7-02 |
| Sector (SEC-*) | Yes | SEC-PROP-01 (D8-01) |
| SEC-FI-TGT-04 | No | Not a financial institution |
| SEC-FI-05A | No | Not a financial institution |
| SEC-SF / SEC-INV-LT | Partly | SEC-SF-11 on the redefined term and the aggregated scenario results |
| NOCO2-MAP-01/02 | Yes | §6.1 |
| Nature / physical risk (N) | Yes | D9-01 |
| A-01C / DR-01..07 | Yes | FY2025-26 register not yet published; prior-year comparative reconciled |
| YOY-01..08 | Yes | Six periods (Annex K) |
| ID | Item | Pack | Evidence requested | Status |
|---|---|---|---|---|
| K-01 | Throughput effect | Target progress | Throughput and compressor fuel by pipeline, FY21, FY25, FY26 | Open (F-15) |
| K-02 | Method swing | Target progress | Base-year reconstruction by asset | Open (F-16) |
| K-03 | Line losses | Scope 2 | Loss volumes and cause | Open (F-17) |
| K-04 | Newman credits | Offsets | Disposition of 169,418 and 63,088 units | Open (F-18) |
| K-05 | NGER FY2025-26 | Assurance | Register row | Open (F-19), timing |
| K-06 | Climate STI | Remuneration | In-year target and throughput treatment | Open |
| Chain ID | Trigger | Follow-up scans run | Evidence IDs | Final label |
|---|---|---|---|---|
| CH-01 | Target achievement (20.8%) | Base restatement, method change, throughput, credits, remuneration | EV-02 to EV-09, EV-24 | Decision-usefulness concern |
| CH-02 | Net target | AASB S2 36(c) | EV-03, EV-11 | Potential compliance concern |
| CH-03 | Methodology change | Asset-by-asset re-baseline and FY26 measurement | EV-05, EV-06 | Disclosed; effect not stated |
| CH-04 | Coverage 95% | Numerator and denominator | EV-19 | Decision-usefulness concern |
| CH-05 | Multi-period | FY21–FY26 restated series; FY25 as first reported | EV-01, EV-18 | Recorded in Annex K |
| CH-06 | Credits issued at a facility | Safeguard statement, holdings, goal basis | EV-13, EV-14 | Cannot verify |
| CH-07 | Transported energy | End-user, capacity growth | EV-29, EV-30 | Decision-usefulness concern |
| CH-08 | Screened out | Association alignment | N/A | Immaterial (A-16) |
O.1 Cross-source consistency matrix (DR-02)
| Claim / metric | Annual / financial report | Sustainability / ESG | Marketing / website | Climate Active PDS | CDP | Investor presentations | NGER / CER / Safeguard | Boundary/period normalisation | Divergence? |
|---|---|---|---|---|---|---|---|---|---|
| Scope 1 FY2026 | 1,703,296 | 1,703,296 | Not reviewed | N/A | Not reviewed | Not reviewed | Not yet published | N/A | Cannot verify |
| Scope 1 FY2025 comparative | 1,862,661 (mandatory table) | 1,874,546 (data book total) | Not reviewed | N/A | Not reviewed | Not reviewed | 1,862,642 | Different methods | Yes, within the suite |
| Climate incentive | "achieved the stretch emissions reduction targets" | 20.8%, partly lower volumes | Not reviewed | N/A | Not reviewed | Not reviewed | N/A | Threshold undisclosed | Cannot verify |
O.2 NGER statutory reconciliation (A-01C)
| Metric | Disclosed (report) | NGER register (year · as-at) | Boundary difference (op-control / AU-only / method / period) | Reconciled? | Label |
|---|---|---|---|---|---|
| Scope 1 | 1,703,296 | FY2025-26 not yet published | Enhanced methane for seven assets is not used for NGER, so the register will differ by method | Not yet | Cannot verify, evidence not provided |
| Scope 2 (location-based) | 95,554 | Not yet published | None expected | Not yet | Cannot verify, evidence not provided |
| Net energy (GJ) | 20.36 PJ (4.09 + 15.77 + 0.49) | Not yet published | Definition | Not yet | Cannot verify, evidence not provided |
O.3 Disclosure-risk register (DR-01 / DR-03..DR-07)
| # | Lens | Exposure & confidence | Driver (finding / evidence IDs) | Cross-source link (DR-02) | What would reduce it |
|---|---|---|---|---|---|
| O-1 | Legal | Moderate · Medium | D1-02, D6-01, D7-01; EV-03, EV-24 | O.1 row 3 | Gross target; driver split |
| O-2 | Regulatory | Moderate · High | D1-02, D1-04, D3-01 | O.1 row 2 | Close the three items |
| O-3 | Technology | Moderate · Medium | D5-02; EV-10 | None | Lever-by-lever pathway |
| O-4 | Physical | Low · Medium | D9-01 | None | Residual ratings |
| O-5 | Other (market) | Moderate · Medium | D8-01, D8-02; EV-21, EV-22, EV-30 | None | Business-unit scenario results |
P.1 Multi-period headline series (YOY-02)
| Metric / claim | Period → | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 | Source(s) per cell | Boundary/method normalisation |
|---|---|---|---|---|---|---|---|---|---|
| Scope 1 | 1,440,167 | 1,503,042 | 1,389,402 | 1,915,392 | 1,874,546 | 1,703,296 | DB26 total line | Restated for methane method and divested networks | |
| Scope 2 (location) | 81,790 | 92,693 | 152,018 | 141,843 | 150,471 | 95,554 | DB26 | ||
| Scope 2 (market) | 81,791 | 92,693 | 137,643 | 129,718 | 139,281 | 82,610 | DB26 | ||
| Scope 3 by category | 771,671 | 853,473 | 815,284 | 664,598 | 636,284 | 517,404 | DB26 | ||
| Total | Not stated | Not stated | Not stated | Not stated | Not stated | 2,316,254 (review sum) | Review arithmetic | S1 + S2 LB + S3 gross | |
| Intensity metric (power) | 0.384 | 0.385 | 0.367 | 0.341 | 0.339 | 0.313 | DB26 | ||
| Renewable electricity % | 0% | 0% | 100% | 100% | 100% | 100% | DB26 | Grid electricity only | |
| Offset / certificate volume | 0 | 19,537 | 22,409 | 53,347 | 44,465 | 101,845 | DB24–DB26 | FY26 all Safeguard or business travel |
P.2 Silent restatement & baseline-rebasing log (YOY-04)
| # | Figure / baseline | As stated in report of the period | As restated in a later report | Disclosed & like-for-like? | Effect on an on-track / pay / financing claim | Label (concern / acceptable / cannot-verify) |
|---|---|---|---|---|---|---|
| P2-1 | FY21 gas base | 553,512 (DB25) | 532,786 (DB26) | Disclosed by asset | Changes every progress figure | Acceptable; effect on the headline cannot verify |
| P2-2 | FY21 methane base | 8,920 t (DB25) | 7,934 t (DB26) | Disclosed | Methane progress | Acceptable |
| P2-3 | FY25 gas progress | 6.5% gross, 13.3% net (AR25) | 6.6%, 13.7% (DB26) | Disclosed | Minor | Acceptable |
| P2-4 | FY25 methane | +3.1% (AR25) | +4.7% (DB26) | Disclosed | Base-year and FY25 both moved | Acceptable |
| P2-5 | FY25 Scope 1 | 1,862,659 (AR25) | 1,874,546 (DB26 total); 1,862,661 (AR26 mandatory table) | Two figures | Mandatory comparison | Minor concern |
P.3 Dropped / added disclosure log (YOY-05)
| # | Item (metric / category / target / claim / limitation) | Present in | Absent/added in | Explained? | Label |
|---|---|---|---|---|---|
| P3-1 | "Underlying" as growth-excluded measure | AR25 (22.3%) | Redefined AR26 | Glossary only | Concern (D6-03) |
| P3-2 | Transmission "total ... 99% lower" and "zero Scope 2" statements | AR25 | Absent AR26 | N/A | Resolved |
| P3-3 | Scenario results by business unit | AR25 heatmap | Aggregated in AR26 | Partly | Minor concern (D8-02) |
| P3-4 | Growth-project emissions for approved projects | CTP25 commitment | Added AR26 | Yes | Delivered |
P.4 Target-trajectory log (YOY-06 / YOY-08)
| # | Target / claim | Base yr | Target yr | Coverage / scope | Change across periods (weakened / extended / rebased / re-scoped / retired / replaced) | On-track survives series? | Label |
|---|---|---|---|---|---|---|---|
| P4-1 | Gas infrastructure 30% | FY21 | FY30 | Gas S1+S2, net | Rebased (method and divestments) | 20.8% gross = net | Driver split open |
| P4-2 | Methane 30% | FY21 | FY30 | Operational methane | Rebased | −5.0% | Open |
| P4-3 | Power intensity 35% | FY21 | FY30 | Power S1+S2 | Unchanged | −18.5% | Qualified |
| P4-4 | Category 15 gas 20% | FY21 | FY30 | 21% of Category 15 | Unchanged | −44% | Met by activity and ring main |
| P4-5 | Net zero operational | N/A | 2050 | All operations | Unchanged since FY25 deferral | No post-2030 pathway | Concern |
P.5 Cross-report-type consistency over time (YOY-07 / DR-02)
| # | Claim / metric | Report types compared | Per-period divergence (after normalisation) | Trend in divergence | Audited-source preference applied (A-01B) | Label |
|---|---|---|---|---|---|---|
| P5-1 | Offset approach timing | CTP25 vs AR25 vs AR26 | FY25 divergence; FY26 consistent | Resolved | AR26 | Resolved |
| P5-2 | Net zero timing | CTP25 vs AR25 vs AR26 | FY25 divergence; FY26 states 2050 consistently | Resolved in presentation | AR26 | Resolved |
| P5-3 | FY25 Scope 1 | AR26 mandatory table vs DB26 | FY26 only | New | Mandatory table matches NGER | Minor concern |
*Prepared under the Climate Disclosure Review Rules v15.23 (controlled AI-assisted review). The body (§1–§7) states the verdict and may be issued on its own; the annexes are the working layer. General information only: not legal, financial or investment advice, an audit, an assurance opinion, or a NoCO2 certification or conformance determination. © Carbon Reduction Institute Pty Ltd, ABN 26 122 969 233.*
Each audience score is built from a fixed set of load-bearing criteria, marked before the score is set. "Partial" means the criterion is satisfied only with reader effort that this audience can reasonably spend, not a soft failure. The count matters as well as the score: a score can reach its floor on two failed criteria, so two reports sharing a score may sit some distance apart on the detail below.
| # | Audience | Criterion | Verdict | Why |
|---|---|---|---|---|
| A1 | Carbon accounting | No material category excluded | Pass | All fifteen categories screened with reasons; Scope 3 reviewed and limited-assured; end-user emissions correctly outside Scope 3 and quantified |
| A2 | Carbon accounting | Single reconcilable footprint | Pass | One FY2026 inventory, audited, with an equity view and a consolidated/investee split |
| A3 | Carbon accounting | Method, boundary and version transparency | Partial (workable) | The methane method and re-baselining are documented by asset. Two traceability gaps: line losses fell 40.7% unexplained, and two FY2025 Scope 1 totals sit in one suite. Workable: the accountant's action is to lift the audited FY2026 figures, which carry no ambiguity, using the methodology's stated method. Recorded as workable and not counted as a gap |
| A4 | Carbon accounting | Granularity and assurance sufficient to lift | Pass | Audit opinion over Scope 1 and 2; review over Scope 3 |
| I1 | Institutional investors | Physical risk relevant and transparent (N-04) | Pass | Group procedure; financially expressed metric (0% and $0 of assets vulnerable) with its threshold and scenario stated |
| I2 | Institutional investors | Transition risk: derivable target headroom | Not met | The absolute cap covers 24.4% of operational emissions; the power goal over 70.9% is intensity with no cap; APA expects growth after 2030 and gives no pathway; about half of the gas target by FY30 is planned from credits |
| I3 | Institutional investors | Target achievement: real reductions, honest progress | Not met | The 20.8% cannot be separated into abatement, 9.9% lower throughput and a 5.0-point method swing; the power intensity progress does not net the 169,418 issued credits; no driver split is given for the remuneration outcome |
| I4 | Institutional investors | Portfolio / financed-emissions completeness | Pass | Not a financial institution; Category 15 by asset class |
| I5 | Institutional investors | Flow-through / look-through exposure | Pass | Non-operated assets quantified and split; growth-project emissions disclosed |
| I6 | Institutional investors | Reconstructability by a sophisticated reader | Pass | The method swing, throughput and asset-level data are published, which is how this review derived them |
| R1 | Retail investors | Headline matches evidence without cross-document work | Partial (workable) | The 20.8% is on the audited basis and uses no credits; the flow caveat sits beside it on the same page ("Some reduction is due to changes in gas flows"). Workable: the reader's action is to read the co-located caveat and discount the figure; the data is the caveat itself. Recorded as workable and not counted as a gap |
| R2 | Retail investors | Targets cover material sources; achievement honest | Not met | The 95% coverage adds a goal without a pathway to a target over 24%; neither Scope 3 goal requires further reduction |
| R3 | Retail investors | Material risks legible | Pass | Risk tables readable; vulnerability metrics stated plainly |
| R4 | Retail investors | Caveats findable, understandable, fairly presented | Not met | "Underlying" changed meaning without a flag; the method effect on the base is not mentioned beside the headline; the issued Newman credits are not mentioned beside the intensity result |
| P1 | Consumers & public | Claims literally true within their implied boundary | Pass | The FY25 statements contradicted by APA's tables are not repeated; the renewable claim is bounded to grid electricity; "Maintain our Scope 2 emissions at zero" sits within the gas infrastructure section, where it is true |
| P2 | Consumers & public | No greenwashing or misleading composite impression | Not met | The snapshot presents 20.8%, 18.5% and 44% reductions and "a considerable achievement" without credits. Two of the three rest materially on lower gas flows, and the snapshot does not say so. Growth after 2030 and the planned half-reliance on credits by FY30 sit in the mandatory section. Stated as reader impression; no intent is inferred |
| P3 | Consumers & public | Genuine climate action evidenced | Pass | Valve replacement, leak repair, electric compressors, renewables and storage, and direct methane measurement in the inventory |
| G1 | Regulators | Standards compliance / readiness | Partial (workable) | A complete first-year statement with one requirement not met as written: no gross target beside the net target (a potential compliance concern in §2.3). Workable: the regulator's action is to read APA's explicit statement that no gross target was set together with the gross series APA publishes beside the net; both are on folio 111. Recorded as workable and not counted as a gap |
| G2 | Regulators | Cross-source / audience consistency | Partial (workable) | Two FY2025 Scope 1 totals in one suite, and "underlying" redefined. Workable: data book footnote 3 explains the restatement and the regulator figure matches the mandatory table. Recorded as workable and not counted as a gap |