Improved to not decision-useful for institutional investors, because the claims narrowed to their stated boundaries, while neither absolute target has a quantified pathway
Reporting periodFY2026
Review date1 September 2026
ProtocolClimate Disclosure Review Rules v15.23
SectorMining
9 / 15overall score · sum of the five audience ratings, for ranking
5 of 19 load-bearing criteria not met. The score saturates, because a row reaches 1 on two failures and cannot go lower, so the criterion count is reported beside it. The two answer different questions: the score is how many audiences can use the disclosure, the count is how many things are wrong.
This review tests Fortescue's publicly available climate disclosure against CRI's Climate Disclosure Review Rules, which use the CRI Net Zero Standard as the reference for a credible claim together with AASB S2 Climate-related Disclosures. It reflects the information available at the review date, states what the evidence supports, what it does not, and what would resolve each open point, and says "cannot verify", not "no issue", where evidence is missing. It is general information, not legal, financial or investment advice, and not an audit or an assurance engagement. It does not allege illegality, misconduct, greenwashing or dishonesty. Organisations may contact CRI at robc@noco2.com.au to identify an error, provide relevant public information or request review of updated disclosures. See Important information at the end of this report.
Decision-usefulness at a glance
Company
Carbon / supply-chain accounting
Institutional investors
Consumer / retail investors
Consumers & public
Regulators
Fortescue Ltd (ASX: FMG)
2
1
2
2
2
How to read this report
How to read the ratings
Each audience gets its own rating.
The same disclosure can be reliable for one reader and misleading for another, so we rate decision-usefulness separately for each audience on the three-point scale below. There is no single pass/fail verdict — decision-usefulness is a judgement about each audience, not the report as a whole.
1
Not decision-usefulCannot be relied on in its current form for this reader's decision.
2
Mostly decision usefulUsable, with one material limitation the reader must work around.
3
Decision-usefulCan be relied on. A deliberately high bar.
The bar below adds the five audience ratings into an overall score out of 15. It is used only to rank reports against one another — it carries no band and no verdict label. Its colour simply reflects the mix of the five ratings: the more red, the more audiences the disclosure falls short for.
9 / 15
overall score · for ranking only
This review assesses whether the company's climate disclosure is *decision-useful*: whether a reader can actually rely on it for the decision they are making. Because a disclosure that is sound for one reader can mislead another, we score decision-usefulness separately for each of the main audiences that rely on climate disclosure. The audiences, and what each needs from the disclosure, are the same across all our reviews:
Audience
What they rely on the disclosure for
Carbon / supply-chain emissions accounting
Lifting the company's emissions figures into their own inventory. They need complete category coverage (nothing material excluded), a single reconcilable footprint, and a disclosed, transparent method. Whether a figure is estimated or supplier-specific is a maturity question, not a fault; the fault is exclusion.
Institutional investors
Pricing climate risk (physical and transition) including target credibility and whether targets are being met with real reductions, the completeness of financed / portfolio exposure, and flow-through exposure inherited from investees or counterparties whose own emissions may be growing. They can usually reconstruct detail, so they are judged on whether the true position is derivable.
Consumer / retail investors
Understanding the company's climate position and target progress without expert reconstruction. They need the headline claims to match the evidence, the material sources to be targeted, and caveats to be easy to find.
Consumers & public
Knowing whether the company's public claims are true: that it is genuinely acting rather than greenwashing, and not fuelling climate change while presenting otherwise. Headline claims matter most to this audience, which is least able to read past a buried caveat.
Regulators
Whether the disclosure is compliant, consistent across sources and audiences (does the company say one thing to one audience and something else to another), and useful across the board.
The overall score is simply the sum of the five audience ratings, out of 15. It has no band and no pass/fail label; we use it only to rank reports against one another; its colour bar reflects the mix of the five ratings (the more red, the more audiences the disclosure falls short for). §2.1 gives each audience's rating and the reason behind it; §1 covers scope and basis, §2.2–2.3 the evidence dashboard, §3 what the disclosure means for a reader, §4 the findings, §5 disclosure-risk, §6 how to fix it and §7 the conclusion; the working annexes show the rule-level derivation.
Two conventions apply throughout. A certification (including the Australian Government's Climate Active program) is treated as a claim to be tested, not as a strength in itself. Detailed disclosure and candour about a company's own gaps are the baseline expected of a credible discloser, not a credit.
1. Scope & basis
1.1 What we reviewed
Document
Reviewed?
If missing, effect on this review
FY26 Annual Report & Appendix 4E, including the Sustainability Report: Climate Statements (folios 69 to 107)
Yes
Primary, audited evidence base; Fortescue's first mandatory climate statement
FY26 Climate Transition Plan (voluntary companion)
Yes
Supplies the FY25 comparatives and the emissions-profile panel the audited statement omits under the first-year relief
FY26 Sustainability Report (standalone)
Yes
Public-facing narrative and claim wording
FY26 ESG Databook (emissions, energy, assurance and metric-definition sheets)
Yes
Multi-year figures, the market-based Scope 2 position and the restated FY21 baseline
FY26 Full Year Results announcement
Yes
Investor-facing framing of the reporting suite
PwC assurance reports: reasonable assurance opinion on Scope 1 and Scope 2; limited assurance conclusions on governance and strategy, on Scope 3, and on Eligible Project Cumulative Spend
Yes: all four are printed in the Annual Report
Assured scope confirmed directly from the reports, including the AASB S2 subparagraphs listed as criteria
Prior-period reports and data packs FY2021 to FY2025
The FY2025-26 register is not published at the review date, so the statutory cross-check cannot be run for the reviewed year; carried as a cannot-verify item, not as a finding against Fortescue
The per-category method summaries in the audited statement are unusually full, so this is a depth limitation only; emission factors and the base-year recalculation policy are not independently verified here
Documents covering FY2027 and later were not published at the review date. The audited Annual Report, including its Sustainability Report: Climate Statements, is the anchor; the Climate Transition Plan, the Sustainability Report and the ESG Databook are supporting material. Where an audited figure and a supporting source disagree, the audited figure is preferred and the difference is recorded.
1.2 Standards the company is held to or references
Standard / framework
Referenced by company?
How strongly
Sector module(s) applied
Corporations Act / Ch 2M
Yes: directors' declaration under sections 296C and 296D, signed 20 August 2026
Binding: first mandatory year FY2026; FY26 is Fortescue's first mandatory climate statement
Mining
AASB S2
Yes
In accordance with: "Prepared in accordance with", the strict formulation, with the first-year comparatives relief taken and the Scope 3 relief waived
Mining
ASIC RG 280
No: not expressly referenced
Not referenced: applies to the mandatory regime; no separate claim to test
Mining
GHG Protocol (Corporate / Scope 2 / Scope 3)
Yes: Corporate Standard, Corporate Value Chain (Scope 3) Standard, Scope 2 Guidance and Scope 3 Calculation Guidance all named
In accordance with: strong; method stated per category
Mining
PCAF (financed emissions)
Not applicable
Not applicable: not a financial institution
Not applicable
SBTi
Yes: validation stated as paused while the initiative reviews its standards, with re-initiation being assessed
Mentioned: disclosed as not validated; every target table records "Target validation by a third party: No"
Mining
Climate Active / other carbon-neutral framework
No
Not referenced: voluntary offsetting ceased in 2023; no carbon-neutral claim is made for FY26
Not applicable
Certificates (GreenPower / LGC / ACCU / REC)
Partly: Safeguard Mechanism ACCUs and SMCs are described, and 137 GWh of renewable electricity purchased appears in the data pack
Binding: ACCU and SMC use is stated as compliance-only and expressly excluded from the Real Zero Target; the electricity contracts behind the market-based figure are not described anywhere
Mining
Transition Plan Taskforce framework (structure of the voluntary plan); GLEC Framework v3.2; NGER Measurement Determination 2008
Yes
With reference to: named and used
Mining
1.3 Review basis & limitations
This is a standard review of Fortescue's FY2026 climate disclosure, run against the reviewed period and earlier only. The evidence base is unusually complete for a first mandatory year: all four assurance reports are printed in the Annual Report, every Scope 3 category carries a stated method and an evaluation status, and the voluntary Climate Transition Plan and ESG Databook fill the comparatives the audited statement omits. Two limitations bound the conclusions. The standalone FY26 Emissions Calculation Methodology was not obtained, so emission factors and the base-year recalculation policy are not independently verified. And the FY2025-26 NGER register is not yet published, so the reviewed year's figures cannot be reconciled against the statutory return; the FY2024-25 register is carried as prior-period context in the working layer only.
2. Verdict
2.1 Decision-usefulness by audience
2Carbon / supply-chain emissions accounting3 met · 0 partial · 1 not met
The inventory is liftable. All fifteen Scope 3 categories are quantified or carry a stated basis for being not relevant, the dominant source (customer steelmaking, 268.64 MtCO₂e) is quantified with its method and its regional segmentation, Scope 1 is split between the consolidated accounting group and other investees, and Scope 1 and Scope 2 carry reasonable assurance with Scope 3 at limited assurance. The categories sum to the published total. One thing holds the rating down: the market-based Scope 2 figure of 0.53 MtCO₂e, which is 36% higher than the location-based 0.39 MtCO₂e, appears only in the ESG Databook, and no market-based method, factor source or description of the electricity contracts behind it is published in any FY26 document. Separately, the data pack's energy table states its figures in terajoules where the values are petajoules. Estimation method is not the issue here; spend-based factors for Categories 1, 2 and 8 are the expected starting point.§3.1, §4.2, Annex B
1Institutional investors3 met · 1 partial · 2 not met
Neither of the two absolute targets can be priced, because the pathway between today's position and either endpoint is not quantified anywhere. Real Zero is an absolute commitment to eliminate 2.72 MtCO₂e by the end of 2030, and those emissions rose 4.6% in FY26 and 15.7% over two years; the company states they will not begin falling until FY28, and no year-by-year abatement quantity, no interim target and no base period is published. The Scope 3 target covers 275.64 MtCO₂e, is expressly net, and discloses no base period, no interim target in the audited statement, no associated gross target and no carbon-credit architecture, so the permitted netting over 99% of the footprint is unbounded. On achievement, the FY21 steelmaking baseline was restated this year: on the baseline the company published a year ago, FY26 intensity is 2.2% above it; on the restated baseline it is 1.2% below. Physical risk is quantified to a dollar range with its inputs shown, and the customer-steelmaking dependency is quantified by product type and destination region.§3.3, §3.4, §4.2, §5
2Consumer / retail investors2 met · 1 partial · 1 not met
Fortescue tells a retail reader plainly that its emissions rose and why, states each target's boundary in the target's own words, and prints whether each target is gross or net and whether it has been validated. What it does not do is cap the 97% of its footprint that is customer steelmaking before 2040: the only 2030 lever over that category is a 7.5% intensity target, and an intensity target does not limit absolute emissions, which rose 9.1% from FY21 to FY26. Reading the position correctly means setting 2.72 against 275.64 to see that the target carrying the "Real Zero" name covers about 1% of the footprint. The correction is co-located, in the target's own boundary wording and in the transition plan's statement that Scope 3 is about 90 times Scope 1 and 2, which is why this reads as a limitation rather than a defeat.§3.1, §3.4, §4.2
2Consumers & public2 met · 1 partial · 0 not met
The public claims are accurate as written. There is no carbon-neutral claim, no renewable-electricity claim, no "1.5°C aligned" self-label and no assertion that any target has been achieved; each target states its own boundary. The action behind them is real and physical: US$848 million spent in FY26 within a US$6.2 billion program, 550 km of transmission built, three solar farms in construction or commissioning, 370 MWh of battery storage installed, 18 electric excavators and two battery-electric locomotives in service, and a target that eliminates emissions at source rather than buying offsets. The limitation is the composite impression: "Real Zero" is the organising name across the sustainability report, the transition plan and Fortescue's public advocacy, and it attaches to about 1% of the footprint, while the other 99% sits under a net target for 2040 whose netting is not described.§4.1, §4.2, §5
2Regulators0 met · 1 partial · 1 not met
This is a substantial first mandatory filing: an unqualified reasonable assurance opinion on Scope 1 and Scope 2, limited assurance on governance and strategy and separately on Scope 3, Scope 3 disclosed voluntarily rather than deferred, quantified financial effects with their inputs, a disclosed internal carbon price and full scenario disclosure. Five paragraph-level gaps sit against it, four of them in the target disclosures: no base period for the Real Zero and Scope 3 targets, no milestones or interim targets for any of the four voluntary targets, no associated gross target for the net Scope 3 target, no disclosure of the planned use of carbon credits for that net target, and no information about contractual instruments alongside the location-based Scope 2 figure, which is the one gap sitting inside the audited scope. The sources agree with each other on the FY26 figures; the restated FY21 baseline is explained in the data pack alone.§2.3, §5.3, §4.2
What the company should fix first: publish a quantified, year-by-year abatement pathway in MtCO₂e from the current 2.72 MtCO₂e to zero by 2030, and an interim absolute Scope 3 cap for 2030 with the netting the 2040 target permits stated as a quantity.
Every claim is accurate within its stated boundary and no achievement is asserted; the gap is one of proportion, not accuracy, with "Real Zero" naming a target over about 1% of the footprint.
Disclosure quality
9 / 15 overall
Per-category Scope 3 methods with named factor datasets and response rates, quantified financial effects with their inputs, full scenario tables, and four assurance reports printed in the book.
Inventory completeness (Scope 1/2/3)
5/5
All fifteen Scope 3 categories quantified or given a stated not-relevant basis; Scope 1 disaggregated between the consolidated accounting group and other investees; categories sum to the published total.
Financed-emissions completeness (if FI)
N/A
Not a financial institution.
Target credibility
1/5
Neither absolute target carries a base period, an interim milestone or a quantified pathway; the 2040 target over 99% of the footprint is net with no disclosed credit architecture and no associated gross target.
Real reduction vs accounting movement
2/5
The whole FY26 Scope 1 increase is gas for the Iron Bridge ramp-up; the reported steelmaking intensity gain is a consultant's factor update and product mix by the company's own account; the reported position against the steelmaking baseline turns on a restatement made this year.
Offset / certificate / renewable integrity
3/5
Voluntary offsetting ceased, Safeguard units are stated as compliance-only and expressly excluded from Real Zero, and no renewable-electricity claim is made. Against that, the 2040 Scope 3 target is net with the netting undisclosed, and the contracts behind the market-based Scope 2 figure are not described.
Assurance coverage vs claim
4/5
Reasonable assurance on Scope 1 and Scope 2 and limited assurance on Scope 3 and on governance and strategy, all four reports printed with their AASB S2 criteria listed. Scope 3, at 99% of the footprint, sits at the lower level.
Standards / compliance confidence
Potential compliance concern
First mandatory year with a directors' declaration and a clean opinion, against five paragraph-level target and Scope 2 disclosure gaps set out in §2.3.
Comparability (like-for-like only)
N-V
Assessed stand-alone; no peer comparison performed.
Reader accessibility
4/5
Plain risk narrative with dollar ranges, target tables that print gross-or-net and validation status, and the emissions increase stated up front with its causes.
Evidence limitations
Minor
Standalone methodology document not obtained; the reviewed year's NGER return is not yet published.
2.3 Standards & compliance snapshot
Area
Rating
Basis
Corporations Act / Ch 2M
Appears broadly compliant: minor limitations
Climate statements prepared and included in the Annual Report, directors' declaration under sections 296C and 296D signed 20 August 2026, audited and reviewed by PwC.
AASB S2
Potential compliance concern
Governance, strategy, risk management, scenario analysis, financial effects and metrics are all present and substantive, and the first-year comparatives relief is properly disclosed. Five paragraph-level gaps: no base period for two of the four voluntary targets; no milestones or interim targets for any of them; no associated gross target for the net Scope 3 target; no disclosure of planned carbon-credit use for that net target; and no information about contractual instruments alongside the location-based Scope 2 figure.
ASIC RG 280
Not applicable for the period
No separate claim to test beyond the AASB S2 position above.
GHG Protocol / Scope 2 / Scope 3
Appears broadly compliant: minor limitations
Corporate, Scope 2 and Scope 3 standards named and applied per category; the Scope 2 dual-reporting position is published only in the unaudited data pack, and biogenic Scope 1 is considered but not quantified.
PCAF / financed emissions
Not applicable for the period
Not a financial institution.
Carbon-neutral / net-zero framework
Cannot verify: material evidence missing
The 2040 Scope 3 target is expressly net; the extent of reliance on carbon credits, the crediting schemes, the credit types and the permanence assumptions are not disclosed.
Certificates / credits
No apparent issue
Safeguard Mechanism compliance requirement of about 0.3 MtCO₂e stated, units described as acquired and surrendered for compliance only and expressly not used for the Real Zero Target.
Other company-referenced framework
No apparent issue
Transition Plan Taskforce structure and GLEC Framework v3.2 named and applied; the voluntary plan carries an external peer-review foreword, which is not an assurance engagement and is not target validation.
3. What this means for a reader
3.1 What is counted / not counted
Reporting basis: Fortescue Ltd and its consolidated accounting group, operational control, for the year ended 30 June 2026. All figures below are the reviewed year. Materiality shares are taken from the FY26 composition itself. The two Scope 2 rows measure the same electricity on two bases and are never added; only the location-based figure enters a Scope 1 and 2 total.
Emissions composition
Values as reported (tCO₂e). Bars are independent magnitudes, not a stack. Scope 2 is shown on both bases: they measure the same electricity two ways and are alternatives, not additions, so they are never added together.
Source: FY26 Annual Report, Sustainability Report: Climate Statements folio 92 (Scope 1, Scope 2 location-based, Scope 3, FY26); FY26 ESG Databook, Climate (Emissions) sheet (Scope 2 market-based, FY26). The two Scope 2 bases measure the same electricity and are not additive.
Scope 12,750,000
Scope 2 (location-based)390,000
Scope 2 (market-based)the same electricity on the other basis, not an addition530,000
Scope 3275,640,000
Scope 3 by category (largest first)
Source: FY26 Annual Report, Notes to the Sustainability Report: Climate Statements, Note 5, folios 100 to 102 (Scope 3 by category, FY26); cross-checked to the FY26 ESG Databook, Climate (Emissions) sheet.
C10 Processing of sold products268,640,000
C4 Upstream transport & distribution3,330,000
C1 Purchased goods & services2,270,000
C3 Fuel- & energy-related640,000
C9 Downstream transport & distribution400,000
C7 Employee commuting110,000
C2 Capital goods110,000
C8 Upstream leased assets90,000
C6 Business travel30,000
C5 Waste20,000
C13 Downstream leased assets3,000
What is counted
Every scope and Scope 3 category, coloured by inclusion status. Values as reported. A tile shown in brackets is counted but not additive: it either sits inside another line's total, or it is the same emissions measured on the other Scope 2 basis. The values shown do not add up to the reported total.
Scope 3 C4 Upstream transport & distribution3,330,000Reported
Scope 3 C5 Waste20,000Reported
Scope 3 C6 Business travel30,000Reported
Scope 3 C7 Employee commuting110,000Reported
Scope 3 C8 Upstream leased assets90,000Reported
Scope 3 C9 Downstream transport & distribution400,000Reported
Scope 3 C10 Processing of sold products268,640,000Reported
Scope 3 C11 Use of sold productsNot relevant
Scope 3 C12 End-of-life of sold productsNot relevant
Scope 3 C13 Downstream leased assets3,000Reported
Scope 3 C14 FranchisesNot relevant
Scope 3 C15 InvestmentsNot relevant
Biogenic Scope 1 (land clearing)Named, not quantified
Reported / counted Counted, but not additive: inside another line, or the same emissions on the other Scope 2 basis Not counted (excluded or unquantified) Not relevant or not applicable
Scope / category
Status
Quantified (tCO₂e)
Material?
Note
Scope 1: combustion / fugitive / fleet
Reported
2,750,000
Yes: 1.0% of the footprint
Diesel, natural gas at Solomon Power Station and owned very large ore carriers; 2,690,000 consolidated accounting group and 50,000 other investees. Reasonable assurance.
Scope 2: electricity (location-based)
Reported
390,000
Yes: 0.1%
Invoice data, under 1% estimated on NABERS benchmarks. Reasonable assurance. Not additive with the row below.
Scope 2: electricity (market-based)
Reported
530,000
Not applicable: same electricity, market-based measure
Published in the ESG Databook only; absent from the Annual Report, the transition plan and the sustainability report. No method, factor source or contractual-instrument description is published. 36% higher than location-based; the cause of the gap is not disclosed.
Scope 3 C1 Purchased goods & services
Reported
2,270,000
Yes: 0.8%
Spend-based, Climatiq datasets (EXIOBASE and CEDA), inflation-adjusted on US CPI.
Scope 3 C2 Capital goods
Reported
110,000
No: minor
Same spend-based method.
Scope 3 C3 Fuel- & energy-related
Reported
640,000
No: minor
National Greenhouse Accounts upstream factors; well-to-tank for owned vessels via GLEC v3.2.
Scope 3 C4 Upstream transport & distribution
Reported
3,330,000
Yes: 1.2%
Cost-and-freight shipping; fuel-based method, over 95% response rate; 9% of the category is spend-based.
Scope 3 C5 Waste
Reported
20,000
No: minor
Waste-type specific method.
Scope 3 C6 Business travel
Reported
30,000
No: minor
Distance-based from travel providers.
Scope 3 C7 Employee commuting
Reported
110,000
No: minor
Includes fly-in fly-out charter and commercial flights and working from home.
Scope 3 C8 Upstream leased assets
Reported
90,000
No: minor
Spend-based.
Scope 3 C9 Downstream transport & distribution
Reported
400,000
No: minor
Free-on-board shipping arranged by customers; laden and ballast legs both included, which the company notes may overstate by under 1%.
Scope 3 C10 Processing of sold products
Reported
268,640,000
Yes: 96.4% of the footprint
Customer steelmaking. Average-data method on CRU regional emission factors by product type and destination. Limited assurance.
Scope 3 C11 Use of sold products
Not relevant
Not applicable
No
Stated basis: Fortescue sold only intermediate products in FY26.
Stated basis: assessed immaterial in FY26. Equity-accounted investee operational emissions are separately bounded at 60,000 t across Scope 1 and Scope 2.
Biogenic Scope 1 (land clearing)
Partial
Not disclosed
Cannot verify
Expressly considered; no quantitative figure reported while the applicability of the Land Sector and Removals Standard is assessed.
Total footprint on the reviewed year: 278.77 MtCO₂e (Scope 1 and 2 location-based 3.13 Mt, Scope 3 275.64 Mt).
Activity: natural gas at Solomon Power Station rose 8.42 → 10.87 PJ for the Iron Bridge ramp-up, which adds about 0.126 Mt at the national measurement factors; diesel fell 680.75 → 674.29 million litres, which removes about 0.018 Mt. The two reconcile to the reported +0.11 Mt.
Increase: the whole of the increase is gas, and it is fossil-fuel switching in the wrong direction; the small diesel fall is the only movement running the other way.
Scope 2 location-based rose 0.38 → 0.39 MtCO₂e (+2.6%)
Activity: purchased electricity rose 791.86 → 800.19 GWh on a broadly unchanged grid factor.
Increase: volume growth.
Scope 2 market-based rose 0.52 → 0.53 MtCO₂e
Cannot verify: not derivable. No market-based method or factor source is published, and renewable electricity purchased fell 145.15 → 137.01 GWh while total purchases rose.
Cannot verify: the method behind the figure is not disclosed.
Scope 1 and 2 covered by the Real Zero Target rose 2.60 → 2.72 MtCO₂e (+4.6%), and 2.35 → 2.72 Mt (+15.7%) over two years
Activity: ore shipped up 1.5%, gas consumption for the Iron Bridge ramp-up, and higher total material movement, all three stated by the company.
Increase: the company states the covered emissions will not begin falling until FY28.
Mixed: the company attributes it to three things: CRU updating the emission factors applied to Fortescue's product to reflect steel-mill improvements; a higher share of Iron Bridge concentrate and lump in the sales mix; partly offset by more low-grade fines.
Partly: mostly not Fortescue's own action. The first driver is a consultant's revision of a third-party factor, the second is product mix, and neither is abatement Fortescue delivered.
Steelmaking intensity reported 1.2% below the FY21 baseline
Method or factor: the FY21 baseline was restated this year from 1.31 to 1.35 MtCO₂e/Mt. Against the baseline published a year earlier, FY26 sits 2.2% above it.
No: the reported direction of travel against the baseline turns on the restatement, not on the metric.
Shipping intensity reported 15% below the FY21 baseline
Mixed: lower-emission vessel chartering, eco steaming, voyage optimisation and energy-saving devices, against a baseline calculated on voyage distance where the current years use fuel consumption.
Partly: partly real, and the company discloses that the baseline is not calculated on the same activity basis, so the size of the real component cannot be separated.
Mixed: Category 10 fell 0.56 Mt on the factor and mix effects above while Category 4 rose 0.26 Mt on shipping volume.
No: movement within the noise on a rising shipment base.
Total energy consumption rose 42.89 → 45.27 PJ (+5.5%)
Activity: gas and diesel volume growth; self-generated renewable electricity rose 0.65 → 0.85 PJ (180 → 236 GWh).
Increase: renewable self-generation is real and growing, and it is 1.9% of energy consumed.
3.4 Trajectory over time
Across FY2021 to FY2026 Fortescue's absolute footprint has grown in every scope while the framing points to elimination. Scope 1 rose 2.40 → 2.75 MtCO₂e, up 14.6%, and did so unevenly: it fell to FY23 before climbing on the Iron Bridge ramp-up, and the last three years are a straight rise. Location-based Scope 2 rose 0.16 → 0.39 Mt, up 144%. Customer steelmaking rose 242.83 → 268.64 Mt, up 10.6%, and total Scope 3 247.06 → 275.64 Mt, up 11.6%. The direction of travel is volume growth, not abatement; the only line moving the right way is self-generated renewable electricity, which went from nothing before FY25 to 236 GWh. Two things changed in the reporting itself this year and both matter. The FY21 steelmaking baseline was restated upward, which is what turns a metric sitting above its baseline into one reported below it, and the restatement is explained in the data pack alone while the Annual Report and the transition plan print the new number without comment. And the audited statement shows a single year, because the first-year relief from comparatives was properly taken; the FY25 figures are in the voluntary transition plan instead, so a reader who stops at the audited book cannot see the trend at all. Three FY25 gaps closed: every Scope 3 category now carries a stated basis, the "1.5°C aligned" self-label is gone, and no target is described as validated.
Metrics over time
Trajectory over time
Reported operational emissions by scope, stacked, in tCO₂e per reporting year.
Source: Scope 1 and Scope 2 location-based only, Group basis. Scope 3 is about 88 times larger and is charted separately in the composition view; it is excluded here because a stacked series would render the operational trend invisible. Sources: FY22 ESG Databook Planet sheet; FY23 Climate Change Report comparative table; FY25 ESG Databook Climate (Emissions); FY26 Annual Report folio 92.
Scope 1
Scope 2 (location-based)
Metric
FY2021
FY2023
FY2025
FY2026
Movement
Driver
Note
Scope 1 (MtCO₂e)
2.40
2.20
2.64
2.75
Mixed: fell to FY2023, then rose; +14.6% over the series
Activity: volume and fuel switching to gas
FY2022 2.21, FY2024 2.36
Scope 2 location-based (MtCO₂e)
0.16
0.35
0.38
0.39
Up: 144% since FY2021
Activity: grid electricity volume
FY2022 0.33, FY2024 0.37
Scope 2 market-based (MtCO₂e)
Not disclosed
0.54
0.52
0.53
Flat: broadly flat, and above location-based throughout
Cannot verify: no method published
Data pack only in every year. Measures the same electricity as the row above; the two are not additive (see F-11)
Scope 3 total (MtCO₂e)
247.06
267.61
275.94
275.64
Up: 11.6% since FY2021
Activity: shipment volume
FY2025 restated from 275.88 on a Category 3 correction
Emissions intensity (Group Scope 1 and 2 location-based, tCO₂e/wmt of ore shipped)
Not disclosed
Not disclosed
0.015
Not disclosed
Dropped: published for FY2025, not in the FY2026 suite
Not applicable
FY2025 Annual Report (0.014 → 0.015, +7.1%). The FY2026 Databook's GRI index points "GHG emissions intensity" to the Climate Statements and the Climate Transition Plan; both carry only the steelmaking and shipping intensities. The FY2026 suite publishes the steelmaking and shipping intensities (rows below) and an energy intensity
Renewable electricity (% of consumption)
Not disclosed
Not disclosed
Not disclosed
Not disclosed
Not disclosed
Not applicable
No percentage is published. Renewable share of purchased electricity 18.3% → 17.1% (FY2025 to FY2026) on the data pack's GWh figures; see the purchased-renewable row below
Certificates and offsets retired (MtCO₂e)
0.20
0.34
0
0
Mixed: rose to FY2023, nil since voluntary offsetting ceased in 2023
Not applicable
Voluntary offsets. FY2025 and FY2026 compliance only: about 0.3 Mt of Safeguard units in FY2026, expressly excluded from the Real Zero Target and not counted here
Customer steelmaking, Category 10 (MtCO₂e)
242.83
261.46
269.20
268.64
Up: 10.6% since FY2021
Activity: shipment volume
96.4% of the footprint (see F-9)
Steelmaking intensity (MtCO₂e/Mt)
1.35
1.361
1.357
1.334
Mixed: falling within the current series; above or below the FY2021 baseline depending on which baseline
Mixed: factor update and product mix
FY2021 as restated in FY2026; 1.31 as published to FY2025 (see F-8)
Shipping intensity (MtCO₂e/Mt)
0.022
0.016
0.019
0.019
Not comparable: FY2021 baseline on a different activity basis; flat for three years against a 50% reduction target for 2030
Mixed: chartering policy and eco steaming, on a baseline computed on a different activity basis
Baseline ore-shipped figure also restated
Renewable electricity purchased (GWh)
0.7
131.01
145.15
137.01
Not comparable: FY2021 not on a comparable basis; rose FY2023 to FY2025, then fell in FY2026 while total purchases rose
Certificates: contractual
Share of purchased electricity 18.3% → 17.1%. FY2023 is the corrected figure in the FY24 ESG Databook (145.7 as first published in the FY23 Climate Change Report)
Targets and claims over time
Target or claim
As first stated (period)
As stated for FY2026
Change
Explained?
Note
Real Zero Target (Scope 1 and 2, Australian terrestrial iron ore, by the end of 2030)
Net Scope 1 and 2 to zero by 2030 (FY2021)
Real Zero from 2022, Australian terrestrial iron ore, gross; retained unchanged in FY2026
Strengthened; Rebased: net reframed as gross, base 2022; unchanged this year
Partly: the reframing is described; no base period is disclosed
Covered emissions rose 2.60 → 2.72 MtCO₂e (+4.6%), and the company states they will not begin falling until FY28 (see F-6, F-14)
Net zero Scope 3 by 2040
Net zero Scope 3 by 2040 (FY2021)
Retained; recorded as a net target over 275.64 MtCO₂e, with no associated gross target
Unchanged
Not applicable
See F-7
Steelmaking intensity target (7.5% by 2030 against FY21)
7.5% reduction in steelmaking emissions intensity by 2030 against FY21 (FY2023; earliest source checked)
Partly: the fact of the correction is in the data pack only, with no components
Reported progress reverses sign on the restatement (see F-8, F-19)
Shipping intensity target (50% by 2030 against FY21)
50% by 2030 against FY21 (first-stated period not recorded in this review)
Retained; baseline ore-shipped figure also restated
Rebased: baseline restated
Cannot verify
Flat at 0.019 for three years
Carbon-neutral and net-zero claims
Net operational target (FY2021)
No neutrality claim; no renewable-electricity claim; no "1.5°C aligned" self-label
Withdrawn: claim set narrowed and made more accurate
Cannot verify
An improvement against the company's own prior disclosure. No target weakened, retired or re-dated this year
SBTi validation
Validation sought (FY2021)
Validation stated as paused while the initiative reviews its standards; "Target validation by a third party: No" in every target table
Weakened: validation paused
Yes: the pause and the absence of validation are stated
The SBTi position is stated accurately
4. Findings
4.1 What stands up (genuine / qualified positives)
▲F-1
The Real Zero Target eliminates emissions at source rather than neutralising them: it is absolute and gross, voluntary offsetting ceased in 2023, and Safeguard Mechanism units are stated to be acquired and surrendered for legal compliance only and expressly not used to meet the target.
Why it matters A gross elimination target cannot be met by buying anything. It commits capital to physical change, and it removes the reader's usual problem of telling abatement from purchased neutralisation.
Qualification (if any) It governs 2.72 MtCO₂e, about 1% of the footprint. The target covering the other 99% is expressly net, and the netting it permits is not quantified.
▲F-2
The decarbonisation program is deployed capital, not intention: US$848 million spent in FY26 within a US$6.2 billion commitment, with a further US$680 million approved during the year, against 550 km of transmission built, a 190 MW solar farm approaching commissioning and two more in construction, 370 MWh of battery storage installed, 18 electric excavators and two battery-electric locomotives in service.
Why it matters Physical assets in the ground are the one form of evidence a reader cannot restate. The FY27 and FY31 milestones are stated as equipment counts and commissioning dates, which are checkable next year.
Qualification (if any) The emissions the program targets rose 4.6% in the year and are stated not to fall until FY28, and no quantity of abatement is attached to any milestone.
▲F-3
The physical-risk assessment is quantified to a financial effect with its inputs shown: about seven additional days of average annual effective downtime by 2050 under the high-emissions pathway, converted at a stated 0.55 Mt daily shipment rate and a US$91 per dry metric tonne realised price to a US$100 million to US$500 million range, with the scenarios, the downscaling approach and the treatment of low-probability events all disclosed.
Why it matters An investor can re-run the arithmetic and substitute their own price and volume assumptions. Most physical-risk disclosure cannot be interrogated at all.
Qualification (if any) The assessment covers the Pilbara iron ore value chain only, and chronic hazards are stated as not yet incorporated.
▲F-4
Every Scope 3 category is either quantified or given a stated reason for being not relevant, and the dominant one is modelled at the level of product type and destination region by an independent consultancy whose method is described.
Why it matters A supply-chain accountant can lift the figures and see exactly what sits behind the number that matters. The customer dependency is the hardest thing for a miner to quantify, and it is the best-quantified part of this disclosure.
Qualification (if any) Category 10 carries limited rather than reasonable assurance, and the estimate depends on a third party's factors, which is also what drove this year's reported intensity movement.
▲F-5
Scope 3 was disclosed in full in the first mandatory year, when the standard permitted it to be omitted entirely, and the transition plan states that Scope 3 is about 90 times Scope 1 and 2.
Why it matters Deferring Scope 3 was available and would have removed 99% of the footprint from the audited book. Publishing it, and publishing the ratio, is what makes the rest of this report possible for a reader.
Qualification (if any) The disclosure is complete; the targets over it are not, which is the subject of the findings below.
4.2 What does not stand up (negatives)
▼F-6
There is no quantified pathway from 2.72 MtCO₂e to zero. The Real Zero Target is absolute and four years from its date; the covered emissions rose 4.6% this year and 15.7% over two years; the company states they will not begin falling until FY28; and no year-by-year abatement quantity, no interim target and no base period is published in any document. The transition plan states that emissions will fall "as complete systems are commissioned and deployed, rather than at a uniform rate each year", and its last mobile-equipment milestone is FY31, which a reader cannot place inside or outside a target period stated as "the end of 2030".
Why it matters to a reader An absolute target with a rising base, no interim point and no abatement quantities cannot be tested by anyone until the year it falls due. A reader is asked to take the endpoint on trust.
What would fix it A pathway in MtCO₂e by year to 2030, with the abatement attributed to each lever, a base period, and a statement of whether "the end of 2030" means the calendar year or FY2030.
▼F-7
The target covering 99% of the footprint is net, and the netting is not described. Net zero Scope 3 by 2040 applies to 275.64 MtCO₂e and is recorded as a net target. No associated gross target is disclosed, no base period, no interim target in the audited statement, and nothing about the extent of reliance on carbon credits, which crediting schemes would verify them, what type of credit, or the permanence assumed. The Safeguard Mechanism disclosure states units are not used for the Real Zero Target and is silent on this one.
Why it matters to a reader Between a gross target and a net target with unlimited netting there is a difference of up to 275 million tonnes. A reader cannot tell which of those Fortescue has committed to.
What would fix it Publish the associated gross Scope 3 target, the base period, an interim 2030 absolute cap, and the planned scale, type and verification of any credits.
▼F-8
The reported position against the Steelmaking Target reverses on a baseline restated this year. The FY21 baseline moved from 185.9 to 182.18 Mt of ore shipped and from 242.83 to 246.14 MtCO₂e, lifting baseline intensity from 1.31 to 1.35 MtCO₂e/Mt. FY26's 1.334 is 2.2% above the baseline the company published a year ago and 1.2% below the restated one, and the 2030 endpoint moves from about 1.21 to about 1.25, roughly 8 MtCO₂e of allowed customer emissions at current volumes. The change is explained in the ESG Databook as correcting a carried-forward system error; the audited statement and the transition plan print the new baseline without comment, and no before-and-after values are published anywhere.
Why it matters to a reader Progress against the only 2030 lever over 96% of the footprint changes sign depending on which baseline is used, and a reader cannot see that unless they still hold last year's data pack.
What would fix it Publish the baseline as previously stated beside the corrected figure, the size of the correction, its two components, and the effect on the 2030 endpoint.
▼F-9
The 7.5% steelmaking intensity target does not cap absolute emissions, which rose 10.6% over the series. Category 10 went from 242.83 MtCO₂e in FY21 to 268.64 MtCO₂e in FY26 while the intensity metric moved by about one per cent, because shipments rose. The transition plan presents the intensity target as an interim milestone toward net zero Scope 3 by 2040; an intensity milestone does not constrain the absolute quantity the 2040 target must eliminate.
Why it matters to a reader A reader can take a 2030 intensity milestone as evidence that the 2040 absolute target is on a pathway. On these figures the absolute quantity to be eliminated has grown every year since the baseline.
What would fix it State the absolute Category 10 trend beside the intensity target, and set an absolute interim cap.
▼F-10
This year's reported intensity improvement is not Fortescue's abatement, on the company's own account. The 1.67% fall is attributed to CRU revising the emission factors applied to Fortescue's product, and to a higher share of Iron Bridge concentrate and lump in the sales mix, partly offset by more low-grade fines. Neither driver is action Fortescue took to reduce its customers' emissions.
Why it matters to a reader The one number moving toward the 2030 steelmaking target is a third party's factor revision and a sales mix. Read as progress, it overstates what has been achieved.
What would fix it Separate the factor-revision effect, the mix effect and any Fortescue-delivered abatement, and report the three quantities.
▼F-11
The market-based Scope 2 position is 36% worse than the location-based one, and it is published in one unaudited source with no method. The ESG Databook reports 0.53 MtCO₂e market-based against 0.39 MtCO₂e location-based. Neither the figure nor any description of the electricity contracts behind it appears in the Annual Report, the transition plan or the sustainability report, and the audited statement's Scope 2 note describes the location-based method only, while renewable electricity purchased fell from 145.15 to 137.01 GWh.
Why it matters to a reader Market-based is the basis on which a company's electricity contracting is judged, and here it is the less favourable one. A reader of the audited book does not learn it exists.
What would fix it Disclose the market-based figure and its method in the climate statement, with the contractual instruments held, the residual-mix factor used and the cause of the gap.
▼F-12
The executive scorecard's decarbonisation block paid above weight in a year emissions rose, and none of its three measures is an emissions outcome. The block carries 15 points of the short-term scorecard and returned 17.5: schedule and budget delivery (10 of 10), advancing pathways to profitably decarbonise 1.9% of remaining hard-to-abate emissions against a 1% target (3.75 of 2.5), and US$491 million of capital cost reduction on renewable power and mobile equipment against a US$350 million target (3.75 of 2.5). Scope 1 and 2 covered by the Real Zero Target rose 4.6% over the same period.
Why it matters to a reader Where pay is linked to climate, a reader reasonably reads an above-weight outcome as emissions progress. Here the measures reward delivery, procurement and cost, and can be exceeded while the emissions they exist to reduce increase.
What would fix it Add at least one measure struck on the reported emissions outturn, on the same boundary as the Real Zero Target.
▼F-13
The asset carrying this year's product-mix improvement was impaired US$750 million on a revised ramp-up, and the climate statement does not connect the two. Iron Bridge is named in the climate statement as a driver of the Scope 1 increase and, through higher concentrate sales, of the steelmaking intensity fall. The financial statements record a US$750 million pre-tax impairment on the Iron Bridge cash-generating unit reflecting a revised ramp-up schedule and a range of production scenarios.
Why it matters to a reader The product-mix lever behind the steelmaking target and the asset whose production outlook was written down are the same asset, and a reader assessing that target would want the two facts side by side.
What would fix it Connect the revised Iron Bridge ramp-up to the product-mix assumption in the Steelmaking Target, and state the effect on the 2030 endpoint.
▼F-14
Four target disclosures required in the first mandatory year are absent. No base period is disclosed for the Real Zero Target or the Scope 3 Target, though both are absolute targets measured from somewhere; no milestones or interim targets are disclosed for any of the four voluntary targets in the audited statement; no associated gross target accompanies the net Scope 3 target; and no planned use of carbon credits is disclosed for it. The first-year relief taken covers comparative information only and does not reach these.
Why it matters to a reader These are the disclosures that let a reader test a target rather than accept it. Their absence is why F-6 and F-7 cannot be resolved from the book.
What would fix it Add the base period, the milestones and interim targets, the associated gross target and the carbon-credit disclosures to the target tables.
▼F-15
The data pack's energy table states terajoules where the values are petajoules. Total energy consumption reads 45.27 TJ where the figure is 45.27 PJ, diesel 26.03 TJ where the company reported 26,277,016 GJ for the prior year on the same row, and 800.19 GWh of purchased electricity is stated as 2.88 TJ where it is 2,881 TJ. Every row of the table and its two comparative years is understated by a factor of a thousand by its stated unit.
Why it matters to a reader Anyone lifting Fortescue's energy figures takes a number a thousand times too small. The values themselves are right; the unit label is not.
What would fix it Correct the column heading to petajoules, or restate the values in terajoules.
4.3 What cannot be verified
?F-16
The cause and composition of the 0.14 MtCO₂e gap between market-based and location-based Scope 2
Why it is open No market-based method, residual-mix factor or contractual-instrument description exists in any FY26 document
What would resolve it The Scope 2 market-based method note, the certificates or contracts held with volumes, and the residual-mix factor applied
?F-17
Biogenic Scope 1 emissions from land clearing
Why it is open Expressly considered, with no quantitative figure reported while the applicability of the Land Sector and Removals Standard is assessed
What would resolve it A quantified estimate, or a bounding figure with the basis for it
?F-18
The reviewed year's statutory position against the NGER return
Why it is open The FY2025-26 register is not published at the review date
What would resolve it The FY2025-26 register, expected in early 2027
?F-19
The split of the FY21 steelmaking baseline restatement between the ore-shipped correction and the emissions correction
Why it is open The data pack states the fact of the correction and no components
What would resolve it The baseline as previously stated, the corrected figure and the reconciliation between them
?F-20
Emission factors, the base-year recalculation policy and the restatement threshold
Why it is open The standalone FY26 Emissions Calculation Methodology was not obtained for this review
What would resolve it The published methodology document
?F-21
Whether the FY31 mobile-equipment milestone falls inside the Real Zero target period
Why it is open The target is dated "the end of 2030" without stating calendar or financial year, and the milestones are on a financial-year axis
What would resolve it A statement of which year-end the target date refers to
5. Disclosure risk exposure
5.1 Risk read
On the evidence in this review, Fortescue's disclosure most exposes the company, and a reader relying on it, at the point where an absolute commitment meets an unquantified path to it. Two absolute targets carry the disclosure: eliminate 2.72 MtCO₂e by the end of 2030, and reach net zero across 275.64 MtCO₂e by 2040. Neither publishes a base period, an interim target or a quantity of abatement by year, and the emissions under the nearer of the two rose 15.7% in two years against a date four years away, with the company stating they will not begin to fall until FY28. The single biggest driver is that gap between the firmness of the commitment and the absence of anything a reader can measure it against between now and the date. A second driver is that the 2040 target is expressly net with no disclosure of the credits it may rely on, so the difference between a gross commitment and an offset one is left open over 99% of the footprint. A third is narrower and more mechanical: the reported position against the 2030 steelmaking target reverses depending on which baseline is used, and the restatement that produces the favourable reading is explained only in an unaudited data pack. None of the following is an allegation of misconduct, greenwashing or breach; each is a risk a reasonable reader, regulator or director should be able to see and price.
5.2 Risk by lens
Risk exposure by lens
Relative exposure across disclosure-risk lenses; see the table for what drives each and what would reduce it.
Source: Review analysis of the FY26 disclosure suite.
"Real Zero" is a coined term whose plain meaning is elimination, used as the organising name for a program covering about 1% of the footprint, while the 2040 target over the remainder is net with the netting undisclosed. The boundary is co-located at every substantive mention, which is what holds this at moderate rather than higher.
State the proportion of the footprint each target covers wherever the target is named, and quantify the netting the 2040 target permits.
Five paragraph-level AASB S2 gaps in the first mandatory year, four on target disclosure and one on contractual instruments inside the audited scope, in a filing carrying a directors' declaration of compliance.
Close the five gaps in the FY27 statement and, where practical, by supplementary disclosure before then.
Technology (dependence on unproven abatement)
Elevated
High
Real Zero depends on battery-electric haulage at fleet scale, rail electrification still at engineering-validation stage, and an integrated off-grid renewable system, all against a 2030 date, with the plan itself stating the first-mover cost and sequencing risk and placing full mobile-equipment deployment at FY31.
Publish the abatement quantity attached to each lever and the fallback if a lever slips, so a reader can size the exposure rather than infer it.
Physical (physical-risk disclosure consistency)
Low
High
The assessment is quantified, its inputs are disclosed, its scope limitation to the Pilbara value chain is stated, and the FY26 outturn is reported as no material impact. Chronic hazards are stated as not yet incorporated.
Extend the quantification to chronic hazards as the data allows.
Other: remuneration
Moderate
High
Climate-linked measures carry 32.5% of the chief executives' short-term scorecard, and the decarbonisation block within it paid 17.5 against a weight of 15 in a year the covered emissions rose 4.6%, on measures none of which is an emissions outturn.
Add an emissions-outcome measure on the Real Zero boundary.
5.3 Consistency across audiences
Claim / metric
To the regulator
To investors / public
Consistent after normalising boundary?
Scope 1, Scope 2 location-based, Scope 3 FY26
Audited climate statement in the Annual Report; reasonable assurance on Scope 1 and 2, limited on Scope 3
Identical figures in the transition plan, the sustainability report and the data pack
Yes
Scope 2 market-based
Not disclosed
ESG Databook only, and only as a bare figure
Not testable: one source only. The audited statement carries no contractual-instrument information alongside the location-based figure
FY25 comparatives
Omitted from the audited statement under the first-year relief, with the relief disclosed
Published in the voluntary transition plan
Yes: the relief is properly disclosed; a reader of the audited book alone sees one year
FY21 steelmaking baseline
New figure printed in the audited target table with no note of the change
New figure printed in the transition plan with no note; the change is explained only in the data pack
Yes: the figures agree; the explanation reaches only one of the three audiences
Categories 11, 12, 14 and 15
"—" with a stated not-relevant basis in the audited statement
"0" in the data pack
Yes: after normalising; both mean not counted, and the audited statement states the basis
Statutory NGER return
FY2025-26 register not yet published
Not applicable
Cannot verify: for the reviewed year
6. How to fix it
6.1 NoCO2 Standard alignment
Finding
Review finding (why it matters)
NoCO2 mechanism
Document / clause
Required evidence
Likely NoCO2 outcome
D6-1 no quantified pathway to Real Zero
An absolute 2030 target with a rising base and no interim point cannot be tested until it falls due
Reduction trajectory with mandatory interim points
4.7.2 Reduction Trajectory; 4.7.4 Interim Targets
Year-by-year abatement quantities in MtCO₂e by lever to 2030, with the base period stated
Non-conformance until the trajectory is published
D6-1 no base period for the Real Zero and Scope 3 targets
Progress cannot be measured from an unstated origin
Base year and recalculation policy
4.7.6 Base Year and Recalculation
Declared base period for each target and a recalculation policy
Non-conformance
D5-2 the 2040 Scope 3 target is net with the netting undisclosed
Up to 275 MtCO₂e of difference between a gross and an unlimited-netting commitment
Already evidenced by the target definition and the credits paragraph
Conformant on the covered boundary
D4-4 absolute Category 10 rose while the 2030 lever is intensity-only
An intensity milestone does not constrain the quantity the 2040 target must eliminate
Absolute cap requirement over material value-chain categories
4.7.2 Reduction Trajectory; 4.5.5.8 Value Chain Emissions (downstream processing)
An absolute interim cap for 2030 over Category 10
Non-conformance
D4-2 customer steelmaking quantified but not controlled
The dependency is real and Fortescue does not operate the emitting assets
Influenced and non-attributable emissions treatment
4.5.6 Non-Attributable and Influenced Emissions
Documented influence pathway, engagement evidence and the measured trajectory it is expected to move
Conformant on quantification; the influence treatment is what would give the 2040 target a mechanism
D3-1 market-based Scope 2 published without method
The less favourable basis is the one a reader of the audited book never sees
Market-based reporting with certificate evidence
4.6.3 Market-Based Reporting; 4.6.5 Certificate Evidence and Retirement
Method note, contractual instruments held with volumes, residual-mix factor, retirement records
Non-conformance until the method and evidence are published
D2-3 biogenic Scope 1 unquantified
Small residual uncertainty in an otherwise complete Scope 1
Inventory completeness across all emission types
4.5.2 Organisational Boundary; 4.5.5 Value Chain Emissions
A quantified or bounding land-clearing estimate
Minor gap; resolvable
D4-3 Categories 1, 2 and 8 spend-based
Estimation is the expected starting point, not a fault
Data quality hierarchy and supplier-specific factors
4.5.4 Data Quality Hierarchy; 4.5.7 Supplier-Specific Emission Factors
A data-quality grade by category and a supplier-engagement plan
Conformant; improvement pathway only
D6-2 FY21 steelmaking baseline restated with the explanation in one source
Progress against the only 2030 lever over 96% of the footprint changes sign on the restatement
Recalculation disclosure with before-and-after values
4.7.6 Base Year and Recalculation; 4.9.3 Restatement Disclosure
Prior baseline, corrected baseline, components of the change, effect on the target endpoint
Non-conformance on disclosure completeness
D6-3 this year's intensity movement is factor and mix driven
The one number moving toward the target is a third party's revision
Attribution of movement against a business-as-usual counterfactual
4.7.3 Progress Attribution
Factor, mix and own-action components stated separately
Non-conformance until decomposed
D7-3 decarbonisation pay block paid above weight while emissions rose
A reader reads a strong climate scorecard outcome as emissions progress
Governance linkage between incentives and measured outcomes
4.4.4 Incentive Alignment
At least one measure struck on the reported emissions outturn on the target boundary
Non-conformance on incentive alignment
D7-4 Iron Bridge connectivity gap
The mix lever behind the target and the impaired asset are the same asset
Connected disclosure of financial and emissions effects
4.9.5 Connected Information
The climate sensitivity applied in the impairment model and the effect on the mix assumption
Minor gap
D2-4 data-pack energy unit label
Energy figures are understated a thousandfold by their stated unit
Reporting accuracy and unit integrity
4.9.1 Reporting Accuracy
Corrected unit heading or restated values
Minor gap; mechanical
D9-1 physical-risk assessment quantified and transparent
An investor can re-run the arithmetic
Physical risk assessment and adaptation planning
4.3.4 Physical Risk Assessment
Already evidenced
Conformant
D1-2 Scope 3 disclosed voluntarily in the first mandatory year
99% of the footprint is in the audited book when it could have been deferred
Value chain completeness
4.5.5 Value Chain Emissions
Already evidenced
Conformant
D8-2 no climate-adjusted reserve or life-of-mine sensitivity
Transition exposure to carrying values is not sizeable by a reader
Asset resilience and transition sensitivity
4.3.5 Transition Risk Assessment
The climate sensitivity applied in impairment and life-of-mine models
Minor gap
7. Conclusion & next steps
Fortescue's first mandatory climate statement is a substantial piece of work, and the inventory behind it is close to complete: Scope 3 was published in full when it could have been deferred, every category carries a stated method or a stated reason, Scope 1 and Scope 2 carry reasonable assurance, and the physical-risk analysis is quantified in a way a reader can re-run. The capital behind the commitment is real and in the ground. What does not hold up is the space between the commitment and the date. Two absolute targets, one four years away over about 1% of the footprint and one fourteen years away over the other 99%, publish no base period, no interim target and no quantity of abatement by year, and the emissions under the nearer one rose 15.7% in two years. The further target is net, and how much of it may be met by credits is not stated at all.
The single most valuable fix is a pathway in tonnes: a year-by-year abatement quantity from 2.72 MtCO₂e to zero by 2030, attributed lever by lever, and an interim absolute cap for 2030 over customer steelmaking with the residual the 2040 target permits stated as a number. Everything else follows from it. Alongside that, publish the FY21 steelmaking baseline as previously stated beside the corrected one so progress can be read on a single basis; bring the market-based Scope 2 figure and the contracts behind it into the audited statement; and add the base periods, milestones, associated gross target and carbon-credit disclosures that the standard requires. CRI's Decarbonisation Strategies, Mandatory Climate Reporting, Carbon Inventories and Supplier-Specific Emissions Factors services, and the NoCO2 Net Zero pathway, map directly onto that work.
Important information
This diagnosis is general information, published to support transparency, accountability and public debate on corporate climate disclosure. It sets out CRI's assessment of the publicly available climate disclosures of the organisation named above, for the reporting period stated, based on third-party information available at the review date. The assessment is made against CRI's Climate Disclosure Review Rules (version stated above), which use the CRI Net Zero Standard as the reference for a credible claim together with AASB S2 Climate-related Disclosures, and it gives reasons for each finding.
It assesses the disclosure, not the organisation's underlying climate performance or intent, and it does not allege illegality, misconduct, greenwashing or dishonesty. It is not tailored advice, nor legal, financial or investment advice, and it is not an audit, an assurance engagement or a certification. CRI does not accept liability for any error or omission in this analysis, or for any loss arising from use of or reliance on it.
AI tools help locate, extract and organise material from the source documents against a fixed rule set. Every rating and conclusion is reviewed and confirmed by CRI analysts; the rules, not the model, determine the outcome.
Organisations may contact CRI at robc@noco2.com.au to identify an error, provide relevant public information or request review of updated disclosures. Where a correction affects a finding, the diagnosis is updated and the change is noted. Further information about the review method is at noco2.com.au.
These annexes are the detailed working layer behind the findings in the body: the evidence base, rule application and traceability. Much of it is review working, retained for transparency and of interest to both the internal review team and external readers who want to see how each finding was reached.
Primary audited source (A-01B). First mandatory AASB S2 climate statement; directors' declaration s296C/296D dated 20 Aug 2026
FY26 Climate Transition Plan (voluntary companion, TPT-structured)
Reviewed
Material
Supplies FY25 comparatives and the "four targets, one emissions footprint" panel; carries an external peer-review foreword (not assurance, not target validation)
FY26 Sustainability Report (standalone)
Reviewed
Material
Public-facing claim wording; distinct from the "Sustainability Report: Climate Statements" inside the AR
Publicly available at fortescue.com. Emission factors, base-year recalculation policy and restatement threshold not independently verified; dependent items carried as cannot-verify (K-05)
Documents covering FY2027 and later
Deliberately excluded
—
None published at the review date; the corpus is scoped to FY2026 and earlier (Step 1)
Per-category Scope 3 method, factor datasets (Climatiq EXIOBASE/CEDA, NGA, GLEC v3.2, UK Gov), response rates, spend shares, evaluation status for all 15 categories
§3.1, F-4/F-5
S3-01..31, S3-EST, S3-25, S3-26, 29(a)(vi)
Reconciled
E3
AR folio 99, Scope 2 note
"Fortescue reports Scope 2 emissions using location-based method"; invoice data, <1% NABERS; no contractual-instrument information
F-11
S2-28, E-01..24, 29(a)(v), B30–B31
Reconciled (adverse)
E4
FY26 ESG Databook, Climate (Emissions)
Scope 2 market-based 0.53 MtCO₂e FY26 (0.52 FY25, 0.52 FY24), against LB 0.39; no method or definition anywhere in the pack
§3.1, F-11, F-16
S2-28, E-05, A-05, A-01B
Reconciled (adverse)
E5
FY26 ESG Databook, Climate (Energy)
Renewable electricity purchased 137.01 GWh FY26 vs 145.15 FY25; total purchased 800.19 vs 791.86 GWh
§3.3, §3.4
E-04, E-24, G-BAU
Reconciled
E6
AR folio 99, biogenic note
Biogenic Scope 1 from land clearing considered; "no quantitative figure has been reported" pending Land Sector and Removals Standard applicability
§3.1, F-17
G-11, A-05, A-21
Open (cannot verify)
E7
AR folio 93, Real Zero target table
Metric, objective, part, period 2030, absolute, Paris 1.5°C, GHGs, SDA No, third-party validation No, gross. No base period row. No milestones row. Progress table shows 2026 only: 2.35 / 0.37 / 2.72
F-6, F-14
33(e), 33(f), T-01..13, T-BASE-01
Reconciled (adverse)
E8
AR folio 96, Scope 3 target table
"Net zero Scope 3 by 2040", all relevant and calculated categories, absolute, Paris 1.5°C, SDA No, validation No, Net. No base period, no milestones, no associated gross target, no carbon-credit disclosure
FY21 baseline as published a year earlier: 185.9 Mt / 242.83 MtCO₂e / 1.31. FY23 Climate Change Report and FY22 ESG Databook Planet r.25 both carry 242.83 for FY21
F-8, Annex K.2
YOY-04, T-BASE-01, G-10
Reconciled (adverse)
E11
FY26 ESG Databook Note 3
"Baseline figures have been corrected to address a system error that caused them to be carried forward incorrectly in subsequent years. The original baseline figures remain unchanged." No before/after values, no components
F-8, F-19
YOY-04, G-10, A-05
Reconciled (adverse)
E12
AR folio 94
Company's own attribution of the 1.67% intensity fall: CRU factor update; higher Iron Bridge concentrate and lump share; partly offset by more Super Special Fines
§3.3, F-10
A-19, G-BAU, T-MI-06
Reconciled (adverse)
E13
AR folio 95
Shipping target progress: FY26 3.81 Mt / 0.019 vs FY21 baseline 4.07 / 0.022, "15 per cent below"; footnote states baseline used voyage-distance data where FY25/FY26 use fuel consumption
§3.3, §3.4
T-14, T-BASE-01, YOY-04
Reconciled
E14
AR folio 71 + folio 92 + CTP p.18
"Scope 1 and 2 emissions within scope of our Real Zero Target are expected to decline from FY28"; covered emissions 2.35 (FY24) → 2.60 (FY25) → 2.72 (FY26)
§3.3, §3.4, F-6
T-01..13, A-19, S2-38..42
Reconciled (adverse)
E15
FY26 CTP pp.14–15, 43–44
Milestones: FY27 first battery-electric haul trucks, 290 MW renewable capacity; FY28 24-hour fossil-fuel-free grid periods; FY31 all electrified mobile equipment (800 assets). "Emissions are therefore expected to decline as complete systems are commissioned and deployed, rather than at a uniform rate each year." No abatement quantity attached to any milestone
F-6, F-21, §5.2
T-01..13, 33(f), A-05
Reconciled (adverse)
E16
AR folios 71, 81–84 + CTP p.43
FY26 decarbonisation capital expenditure US$848m; US$6.2bn program; further US$680m approved in FY26; 550 km transmission complete; 370 MWh BESS installed; 18 electric excavators, 2 battery-electric locomotives; Eliwana diesel down 10 ML
F-2
A-16 (above baseline)
Reconciled (positive)
E17
AR folio 76, 88
Physical risk quantified: ~7 days additional average annual effective downtime by 2050 (SSP3-7.0), 0.55 Mt/day, US$91/dmt → US$100–500m; FY26 impact "no material impact"
F-3
N-01..03, N-04, S2-16, 29(b)
Reconciled (positive)
E18
AR folios 104–107
PwC reasonable assurance opinion on Scope 1 and 2 (criteria: 29(a)(i)(1)–(2), 29(a)(ii)–(v)); limited assurance on governance and strategy; separate limited assurance on Scope 3 and on Eligible Project Cumulative Spend
C3, C4(b), C5, AASB S2 first-year fairness control
Reconciled
E20
AR folios 159–162
FY26 ESSIP Decarbonisation block: weight 15, outcome 17.5. Integrated decarbonisation schedule 10/10 "Achieved"; profitably decarbonise 1% of remaining hard-to-abate, 1.9% achieved, 3.75/2.5 "Exceeded"; renewable power and mobile equipment US$350m capital reduction, US$491m achieved, 3.75/2.5 "Exceeded". Climate-related measures 32.5% of CEOs' total ESSIP, 28.8% other KMP, 20.8% of FY24 LTIP, 33.3% of SIP
F-12, §5.2
GOV-09..12, T-PROC-05, A-19
Reconciled (adverse)
E21
AR folio 18, 1434, 13929
Iron Bridge CGU pre-tax impairment US$750m (post-tax US$525m) "reflects a revised ramp up schedule and a range of production scenarios, including nameplate capacity of 22Mt"; carrying amount before impairment US$2,126m
F-13
S2-33..37 (connected information), A-01B
Reconciled (adverse)
E22
AR folios 85–89
Scenario analysis: transition 1.5°C, <2°C and a 2.6°C base case; physical SSP1-1.9/1-2.6/2-4.5/3-7.0 (5-8.5 for sea level); "the plausibility of limiting warming to 1.5°C with no or limited overshoot has declined"
§2.3, F-3
S2-22..24, N-04
Reconciled
E23
AR folios 84, 97
Internal carbon price A$97.92/tCO₂e long-term real, applied to Australian operations and investment activities; Safeguard compliance requirement ~0.3 MtCO₂e; carbon compliance cost US$9m in FY26; SMC preference over ACCU; units "not used to meet Fortescue's Real Zero Target"
§2.3, F-1
E-08..22, G-11, A-16
Reconciled
E24
FY26 ESG Databook, Climate (Energy) vs FY25 ESG Databook
Unit label states TJ against PJ values: diesel 26.03 where FY25 reported 26,277,016 GJ; total 45.27 where FY25 reported 42,891,755 GJ; 800.19 GWh stated as 2.88. FY23 Climate Change Report reports "Total net energy consumed (PJ)"
F-15
GHG-STD-08, DR-02, A-01B
Reconciled (adverse)
E25
Derived: FY26 databook energy + NGER Measurement Determination factors
Scope 1 movement decomposed: gas +2.45 PJ × 51.53 kg/GJ = +0.126 Mt; diesel −6.46 ML × 2.71 t/kL = −0.018 Mt; net +0.108 Mt against a reported +0.11 Mt
"In FY26, Fortescue's Scope 3 emissions were 275.64 MtCO₂-e, approximately 90 times greater than our Scope 1 and 2 emissions of 3.1 MtCO₂-e"; "four targets, one emissions footprint" panel
§2.1 (retail, public), F-5
OUT-TB-02, OUT-TB-03, OUT-TB-21
Reconciled (mitigating)
E28
CTP p.44, "Our commitment to SBTi"
"We paused validation while the Science Based Targets initiative (SBTi) reviewed its standards… We are currently assessing the final requirements to re-initiate our validation process." All four target tables record validation by a third party: No
§2.3, §3.4
T-SBTi-01, T-SBTi-03, C-SBTi-02, A-18
Reconciled (no overclaim)
E29
Full-text search of the FY26 suite for "1.5°C aligned", "carbon neutral", "100% renewable", "net zero" as an achievement claim
No self-applied alignment label, no neutrality claim, no renewable-electricity claim, no achievement assertion. The only 1.5°C uses are scenario analysis and the required "international agreement informing the target" row
§4.1, Annex K.3, P1 verdict
OUT-TB-02, OUT-TB-15, A-17, YOY-05
Reconciled (improvement)
E30
NGER register FY2024-25 (CER, as at 27 Feb 2026), FORTESCUE LTD, ABN 57 002 594 872
Scope 1 2,255,843 t; Scope 2 LB 806,331 t; net energy 38,361,571 GJ. FY2025-26 register not published at the review date
§5.3, Annex J.2, F-18
A-01C, DR-02, A-05
Open (cannot verify for the reviewed year)
Annex C: Claim register (AI-18 / OUT-TB-15)
Claim ID
Wording / paraphrase
Claim object
Claim source & basis (OUT-TB-15)
Doc & location
Strength
Audience
Evidence req/found/missing
Triggered scans
Rule IDs
Status
C1
"Fortescue's target to eliminate Scope 1 and 2 emissions from our Australian terrestrial iron ore operations in the Pilbara by the end of 2030", equivalent to Fortescue's equity share in joint ventures; "terrestrial" excludes Scope 1 shipping
Absolute gross Scope 1+2 on a named sub-boundary
Self-declared; not third-party validated; not SDA-derived; gross; no base period disclosed
AR folio 93; CTP p.19; Sustainability Report p.25; glossary
Above-baseline positive on a bounded claim; pathway missing (F-1, F-6)
C2
"Net zero Scope 3 by 2040. This target applies to all relevant and calculated GHG Protocol Scope 3 categories." Net or gross: Net
Absolute net Scope 3 across 275.64 MtCO₂e
Self-declared; not validated; not SDA-derived; net
AR folio 96; CTP p.36
Strong
Investors, public
Found: category coverage and the net designation. Missing: base period, interim targets, associated gross target, credit extent/scheme/type/permanence
Net-zero, offsets, target
33(e), 33(f), 36(c), 36(e), E-08..22, T-14
Materially unsubstantiated as to the netting (F-7, F-14)
C3
"By 2030, enable a reduction in emissions intensity from steelmaking by Fortescue's customers of 7.5 per cent, from FY21 levels"
Intensity, Scope 3 Category 10
Self-declared; base year FY21 (restated in FY26); enablement wording, not a control claim
AR folio 94; CTP p.33
Strong
Investors, public
Found: FY26 1.33 against a restated 1.35 baseline. Missing: pre-restatement baseline beside it, absolute cap, decomposition of the movement
Target-achievement, baseline, BAU
T-14, T-BASE-01, A-19, G-BAU, E-24
Reported direction turns on the restatement (F-8, F-9, F-10)
C4
"By 2030, enable a reduction in emissions intensity levels from the shipping of our iron ore by 50 per cent, from FY21 levels"; "FY26 shipping emission intensity decreased by 15 per cent relative to the baseline year"
Intensity, Scope 1 shipping + Scope 3 Cat 3/4/9
Self-declared; base year FY21; activity basis differs between baseline and current years, disclosed
AR folio 95; CTP p.30
Strong
Investors
Found: −15.3% verified by arithmetic. Missing: split of the real component from the method change
Target-achievement, baseline
T-14, T-BASE-01, YOY-04
Partly real, size of the real component cannot be separated (§3.3)
C5
"This is Fortescue Ltd's first climate-related financial statement prepared in accordance with Australian Sustainability Reporting Standard AASB S2… and the climate statement requirements of the Corporations Act 2001"
Standards compliance
Self-declared, supported by a directors' declaration and a PwC opinion on the Scope 1 and 2 disclosures only
"PwC provided reasonable assurance over Group and NGER Scope 1 and 2 emissions and limited assurance over Scope 3 emissions"
Assurance coverage
Third-party, ASSA 5000; all four reports printed in the AR with their criteria
AR folio 99 and folios 104–107
Strong
All
Found and verified against the reports themselves
Assurance
GOV-13..16, A-11
Accurate. Reasonable assurance on Scope 1 and 2 is the mandated level for the first year and is not credited (A-16)
C7
"The international agreement informing the target: Paris Agreement to limit global warming to 1.5°C", on all four voluntary targets
Target framing
Self-declared, and the required response to a standard disclosure item; not an alignment claim
AR folios 93–96
Moderate
Investors, public
Found: no SDA derivation, no validation, both stated "No"; the resilience section separately states 1.5°C plausibility has declined and models a 2.6°C base case
SBTi / alignment-label
T-SBTi-01, C-SBTi-02, OUT-TB-15
No overclaim. Answering the disclosure item is not an alignment assertion (§3.4)
C8
"In FY26, the North Star Junction Solar Farm generated 236 GWh of renewable electricity, avoiding an estimated 0.116 MtCO₂-e that would otherwise have been emitted by the Solomon gas power station"
Avoided-emissions counterfactual
Self-declared, estimated
AR folio 93 footnote; CTP p.14
Moderate
Investors, public
Found: implied 0.491 tCO₂e/MWh, plausible against a gas station. Not netted against the reported inventory
BAU / avoided-emissions
A-19, G-BAU, E-24
No apparent issue. Stated as an estimate and kept out of the inventory
C9
"Fortescue acquires and surrenders SMCs and ACCUs only to meet regulatory compliance obligations under the Safeguard Mechanism. These units are not used to meet Fortescue's Real Zero Target."
Credit use
Self-declared, describing a statutory obligation
AR folio 97; CTP p.21
Moderate
Investors, regulators, public
Found and consistent across sources. Silent on the 2040 net Scope 3 target
Offsets
E-08..22, G-11
Accurate as to Real Zero; the gap is what it does not say about C2 (F-7)
C10
Market-based Scope 2 of 0.53 MtCO₂e for FY26
Scope 2 on a contractual basis
Self-declared, unaudited, no method published
FY26 ESG Databook, Climate (Emissions) only
Moderate
Carbon accountants
Missing: method, factor source, residual-mix basis, contractual instruments held
Renewable / market-based Scope 2
S2-28, E-01..24, 29(a)(v), B30–B31, A-05
Cannot verify the basis; the absence from the audited statement is the finding (F-11)
C11
Climate transition plan foreword: "This is the third climate transition plan I have been asked to externally peer review for Fortescue" (Dr Ben Caldecott, Oxford Sustainable Finance Group)
Third-party review of the plan
Third-party opinion, not an assurance engagement and not target validation
CTP pp.10–11
Moderate
Investors, public
Found. The target tables separately and correctly state third-party validation "No"
Framework-halo
T-SBTi-03, OUT-TB-15, A-16
No apparent issue. Correctly not presented as validation; recorded so the distinction stays visible
FY26 is Fortescue's first mandatory year. Group 1 entity, Ch 2M sustainability report prepared, directors' declaration under s296C/296D signed 20 Aug 2026, PwC opinion and conclusions obtained. Governance, strategy, risk management, scenario analysis (transition 1.5°C / <2°C / 2.6°C base case; physical SSP1-1.9 to SSP3-7.0 with SSP5-8.5 for sea level), quantified financial effects and an internal carbon price all present (E18, E22, E23)
Met
Substantive rather than formal: the scenario tables, thresholds (low US$100–500m, medium US$500m–1bn, high >US$1bn) and vulnerability metrics are disclosed with their inputs
No apparent issue · High
A reader can interrogate the risk work rather than take it
—
D1-2
First-year reliefs: C3 comparatives relief relied on and disclosed in Note 1; C4(b) Scope 3 relief waived, Scope 3 disclosed voluntarily in full (E19)
Met; both elections disclosed
Waiving C4(b) puts 99% of the footprint into the audited book when it could have been deferred entirely. Above baseline (A-16)
Positive (above baseline) · High
The rest of this review is possible for a reader because the Scope 3 data exists
—
D1-3
Four AASB S2 target-disclosure requirements not met: 33(e) base period absent for the Real Zero Target and the Scope 3 Target (present for Steelmaking and Shipping, N/A for the Safeguard target); 33(f) milestones and interim targets absent for all four voluntary targets; 36(c) associated gross target absent for the net Scope 3 target; 36(e) planned carbon-credit use absent for that target (E7, E8). C3 relieves comparative information only and does not reach current-period target attributes
Potential compliance concern. Four paragraph-level omissions in a statement carrying a compliance declaration
These are the disclosures that make a target testable; without them findings F-6 and F-7 cannot be resolved from the book
Potential compliance concern · High
A reader cannot test either absolute target
Add the four items to the target tables
D1-4
29(a)(v) contractual-instrument information absent. The audited Scope 2 note describes the location-based method only. Contractual instruments exist (137.01 GWh renewable electricity purchased; a market-based figure computed and published in the data pack at 0.53 against 0.39 Mt). 29(a)(v) is inside PwC's stated audited criteria (E3, E4, E5, E18)
Potential compliance concern. B30 requires the information where such instruments exist and inform users' understanding; a market-based position 36% above location-based meets that description
The audited book gives no signal that a materially worse contractual position exists
Potential compliance concern · Medium-high
A Scope 2 reader of the audited statement forms an incomplete view
Disclose the market-based figure, method and contracts in the climate statement
D.2 GHG inventory foundation & Scope 1 (Sections 06–07)
ID
Finding & evidence chain
Min-compliance
Decision-usefulness / claim-quality
Severity · Confidence
Consequence
What would fix it
D2-1
Operational control applied consistently under NGER, then disaggregated to consolidated accounting group and other investees per 29(a)(iv); Iron Bridge 100% consolidated with a 69/31 disaggregation stated (E1). Scope 1 sources named with tracking method: diesel via a fuel management system reconciled to invoices, gas via monthly composition data, VLOCs via GLEC v3.2
Met
Boundary is testable and the equity/control distinction is legible
No apparent issue · High
—
—
D2-2
Scope 1 rose 2.64 → 2.75 MtCO₂e and the whole increase is gas. Derived: gas +2.45 PJ at 51.53 kgCO₂e/GJ = +0.126 Mt; diesel −6.46 ML at 2.71 t/kL = −0.018 Mt; net +0.108 Mt against a reported +0.11 Mt (E25). Company attributes the rise to ore shipped, Iron Bridge gas and material movement, which is consistent
Met (disclosed)
The cause is disclosed in words but not decomposed in quantities, so a reader cannot see that diesel actually fell while gas drove the whole increase
Decision-usefulness concern · High
The one lever moving in the right direction is invisible, and so is the size of the gas effect
Publish the fuel-level decomposition
D2-3
Biogenic Scope 1 considered, not quantified (E6). Expected to arise primarily from land clearing; no figure while the applicability of the Land Sector and Removals Standard is assessed
Minor limitation; the consideration and the reason are disclosed
A disclosed intention to assess is neither a fault nor a credit (A-21). The residual is a cannot-verify item, not a completeness failure, given the scale against 2.75 Mt
Cannot verify: evidence not provided · Medium
Small residual uncertainty in Scope 1
A quantified or bounding estimate
D2-4
Data-pack energy table states TJ against PJ values (E24), across the reviewed year and both comparatives. Demonstrated against the company's own FY25 GJ figures and against 800.19 GWh = 2,881 TJ
Not an AASB S2 metric; the audited statements are unaffected
Anyone lifting the energy figures takes a number 1,000× too small; the values are right and the label is not
Decision-usefulness concern · High
Misstated energy figures in the supplementary pack
Correct the unit heading
D.3 Scope 2 & renewable electricity (Section 08)
ID
Finding & evidence chain
Min-compliance
Decision-usefulness / claim-quality
Severity · Confidence
Consequence
What would fix it
D3-1
Dual reporting exists but only one basis reaches the primary disclosure. LB 0.39 in the AR, CTP, sustainability report and data pack; MB 0.53 in the data pack alone, with no method, factor source, residual-mix basis or contractual-instrument description anywhere, and no Scope 2 entry in the pack's Metrics Definitions sheet (E3, E4, E5)
Chains to D1-4 as a potential compliance concern under 29(a)(v)
The market-based position is 36% worse than location-based, which is the direction that matters, and it is the one a reader of the audited book never sees. Renewable electricity purchased fell 145.15 → 137.01 GWh while total purchases rose
Decision-usefulness concern · High
A reader cannot assess Fortescue's electricity contracting at all
Publish MB, its method and the contracts in the climate statement
D3-2
Cause of the 0.14 Mt LB/MB gap is cannot-verify (E4). An implied residual-mix factor near 0.80 t/MWh on the non-renewable balance would reconcile it, but no factor is published
Cannot verify (A-05)
Not asserted as a defect in the contracting; asserted as an undisclosed method
Cannot verify: material evidence missing · High
Open
The market-based method note
D3-3
No renewable-electricity claim is made anywhere in the FY26 suite (E29). Self-generated renewable electricity rose 0.65 → 0.85 PJ (180 → 236 GWh) and is reported as generation, not as a percentage claim
No apparent issue
The absence of a "100% renewable" style claim removes the commonest Scope 2 claim-quality risk. Not credited: making no claim is not above baseline
No apparent issue · High
—
—
D.4 Scope 3 & value chain (Section 09)
ID
Finding & evidence chain
Min-compliance
Decision-usefulness / claim-quality
Severity · Confidence
Consequence
What would fix it
D4-1
All 15 categories addressed with an evaluation status; 11 quantified; C11, C12, C14, C15 marked not relevant each with a stated basis (intermediate products only; no franchises; assessed immaterial). Categories sum to 275.643 against a published 275.64 (E1, E2)
Met
Complete and reconcilable. The FY25 gap, categories shown without a stated materiality basis, is closed
No apparent issue · High
A supply-chain accountant can lift the whole set
—
D4-2
Category 10 (268.64 Mt, 96.4% of the footprint) modelled by CRU on regional average-data factors by product type across five destination groups, with the process stages included and excluded both stated (E2)
Met
Estimation is the expected starting point and is not a fault (S3-EST). The method is unusually well described for a downstream processing category
No apparent issue · High
—
Supplier-specific or mill-specific factors would reduce dependence on one consultancy's annual revision
D4-3
Categories 1, 2 and 8 are spend-based on Climatiq (EXIOBASE and CEDA) factors, UNSPSC-mapped, US-CPI inflation adjusted (E2)
Met
Recorded as an improvement note, not a fault (S3-EST, OUT-STK-03)
No apparent issue · High
—
—
D4-4
Absolute Category 10 rose 242.83 → 268.64 MtCO₂e (+10.6%) over FY21–FY26 while the only 2030 lever over it is a 7.5% intensity target (E9, E26). The transition plan presents that intensity target as an interim milestone toward net zero Scope 3 by 2040
Met on disclosure; the trend is published
An intensity milestone does not constrain the absolute quantity the 2040 target must eliminate, and the quantity has grown every year since the baseline (T-14)
Decision-usefulness concern · High
A reader can take the intensity milestone as evidence the absolute target is on a pathway
Co-locate the absolute trend and set an absolute 2030 cap
D4-5
Category 15 assessed immaterial without a bounding estimate, but investee operational emissions are separately bounded at 0.06 Mt across Scope 1 and Scope 2 under 29(a)(iv) (E1)
Met
The 29(a)(iv) disaggregation supplies the bound OUT-STK-13 would otherwise require
No apparent issue · Medium-high
—
—
D.5 Offsets, credits & net claims (Section 10)
ID
Finding & evidence chain
Min-compliance
Decision-usefulness / claim-quality
Severity · Confidence
Consequence
What would fix it
D5-1
Voluntary offsetting ceased in 2023; Safeguard units acquired and surrendered for compliance only (~0.3 MtCO₂e FY26, US$9m); expressly not used for the Real Zero Target; SMC preferred over ACCU (E23, C9)
Met
The gross discipline on the operational target is real and stated. Above baseline in combination with the absolute gross target (A-16), recorded at F-1
Positive (above baseline) · High
A reader can be confident the 2030 operational target cannot be met by purchase
—
D5-2
The 2040 Scope 3 target is net and the netting is undisclosed (E8, C2). No associated gross target (36(c)); nothing on extent of reliance, crediting schemes, credit type, removal-versus-reduction or permanence (36(e)). The credits paragraph addresses Real Zero and is silent on this target
Potential compliance concern under 36(c) and 36(e); chains to D1-3
Over 275.64 MtCO₂e the difference between a gross and an unlimited-netting commitment is up to 275 Mt. A reader cannot tell which has been committed to
Serious compliance / misleading-risk concern · High
The commitment over 99% of the footprint is unbounded in substance
Publish the associated gross target, the residual quantity, the credit types and the verification scheme
D.6 Targets & transition (Section 11)
ID
Finding & evidence chain
Min-compliance
Decision-usefulness / claim-quality
Severity · Confidence
Consequence
What would fix it
D6-1
No quantified pathway to Real Zero (E7, E14, E15). Covered emissions 2.35 → 2.60 → 2.72 MtCO₂e (+15.7% over two years); decline stated to begin FY28; no base period, no interim target, no abatement quantity attached to any milestone; the plan states decline will not be uniform; the final mobile-equipment milestone is FY31 against a target date of "the end of 2030" whose year-end basis is not stated
Chains to D1-3 (33(e), 33(f))
An absolute target with a rising base, four years out, cannot be tested by anyone until it falls due
Decision-usefulness concern, escalated to potential compliance concern via D1-3 · High
The nearer of the two headline commitments is unpriceable
A year-by-year abatement pathway in MtCO₂e by lever, plus the base period and the year-end basis
D6-2
FY21 Steelmaking baseline restated (E9, E10, E11). Ore shipped 185.9 → 182.18 Mt; emissions 242.83 → 246.14 MtCO₂e; intensity 1.30624 → 1.35110. FY26 actual 1.33436 is +2.15% against the prior baseline and −1.24% against the restated one. 2030 endpoint moves from ~1.208 to ~1.250, about 8.35 MtCO₂e at FY26 volumes. Disclosed in the data pack Note 3 as correcting a carried-forward system error; the AR and CTP print the new figure without comment; no before/after values published. The original FY21 figure of 242.83 appears in the FY22 databook and the FY23 Climate Change Report
Minor limitation on disclosure of the fact; decision-usefulness concern on its placement and completeness
The reported direction of travel against the only 2030 lever over 96% of the footprint changes sign on the restatement, and a reader needs last year's superseded pack to see it. No intent is inferred: the stated reason is a correction, and 182.18 Mt is consistent with Fortescue's actual FY21 shipments
Decision-usefulness concern · High
Progress against C3 is not readable on a single basis
Publish the prior baseline beside the corrected one, the size and components of the correction, and the effect on the 2030 endpoint
D6-3
This year's intensity movement is external and mix-driven on the company's own account (E12): CRU factor revision, higher Iron Bridge concentrate and lump share, partly offset by more low-grade fines
Met on disclosure; the drivers are stated
None of the three drivers is abatement Fortescue delivered. Read as progress toward the 2030 target it overstates what has been achieved (A-19, G-BAU)
Decision-usefulness concern · High
The one number moving toward the target is a third party's factor revision
Report the factor, mix and own-action components separately
D6-4
Shipping target: FY26 intensity 0.018924 against a baseline of 0.022341, −15.30% verified, against a −50% target for 2030; flat for three years within the current series; baseline computed on voyage distance where current years use fuel consumption, which the company discloses; the baseline ore-shipped figure was also restated (E13)
Met; the non-comparability is disclosed
Partly real (chartering policy, eco steaming, energy-saving devices), but the real component cannot be separated from the method change
Decision-usefulness concern · Medium
Progress against C4 is directionally right and not sizeable
Publish the like-for-like series
D6-5
No target was weakened, retired, re-dated or re-scoped in FY26; all four voluntary targets are retained on unchanged dates and boundaries (E7, E8, E9, E13)
Met
Continuity earns no credit (A-16), but its absence would have been a finding. Recorded so the trajectory reads correctly
No apparent issue · High
—
—
D6-6
SBTi validation disclosed as paused pending the initiative's own standards review, with re-initiation being assessed; every target table records third-party validation "No"; no "1.5°C aligned" self-label anywhere in the suite (E28, E29)
Met
The FY25 alignment-label exposure is closed. Not credited: accurate labelling is baseline (A-16, A-18)
Board retains oversight; Safety and Sustainability Committee primary; AFRMC on controls and assurance; People, Remuneration and Nomination Committee on climate pay metrics; quarterly Board updates; a Decarbonisation Steering Committee below management. Management responsibility expressly not delegated to a single position (E18, AR folio 72)
Met
Disclosed clearly; baseline for a Group 1 entity and not credited (A-16)
No apparent issue · High
—
—
D7-2
Assurance: reasonable on Scope 1 and 2 (the mandated level for the first year), limited on governance and strategy, limited on Scope 3 (voluntary), limited on Eligible Project Cumulative Spend. All four reports printed with their AASB S2 criteria (E18)
Met
Obtaining limited assurance over a voluntarily disclosed Scope 3 is above the required scope; the mandated reasonable assurance is baseline and is not credited
Qualified positive · High
The dominant 99% of the footprint sits at the lower assurance level
Reasonable assurance over Category 10 as the method matures
D7-3
Decarbonisation ESSIP block paid 17.5 against a weight of 15 while covered emissions rose 4.6% (E20). Three measures: integrated decarbonisation schedule (delivery of schedule and budget, 10/10); advance pathways to profitably decarbonise 1% of remaining hard-to-abate emissions (1.9% achieved, 3.75/2.5); renewable power and mobile equipment US$350m capital reduction (US$491m achieved, 3.75/2.5). None is an emissions outturn. Climate-related measures total 32.5% of the CEOs' ESSIP, 28.8% for other KMP, 20.8% of the FY24 LTIP, 33.3% of the SIP
Met on disclosure; the scorecard, the weights and the outcomes are all published
Process, delivery and cost measures can be exceeded while the emissions they exist to reduce rise. A reader reasonably reads an above-weight climate scorecard outcome as emissions progress (T-PROC-05, A-19)
Decision-usefulness concern · High
Pay signals progress the inventory does not show
Add an emissions-outturn measure on the Real Zero boundary
D7-4
Connected-information gap on Iron Bridge (E21, E12). The climate statement names Iron Bridge as the driver of the Scope 1 rise and, via concentrate sales, of the intensity fall; the financial statements record a US$750m pre-tax impairment on the same CGU for a revised ramp-up. The climate statement's connectivity note does not address it
Minor limitation
The product-mix lever behind the Steelmaking Target and the asset written down on a revised production outlook are the same asset; a reader testing that target would want both facts together
Decision-usefulness concern · Medium-high
The durability of this year's mix-driven intensity gain is not assessable
Connect the revised ramp-up to the product-mix assumption and state the effect on the 2030 endpoint
Mining module (SEC-MIN). Downstream processing of sold products is the dominant category and is quantified with a described method and regional segmentation; product-grade strategy (Iron Bridge concentrate, lump, Belinga) is disclosed as the transition lever; the grade-preference divergence across the three transition scenarios is tabled (E2, E9, E22)
Met
The sector's characteristic disclosure gap, an unquantified customer footprint, does not arise here
No apparent issue · High
—
—
D8-2
Mining module: reserve and life-of-mine linkage. The impairment note records that management "considers the impact of material climate-related risks, both transitional and physical, on estimates of future costs and useful lives of assets" (E21), but no climate-adjusted reserve or life-of-mine sensitivity is disclosed
Minor limitation
A generic statement of consideration without a sensitivity leaves an investor unable to size the effect of the transition scenarios on carrying values
Decision-usefulness concern · Medium
Transition exposure to asset values is not quantified
Disclose the climate sensitivity applied in the impairment models
D8-3
Safeguard Mechanism: seven covered facilities named (Iron Bridge, Cloudbreak, Christmas Creek, Solomon, Eliwana, Solomon Power Station, Rail); FY26 requirement ~0.3 MtCO₂e; baseline-setting mechanics and the new-facility international-best-practice benchmark for Iron Bridge explained; modelled exposure US$53m at US$27/t and US$142m at US$71/t (E23)
Met
Unusually full disclosure of a statutory scheme's mechanics and the entity's exposure under it
No apparent issue · High
—
—
D8-4
SEC-INV-LT-17 / T-INV-01 screen: Fortescue holds equity investments (Alta Copper, Fortescue Capital, a US$150m renewable infrastructure fund with Catalyst) and joint ventures. Investee operational emissions are bounded at 0.06 Mt (E1); Category 15 assessed immaterial
Met
No material inherited emissions-growth exposure identified. Investments are weighted toward renewable infrastructure and critical minerals rather than fossil assets
No apparent issue · Medium-high
—
—
Financed-emissions target headroom & benchmark (SEC-FI-TGT-04): N/A, not a financial institution.
Sector target
Latest reported
Target value
% change permitted
Flat-line benchmark
Fossil-fuel override?
Ruling
N/A
N/A
N/A
N/A
N/A
N/A
Not a financial institution
D.9 Nature & physical risk (Section 14)
ID
Finding & evidence chain
Min-compliance
Decision-usefulness / claim-quality
Severity · Confidence
Consequence
What would fix it
D9-1
Seven climate hazards profiled; site-level modelling on CMIP6 downscaled projections; SSP1-2.6 quantitative low-warming case with SSP1-1.9 assessed qualitatively and the equivalence reasoned; SSP3-7.0 primary high case, SSP5-8.5 for sea level on data availability; severity-weighted expected annual impacts with a worked example (a 1-in-200-year cyclone contributing ~0.5 days) (E17, E22)
Met
Relevance and methodology transparency are both satisfied. The review does not judge the scientific quality of the modelling
Positive (above baseline) · High
An investor can re-run the arithmetic with their own assumptions
—
D9-2
Chronic hazards stated as not yet incorporated; scope limited to the Pilbara iron ore value chain, with the limitation stated and a commitment to review scope as the portfolio changes
Minor limitation
A disclosed intention to extend is neither a fault nor a credit (A-21); the present treatment is sound and scoped in terms
No apparent issue · High
—
—
D9-3
Nature disclosure (net positive impact goal, A$3m FY26 and A$13m since FY24 in biodiversity partnerships, Fortescue Marsh managed aquifer recharge, 226,879 ML abstracted with 145,230 ML reinjected) sits in the standalone Sustainability Report, not the climate statement
Met; nature is outside AASB S2
Recorded for completeness; not scored under a climate protocol
The 2040 Scope 3 target is net with the netting undisclosed (D5-2)
The headline-claim ceiling, because the target covers 99% of the footprint and the difference between gross and unlimited netting is the substance of the commitment
FY21 steelmaking baseline restated with the explanation in one unaudited source (D6-2)
Progress against the only 2030 lever over 96% of the footprint, and through it the retail and investor readings of target achievement
T-BASE-01, YOY-04, G-10 · E9, E10, E11
Minor limitation → decision-usefulness concern
Decarbonisation scorecard block paid above weight on non-emissions measures while covered emissions rose (D7-3)
The credibility of the pay-to-target link, because 32.5% of the CEOs' short-term scorecard is described as climate-related
T-PROC-05, GOV-09..12, A-19 · E20
Minor limitation → decision-usefulness concern
Intensity target presented as an interim milestone while absolute Category 10 rose 10.6% (D4-4)
The credibility of the 2040 absolute target, whose eliminable quantity has grown every year since the baseline
T-14, A-19 · E9, E26
Decision-usefulness concern (held; no further escalation)
Annex F: NoCO2 Net Zero Required Interventions, CAAM & Prohibited Activities screen (OUT-05)
Screen
Output
Basis
Required Interventions Schedule
Applicable
At-source elimination of diesel and gas across Pilbara mining, rail and stationary power is the intervention the Standard would require for this profile, and it is the path already chosen; the gap is the quantified trajectory, not the intervention choice (D6-1)
Clean Alternative Assessment
Potentially applicable; evidence required
Continued gas firing at Solomon Power Station during the Iron Bridge ramp-up is the single largest driver of the FY26 increase (D2-2). A documented assessment of when it is displaced, and by what, would satisfy the screen
Prohibited Activities Schedule
Not apparently applicable
No activity identified in the reviewed materials that would fall within the schedule. Iron ore extraction and the sale of intermediate products are not prohibited activities; the customer-steelmaking footprint is addressed through the influenced-emissions treatment (§6.1) rather than this screen
Annex G: Rule-application table
Rule family
Applied?
Result
Applicability gate (L / S2-01..06)
Yes
Group 1 entity, FY26 first mandatory year, Ch 2M sustainability report prepared, directors' declaration s296C/296D. Gate passed (D1-1)
GHG inventory foundation (G / GHG-STD)
Yes
Operational control applied consistently, 29(a)(iv) disaggregation present, categories reconcile to the published total. Biogenic Scope 1 unquantified (D2-1, D2-3); data-pack energy unit label wrong (D2-4)
Scope 1 (G-06 / S2-26)
Yes
2.75 MtCO₂e, reasonable assurance; increase decomposed to gas at Solomon Power Station (D2-2)
Scope 2 & renewables (E / S2-28)
Yes
Location-based 0.39 in the audited statement; market-based 0.53 in the data pack only, no method, no contractual-instrument disclosure (D3-1, D3-2). No renewable-electricity claim (D3-3)
Scope 3 (S3 / S3A / G-15)
Yes
All 15 categories addressed with stated bases; Category 10 quantified with method; absolute Category 10 rose 10.6% over the series against an intensity-only 2030 lever (D4-1 to D4-5)
Offsets / net claims (E-08..22 / G-11)
Yes
Voluntary offsetting ceased, Safeguard units compliance-only and excluded from Real Zero (D5-1); the 2040 Scope 3 target is net with the netting undisclosed (D5-2)
Targets & transition (T / S2-14/15/40)
Yes
No pathway, base period or interim target for Real Zero (D6-1); FY21 steelmaking baseline restated (D6-2); this year's intensity movement is external and mix-driven (D6-3); shipping partly real (D6-4); no target weakened (D6-5); SBTi position accurate (D6-6)
Governance baseline met (D7-1); assurance above the required scope on Scope 3 (D7-2); decarbonisation pay block paid above weight on non-emissions measures (D7-3); Iron Bridge connectivity gap (D7-4)
Sector (SEC-*)
Yes, mining
Downstream processing quantified (D8-1); no climate-adjusted reserve or life-of-mine sensitivity (D8-2); Safeguard exposure disclosed (D8-3)
SEC-FI-TGT-04
No
Not a financial institution
SEC-FI-05A
No
Not a financial institution
SEC-SF / SEC-INV-LT
Yes, screen only
No material inherited emissions-growth exposure; investee operational emissions bounded at 0.06 Mt (D8-4)
NOCO2-MAP-01/02
Yes
Clause-level mapping at §6.1; §6.1 mechanisms cite specific clause numbers
Nature / physical risk (N)
Yes
Physical-risk assessment quantified and methodologically transparent (D9-1); chronic hazards not yet incorporated, disclosed (D9-2); nature disclosure outside the climate protocol (D9-3)
The FY26 market-based Scope 2 method note; the contractual instruments held with volumes and terms; the residual-mix factor applied and its source; retirement or cancellation records where certificates are involved
Open
K-02
Biogenic Scope 1
Scope 3 / inventory
A quantified or bounding estimate of land-clearing biogenic emissions for FY26, or the assessment concluding it cannot yet be estimated
Open
K-03
FY2025-26 NGER return
Assurance / statutory
The FY2025-26 NGER register row once published, for reconciliation against the disclosed Scope 1 and location-based Scope 2 after boundary normalisation
Open, timing only
K-04
FY21 steelmaking baseline restatement
Target progress
The baseline as previously stated, the corrected figure, the split between the ore-shipped and emissions components, and the effect on the 2030 endpoint
Open
K-05
FY26 Emissions Calculation Methodology
Scope 3 / inventory
The standalone published methodology, for emission factors, the base-year recalculation policy and the restatement threshold
Open, document not obtained for this review
K-06
Real Zero target period basis
Target progress
Whether "the end of 2030" refers to calendar 2030 or FY2030, and where the FY31 mobile-equipment milestone falls relative to it
Open
K-07
Real Zero abatement pathway
Target progress
Year-by-year abatement quantities in MtCO₂e to 2030, attributed by lever, with the base period
Open
K-08
2040 Scope 3 net target architecture
Offsets
The associated gross target, the residual quantity, the planned credit types and volumes, the crediting schemes and the permanence assumptions
Open
K-09
Iron Bridge climate sensitivity
Target progress
The climate-related sensitivity applied in the Iron Bridge impairment model and the effect of the revised ramp-up on the Steelmaking Target's product-mix assumption
Any reduction or target-progress claim: business-as-usual decomposition
Scope 1 fuel decomposition; Scope 2 grid factor versus consumption versus instruments; Scope 3 factor revision versus mix versus supplier decarbonisation (§06, §03)
E5, E12, E25
Decision-usefulness concern (D2-2, D6-3)
M-10
Combined "Scope 1+2" figures reported
Decomposed into Scope 1 and Scope 2, and Scope 2 into location- and market-based, in §3.1, §3.3 and §3.4 (§06, §07, §08)
E1, E4, E25, E26
Applied throughout; no lump figure analysed
M-11
Australian entity; metrics appearing in more than one source
NGER register lookup; cross-source consistency matrix; boundary and period normalisation before flagging (§16, §01)
E30, Annex J
Cannot verify for the reviewed year (decision D-013)
M-12
More than one period and report type available
Multi-period series FY2021 to FY2026; restatement and rebasing detection; dropped and added disclosures; target weakening; cross-report-type divergence; certification continuity (§17, §06, §11)
E10, E11, E19, E26, E28, E29
Applied; Annex K
M-13
Coverage-percentage claim screen
Numerator, denominator, excluded categories
E27, C1
No coverage percentage is claimed for FY26; the ratio is stated in the transition plan instead. Screen closed without a finding
M-14
Completeness word beside a named quantity
Bounded-on-its-face test before testing the claim
C1, E27
"Real Zero" is bounded on its face by the boundary in its own sentence; tested for reader impression rather than on the size of the quantity
M-15
Disclosed intention to review, extend or improve
Forward candour is neither fault nor credit; tested for a restated-and-undelivered pattern across periods
E6, D9-2
Neutral. Biogenic quantification and chronic-hazard extension are first-stated in FY26, so no pattern arises
M-16
Source described as controlled by another party
Which-scope test before writing any exclusion or cannot-verify finding
E1, E2
Applied. Customer steelmaking and third-party shipping are Scope 3, so operational control is irrelevant to them and no boundary excuse is available or claimed
M-17
Equity and fund investments held
Inherited emissions-growth look-through; investee weights and headroom
E1, D8-4
No material exposure; investee operational emissions bounded at 0.06 Mt
FY2025-26 register not published at the review date. Latest published: FY2024-25, as at 27 Feb 2026, FORTESCUE LTD (ABN 57 002 594 872), 2,255,843 t
NGER is Australian facilities only; the disclosed figure is global. Period differs from the reviewed year
Not for the reviewed year
Cannot verify: evidence not available for the period
Scope 2 (location-based)
FY26: 0.39 MtCO₂e (Group, global)
FY2024-25: 806,331 t
Same boundary differences, and the NGER measurement basis differs from the corporate basis. The prior-period figures move in opposite directions relative to the disclosed ones, which cannot be resolved without the reconciling items
Not for the reviewed year; the prior-period difference is an undisclosed reconciling item
Cannot verify. Recorded as prior-period context only; a divergence in the FY2024-25 register is a question for the FY2025 period, not a FY2026 finding (decision D-013)
Net energy (GJ)
Not disclosed in the climate statement; the data pack states 45.27 with a defective unit label
FY2024-25: 38,361,571 GJ
Australian facilities only versus global; NGER net energy is not the same measure as energy consumed within the organisation
Not attempted for the reviewed year
Cannot verify
Absence from a register is never read as zero emissions, and the unpublished FY2025-26 register is a timing matter, not a finding against the entity.
"Real Zero" as an organising name over about 1% of the footprint, with the other 99% under a net target whose netting is undisclosed (D5-2, P2). Held at moderate because the boundary is co-located at every substantive mention
Real Zero wording row; consistent across sources
State the proportion of the footprint each target covers wherever it is named; quantify the permitted netting
O-2
Regulatory (AASB S2 / ASIC)
Moderate to elevated · high
Five paragraph-level gaps in a first mandatory filing carrying a directors' declaration: 33(e), 33(f), 36(c), 36(e) and 29(a)(v), the last inside the audited criteria (D1-3, D1-4)
Market-based Scope 2 row
Close the five in the FY27 statement, and by supplementary disclosure sooner where practical
O-3
Regulatory (Clean Energy Regulator / Safeguard)
Low · high
Seven covered facilities, FY26 requirement about 0.3 MtCO₂e, mechanics and modelled exposure disclosed, compliance-only use stated (D8-3, E23)
Safeguard column
—
O-4
Technology (dependence on unproven abatement)
Elevated · high
Battery-electric haulage at fleet scale, rail electrification at engineering-validation stage, an integrated off-grid renewable system, all against a 2030 date, with the plan itself stating first-mover cost and sequencing risk and placing full mobile-equipment deployment at FY31 (D6-1, E15)
Not a cross-source matter
Publish the abatement quantity per lever and the fallback where a lever slips
O-5
Physical (physical-risk disclosure consistency)
Low · high
Quantified, inputs disclosed, scope limitation stated, FY26 outturn reported as no material impact; chronic hazards stated as not yet incorporated (D9-1, D9-2)
Consistent across sources
Extend quantification to chronic hazards
O-6
Other: remuneration
Moderate · high
The decarbonisation scorecard block paid 17.5 against a weight of 15 on three non-emissions measures while covered emissions rose 4.6%; climate-related measures are 32.5% of the CEOs' short-term scorecard (D7-3, E20)
Remuneration report versus climate statement
Add an emissions-outturn measure on the Real Zero boundary
O-7
Other: comparability over time
Moderate · high
The FY21 steelmaking baseline restated with the explanation in one unaudited source, no before-and-after values, and reported progress reversing sign on it (D6-2)
FY21 baseline row
Publish the prior baseline, the correction's components and the effect on the 2030 endpoint
O-8
Other: reporting accuracy
Low · high
The data pack's energy table understated a thousandfold by its stated unit across three years (D2-4)
1.31 as published to FY25; 1.35 as restated in FY26
1.33
1.361
1.368
1.357
1.334
FY25 databook; AR folio 94 and FY26 databook (FY26 and the restated baseline)
Not like-for-like against the baseline: the company states the baseline used global sectoral factors where FY22 onward use product- and location-specific factors
Shipping intensity (MtCO₂e/Mt)
0.022 (restated; 0.0176 pre-restatement)
Not published
0.016
0.019
0.019
0.019
FY24 databook (pre-restatement); FY25 databook; AR folio 95
Baseline computed on voyage distance; FY24 onward on fuel consumption. Disclosed
Renewable electricity purchased (GWh)
0.7
108.46
131.01
142.58
145.15
137.01
FY23 Climate Change Report (FY21); FY24 databook Product r.44 (FY22 and FY23 as corrected); FY25 and FY26 databooks
Purchased only; excludes self-generation. FY22 and FY23 as corrected in the FY24 databook (see P2-9)
Self-generated renewable electricity (GWh)
0
0
0
0
180.4
236.1
FY25 databook (GJ, converted); FY26 databook
North Star Junction from FY25
Offset / certificate volume (MtCO₂e)
0.20 voluntary
0.26 voluntary
0.34 voluntary
Compliance only
Compliance only
Compliance only, about 0.3 Mt Safeguard units
FY22 databook Planet r.9 versus r.13; FY23 Climate Change Report; AR folio 97
Voluntary offsetting ceased in 2023; Safeguard units are a statutory obligation
Headline target set
Net Scope 1 and 2 to zero by 2030
Real Zero adopted; four targets set
Four targets
Four targets
Four targets
Four targets, unchanged
FY22 databook; FY23 Climate Change Report; CTP each year
The 2022 change from a net operational target to a gross one is a strengthening
Carbon-neutral / net-zero claim status
Net operational target with offsets
Offsetting winding down
Voluntary offsetting ceased
No neutrality claim
No neutrality claim; "1.5°C aligned" self-label present
No neutrality claim; no "1.5°C aligned" self-label; no target described as validated
Full-text search of each suite
Claim set narrowed and became more accurate in FY26
Reverses the reported direction. FY26's 1.33436 is +2.15% against the prior baseline and −1.24% against the restated one. The 2030 endpoint moves from about 1.208 to about 1.250, roughly 8.35 MtCO₂e at FY26 volumes
Decision-usefulness concern (D6-2, F-8)
P2-4
FY21 Shipping baseline, ore shipped
185.9 Mt
182.18 Mt
Same correction
Lifts baseline shipping intensity from 0.021894 to 0.022341, improving the reported reduction from 13.6% to 15.3%
Minor limitation; same correction, much smaller effect
P2-5
FY25 Scope 3 Category 3
0.55 MtCO₂e (FY25 databook)
0.61 MtCO₂e (FY26 databook)
Yes. Note 1 states the restatement corrects a calculation error and identifies the affected total
Total Scope 3 FY25 moves 275.88 → 275.94
Acceptable. Properly disclosed
P2-6
FY24 Scope 3 Categories 4 and 9
As published in the FY25 pack
Restated to the latest GLEC factors (FY26 databook Note 2)
Yes. Basis and reason stated
Immaterial to any claim
Acceptable
P2-7
FY24 diesel consumption
631.32 million litres (FY25 databook)
630.97 million litres (FY26 databook Note 1)
Yes. Methodology alignment stated
None
Acceptable
P2-8
FY25 purchased electricity
As published
Corrected for a decimal-place display error (FY26 databook Note 4), underlying values unchanged
Yes
None
Acceptable
P2-9
FY23 and FY22 renewable electricity purchased (Group, GWh)
Yes. The FY24 databook's GRI restatements table states each prior value "was found to be incorrect" and that renewable electricity was purchased only in Australia
None on a target or pay claim; the FY23 to FY26 purchased series rises to FY25 before falling, rather than falling throughout
Acceptable. Properly disclosed; the corrected figures are carried in §3.4 and P.1
P.3 Dropped / added disclosure log (YOY-05)
#
Item
Present in
Absent/added in
Explained?
Label
P3-1
Stated materiality basis for Categories 11, 12, 14 and 15
Added in FY26 (AR folio 102)
Absent in FY25
N/A, an addition
Improvement. The FY25 gap where categories were shown without a stated basis is closed
P3-2
"1.5°C aligned" self-applied label
Present in the FY25 transition plan
Absent from the entire FY26 suite
Not narrated, but SBTi validation is separately disclosed as paused and all four target tables state validation "No"
Improvement. A withdrawn overclaim; not credited under A-16 and A-18, but its absence removes a live exposure
P3-3
FY25 comparatives in the primary emissions table
Present in prior years
Absent from the FY26 audited statement; present in the voluntary transition plan
Yes, Note 1 discloses reliance on the first-year comparatives relief
Acceptable. A permitted relief, properly disclosed, and the figures are published elsewhere
P3-4
Steelmaking 2030 endpoint printed as a value (1.21 in the FY25 transition plan)
Present in FY25
Absent from FY26
Not explained
Decision-usefulness concern. The endpoint moved with the baseline restatement and is no longer printed, so a reader cannot see either the old or the new destination value
P3-5
Emissions pathway chart
Withdrawn before FY26
Absent
Not explained
Decision-usefulness concern; chains to D6-1
P3-6
Market-based Scope 2
Data pack only in FY23, FY24, FY25 and FY26
Never in the audited statement
Not explained
Decision-usefulness concern, unchanged across four periods (D3-1)
P3-7
Coverage percentage for the Real Zero Target ("87% of FY22 Scope 1 and 2" in FY25)
Present in FY25
Absent from FY26
Not explained. The transition plan's 90× ratio and "four targets, one emissions footprint" panel substitute for it
Minor limitation. The scale is still readable, in a different form and in a different document
P3-8
Quantified financial effects of climate-related risks
Added in FY26 (physical US$100–500m; Safeguard US$53m to US$142m; diesel fuel tax credit US$249m; maritime US$300–400m by 2035)
Not present in this form in FY25
N/A, an addition and a mandatory-year requirement
Improvement. Mandated, so not credited, but it materially changes what an investor can price
P.4 Target-trajectory log (YOY-06 / YOY-08)
#
Target / claim
Base yr
Target yr
Coverage / scope
Change across periods
On-track survives series?
Label
P4-1
Real Zero Target
Not disclosed in FY26; FY22 in the FY25 pack
2030
Scope 1 and 2, Australian terrestrial iron ore, equity share; 2.72 of 278.77 MtCO₂e
Unchanged in wording, boundary and date. The base year row disappeared from the FY26 target table
No. Covered emissions rose 2.35 → 2.60 → 2.72 MtCO₂e and are stated not to fall until FY28
Decision-usefulness concern (D6-1); the disappearance of the base period is also a compliance gap (D1-3)
P4-2
Scope 3 Target
Not disclosed
2040
All relevant and calculated categories; 275.64 MtCO₂e; net
Unchanged. No base period, milestones, associated gross target or credit architecture in any period
Depends on the baseline. Above the FY21 baseline in every disclosed year on the prior basis; 1.2% below on the restated basis
Decision-usefulness concern (D6-2, D6-3)
P4-4
Shipping Target
FY21 (ore-shipped figure restated in FY26)
2030
Scope 1 shipping and Scope 3 Categories 3, 4 and 9; intensity
Target unchanged; the baseline's ore-shipped figure moved
Partly. 15.3% against a 50% goal, and flat for three years within the current series
Decision-usefulness concern (D6-4)
P4-5
SBTi validation
N/A
N/A
All targets
Paused in FY25 pending the initiative's standards review; still paused in FY26, with re-initiation being assessed and every target table stating validation "No"
N/A
No apparent issue. Accurately stated in both periods (D6-6)
P4-6
Safeguard Mechanism target
N/A
Annual
Scope 1 at seven covered facilities; intensity
Facility count and mechanics disclosed; FY26 requirement about 0.3 MtCO₂e
Compliance obligation, met by unit surrender
No apparent issue (D8-3)
P.5 Cross-report-type consistency over time (YOY-07 / DR-02)
Present in the data pack in FY23, FY24, FY25 and FY26; never in the Annual Report
Persistent and unchanged across four periods. It became more consequential in FY26 because the audited statement is now a mandatory climate statement in which 29(a)(v) applies
Audited source preferred; the data-pack figure is recorded but its basis is cannot-verify
Decision-usefulness concern, escalating to a potential compliance concern in the mandatory year (D3-1, D1-4)
P5-3
Comparative-year figures
Annual Report versus transition plan
New in FY26: the audited statement carries one year, the voluntary plan carries two
New this period, and explained by a disclosed relief
Audited source preferred; the plan's comparatives are used as context only
Acceptable
P5-4
Target baseline explanation
Annual Report and transition plan versus ESG databook
New in FY26: all three print the restated baseline, only the data pack explains it
New this period
Audited source preferred for the figure; the explanation exists only in the supplementary source
Decision-usefulness concern (D6-2)
P5-5
Alignment labelling
Transition plan versus Annual Report
FY25: "1.5°C aligned" appeared in the transition plan only, not the Annual Report. FY26: absent from both
Resolved. The divergence closed by withdrawal of the label
Each audience score is built from a fixed set of load-bearing criteria, marked before the score is set. "Partial" means the criterion is satisfied only with reader effort that this audience can reasonably spend, not a soft failure. The count matters as well as the score: a score can reach its floor on two failed criteria, so two reports sharing a score may sit some distance apart on the detail below.
#
Audience
Criterion
Verdict
Why
A1
Carbon accounting
No material category excluded
Pass
All 15 Scope 3 categories quantified or given a stated not-relevant basis; Scope 1 and Scope 2 location-based quantified; Category 10, 96.4% of the footprint, quantified with method. Biogenic Scope 1 is named with its reason and is small against 2.75 Mt, so it is a cannot-verify residual rather than an exclusion
A2
Carbon accounting
Single reconcilable footprint
Pass
Categories sum to 275.643 against a published 275.64; Scope 1 disaggregates to 2.69 + 0.05; AR, CTP, sustainability report and data pack agree on every FY26 figure. The "—" versus "0" presentation of C11/C12/C14/C15 is presentational and creates no competing total
A3
Carbon accounting
Method, boundary and version transparency
Not met
Two defects. The market-based Scope 2 figure of 0.53 MtCO₂e is published with no method, no factor source, no residual-mix basis and no contractual-instrument description in any FY26 document, and no Scope 2 entry exists in the pack's Metrics Definitions sheet. The data pack's energy table states TJ against PJ values across the reviewed year and both comparatives
A4
Carbon accounting
Granularity and assurance sufficient to lift
Pass
Per-category tonnes with named factor datasets, response rates and spend shares; consolidated-group and investee split; reasonable assurance on Scope 1 and Scope 2, limited on Scope 3. Estimation method is an improvement note, not a score mover
I1
Institutional investors
Physical risk relevant and transparent (N-04)
Pass
Site-level CMIP6 modelling across four SSPs, severity-weighted expected annual impacts, quantified to US$100–500m from disclosed inputs (0.55 Mt/day, US$91/dmt, ~7 days by 2050), scope limitation stated. Relevance and methodology transparency both satisfied
I2
Institutional investors
Transition risk: derivable target headroom
Not met
Both absolute targets have derivable endpoints and no derivable path. Real Zero: no base period, no interim target, no abatement quantity by lever, a base that rose 15.7% in two years, decline stated to start FY28, and a final equipment milestone at FY31 against a target date whose year-end basis is not stated. Scope 3 2040: no base period, no interim target in the audited statement, no associated gross target, no credit architecture, so the permitted netting over 275.64 Mt is unbounded
I3
Institutional investors
Target achievement: real reductions, honest progress
Not met
Reported progress against the 2030 steelmaking target reverses sign on a baseline restated this year, explained only in the data pack and with no before-and-after values published. This year's intensity movement is a consultant's factor revision and sales mix by the company's own account. Covered Scope 1 and 2 rose 4.6%, and the whole Scope 1 increase is gas
I4
Institutional investors
Portfolio / financed-emissions completeness
Pass
Not a financial institution. Category 15 assessed immaterial, and the 29(a)(iv) disaggregation independently bounds investee operational emissions at 0.06 MtCO₂e across Scope 1 and Scope 2, which supplies the bound the completeness rule would otherwise require
I5
Institutional investors
Flow-through / look-through exposure
Pass
The dominant look-through exposure, customer steelmaking at 268.64 MtCO₂e, is quantified by product type across five destination regions with the process stages included and excluded both stated, and the dependency on customer transition is stated repeatedly. This is the best-quantified part of the disclosure
I6
Institutional investors
Reconstructability by a sophisticated reader
partial (workable)
Action: re-deriving progress against the Steelmaking Target on a single basis. Data: the FY26 target table baseline row and the FY25 ESG Databook baseline row, both published documents. The reader must hold the superseded pack, which is effort a reconstruction-capable reader can spend; the FY25 comparatives are separately available in the voluntary transition plan
R1
Retail investors
Headline matches evidence without cross-document work
partial (workable)
Action: understanding what the Real Zero Target covers. Data: the boundary carried in the target's own words at every substantive mention in the AR, the transition plan, the sustainability report and the glossary, plus the transition plan's statement that Scope 3 is about 90 times Scope 1 and 2 and its "four targets, one emissions footprint" panel. No document states the coverage percentage, so the ~1% figure is arithmetic, but the scale is stated in words
R2
Retail investors
Targets cover material sources; achievement honest
Not met
96.4% of the footprint has no absolute cap before 2040, and the only 2030 lever over it is an intensity target while absolute Category 10 rose 10.6% since the baseline. The achievement limb is mitigated: the AR footnote on the same page states the baseline is not directly comparable, and the emissions increase is stated plainly with its causes
R3
Retail investors
Material risks legible
Pass
Each risk carries a plain description, a time horizon, the financial statement areas affected, the FY26 outturn and a banded financial impact with the modelling inputs shown
The Real Zero boundary is co-located; the emissions rise and its three causes lead the metrics section; the target tables print gross-or-net, SDA derivation and third-party validation status; the steelmaking baseline's non-comparability is footnoted on the same page as the target table; the first-year relief is disclosed in Note 1
P1
Consumers & public
Claims literally true within their implied boundary
Pass
Every claim is a statement of a target, each carrying its own boundary in its own words. No carbon-neutral claim, no renewable-electricity claim, no "1.5°C aligned" self-label, no assertion that any target has been achieved, and no target described as validated
P2
Consumers & public
No greenwashing or misleading composite impression
partial (workable)
Action: judging whether the public claims describe the whole footprint. Data: the boundary in each target's own words, the transition plan's "four targets, one emissions footprint" panel showing 3.13 Mt beside 268.64 Mt, and its statement that Scope 3 is about 90 times Scope 1 and 2. The residual concern is that "Real Zero" is the organising name across the suite and public advocacy while covering about 1% of the footprint, and that the scale ratio sits in the voluntary companion rather than the audited statement or the sustainability report
P3
Consumers & public
Genuine climate action evidenced
Pass
US$848m spent in FY26 within a US$6.2bn program with a further US$680m approved; 550 km of transmission built, 370 MWh of battery storage installed, three solar farms in construction or commissioning, 18 electric excavators and two battery-electric locomotives in service, Eliwana diesel down 10 ML; elimination at source with voluntary offsetting ceased
G1
Regulators
Standards compliance / readiness
Not met
Five paragraph-level gaps in a statement carrying a compliance declaration: 33(e) base period absent for two of four voluntary targets; 33(f) milestones and interim targets absent for all four; 36(c) associated gross target absent for the net Scope 3 target; 36(e) planned carbon-credit use absent for it; and 29(a)(v) contractual-instrument information absent, which sits inside the audited criteria. Against these, the filing is otherwise substantive and properly assured
G2
Regulators
Cross-source / audience consistency
partial (workable)
Action: testing target progress across the sources. Data: the data pack's Note 3 restatement explanation plus the FY25 data pack's baseline row. Every FY26 figure agrees across the four documents; the divergences are the market-based figure appearing in one source, the comparatives appearing in the voluntary plan under a disclosed relief, and the restatement being narrated in one source while three print the new number. The reviewed year's NGER return is not published, so the statutory cross-check is cannot-verify rather than a divergence