Climate Disclosure Watchdog
Decision Useful Diagnosis 022 — CY2025

Newmont Corporation (NYSE: NEM · ASX: NEM CDIs · TSX: NGT · PNGX: NEM)

Not decision-useful for three of five audiences, because the 2030 targets carry no absolute endpoint or pathway, and the filing calls them aspirational and subject to change

Reporting periodCY2025
Review date7 August 2026 (first reviewed 28 July 2026; revised 29 July 2026, 4 August 2026; see Annex L)
ProtocolClimate Disclosure Review Rules v15.23
SectorMining
7 / 15overall score · sum of the five audience ratings, for ranking
8 of 19 load-bearing criteria not met. The score saturates, because a row reaches 1 on two failures and cannot go lower, so the criterion count is reported beside it. The two answer different questions: the score is how many audiences can use the disclosure, the count is how many things are wrong.
This review tests Newmont's publicly available climate disclosure against CRI's Climate Disclosure Review Rules, which use the CRI Net Zero Standard as the reference for a credible claim together with AASB S2 Climate-related Disclosures. It reflects the information available at the review date, states what the evidence supports, what it does not, and what would resolve each open point, and says "cannot verify", not "no issue", where evidence is missing. It is general information, not legal, financial or investment advice, and not an audit or an assurance engagement. It does not allege illegality, misconduct, greenwashing or dishonesty. Organisations may contact CRI at robc@noco2.com.au to identify an error, provide relevant public information or request review of updated disclosures. See Important information at the end of this report.

Decision-usefulness at a glance

CompanyCarbon / supply-chain accountingInstitutional investorsConsumer / retail investorsConsumers & publicRegulators
Newmont Corporation (NYSE: NEM · ASX: NEM CDIs · TSX: NGT · PNGX: NEM)
21112

How to read this report

How to read the ratings

Each audience gets its own rating.

The same disclosure can be reliable for one reader and misleading for another, so we rate decision-usefulness separately for each audience on the three-point scale below. There is no single pass/fail verdict — decision-usefulness is a judgement about each audience, not the report as a whole.

1
Not decision-usefulCannot be relied on in its current form for this reader's decision.
2
Mostly decision usefulUsable, with one material limitation the reader must work around.
3
Decision-usefulCan be relied on. A deliberately high bar.

The bar below adds the five audience ratings into an overall score out of 15. It is used only to rank reports against one another — it carries no band and no verdict label. Its colour simply reflects the mix of the five ratings: the more red, the more audiences the disclosure falls short for.

7 / 15
overall score · for ranking only

This review assesses whether the company's climate disclosure is *decision-useful*, whether a reader can actually rely on it for the decision they are making. Because a disclosure that is sound for one reader can mislead another, we score decision-usefulness separately for each of the main audiences that rely on climate disclosure. The audiences, and what each needs from the disclosure, are the same across all our reviews:

AudienceWhat they rely on the disclosure for
Carbon / supply-chain emissions accountingLifting the company's emissions figures into their own inventory. They need complete category coverage (nothing material excluded), a single reconcilable footprint, and a disclosed, transparent method. Whether a figure is estimated or supplier-specific is a maturity question, not a fault; the fault is exclusion.
Institutional investorsPricing climate risk, physical and transition, including target credibility and whether targets are being met with real reductions, the completeness of financed / portfolio exposure, and flow-through exposure inherited from investees or counterparties whose own emissions may be growing. They can usually reconstruct detail, so they are judged on whether the true position is derivable.
Consumer / retail investorsUnderstanding the company's climate position and target progress without expert reconstruction. They need the headline claims to match the evidence, the material sources to be targeted, and caveats to be easy to find.
Consumers & publicKnowing whether the company's public claims are true, that it is genuinely acting rather than greenwashing, and not fuelling climate change while presenting otherwise. Headline claims matter most to this audience, which is least able to read past a buried caveat.
RegulatorsWhether the disclosure is compliant, consistent across sources and audiences (does the company say one thing to one audience and something else to another), and useful across the board.

The overall score is simply the sum of the five audience ratings (5–15). It has no band and no pass/fail label; we use it only to rank reports against one another; its colour bar reflects the mix of the five ratings (the more red, the more audiences the disclosure falls short for). Beside it we publish the criterion count: the number of the nineteen load-bearing criteria behind the five ratings that are not met. The score saturates and the count does not, so two reports on the same score can differ in how much is wrong. §2.1 gives each audience's rating, its criterion count and the reason behind it; §1 covers scope and basis, §2.2–2.3 the evidence dashboard, §3 what the disclosure means for a reader (what's counted, financed-emissions detail, real-vs-accounting movement, trajectory), §4 the findings, §5 disclosure-risk, §6 how to fix it and §7 the conclusion; the working annexes show the rule-level derivation.

Two conventions apply throughout. A certification (including the Australian Government's Climate Active program) is treated as a claim to be tested, not as a strength in itself. Detailed disclosure and candour about a company's own gaps are the baseline expected of a credible discloser, not a credit.

1. Scope & basis

1.1 What we reviewed

DocumentReviewed?If missing, effect on this review
2025 Annual Report (incl. Form 10-K content), year ended 31 Dec 2025Yes—
2025 Sustainability Report (published April 2026)Yes—
2025 Performance Data Tables (Excel)Yes—
2025 GHG Emissions Calculation Methodology (April 2026)Yes—
Independent limited assurance report, PwC, year ended 31 Dec 2025Yes—
Sustainability Reports 2020, 2021, 2022, 2023, 2024Yes—
Climate Strategy Report 2020; Climate Report 2021; Climate Report 2022YesLast standalone climate report is the 2022 edition; no 2023, 2024 or 2025 equivalent exists
Data tables 2020, 2021, 2022, 2023; 2024 performance dataYes—
2025 Reporting Index (framework index, incl. the claimed climate-framework mapping)Not providedAlignment to the climate framework the report names cannot be checked; treated as cannot-verify
"Comprehensive Climate Risk tables" referenced in the reportNot providedPhysical and transition risk detail, and any financial quantification, cannot be checked
2026 Proxy Statement (executive remuneration)Not providedWhether and how climate performance affects executive pay cannot be checked
Sustainability-Linked Bond Framework and second-party opinion (ISS ESG)Not provided: published by the company but not obtained for this review (AR2025 p.11 confirms both the framework and the second-party opinion, and lists the framework in the reporting suite on the company's website)The bond's precise trigger, observation date and step-up cannot be checked from the filing or the sustainability report; the linkage itself is confirmed in the Annual Report
Australian statutory emissions register (NGER), FY2024-25Yes: public register—

1.2 Standards the company is held to or references

Standard / frameworkReferenced by company?How stronglySector module(s) applied
Corporations Act / Ch 2MNoNot applicable: a US (Delaware) company listed on the ASX through CDIs, not a Chapter 2M reporting entityNot applicable
AASB S2NoNot applicable: for this period, on the same basisNot applicable
ASIC RG 280NoNot applicable: on the same basisNot applicable
GHG Protocol (Corporate / Scope 2 / Scope 3)YesWith reference to: strong; the methodology document states the inventory is prepared consistently with the Corporate Standard, Scope 2 Guidance and the Scope 3 Standard and Technical GuidanceMining
PCAF (financed emissions)NoNot applicable: not a financial institutionNot applicable
SBTiNo: not in the 2025 suite. The 2022 Climate Report stated the targets were approved by SBTi in June 2021 and the Scope 3 targets re-approved in September 2022Not referenced: the 2025 Annual Report still describes the targets as "science-based"; no validation status is stated anywhere in the 2023, 2024 or 2025 disclosuresMining
Climate Active / other carbon-neutral frameworkNoNot applicable: no carbon-neutral certification held or claimed; "carbon neutral by 2050" is stated as an ambition, not a current claimNot applicable
Certificates (GreenPower / LGC / ACCU / REC)Partly: indirectly; power purchase agreements are described at three sitesMentioned: weak; no certificate volumes, retirement records or surrender evidence are disclosedMining
Other (company-referenced)Yes: GRI Standards incl. GRI 14 Mining Sector 2024; SASB Metals & Mining (2023-12); ICMM Mining Principles and Performance Expectations; World Gold Council Responsible Gold Mining Principles; TCFD (2017 version) and its Materials and Buildings supplement; TNFD (2023)In accordance with: GRI and SASB "in accordance with"; the climate framework is named in the reporting-framework list only, with the supporting index not providedMining

Australian regulatory note: Newmont's Australian subsidiaries are registered controlling corporations under the National Greenhouse and Energy Reporting scheme, and the company discloses that its three Australian sites, both Canadian sites and Peñasquito are subject to emissions-limiting regulations covering 44% of group Scope 1. Scheme-specific obligations (for example facility baselines) are not disclosed and were not reviewed.

1.3 Review basis & limitations

This is a standard review: a full, evidence-led assessment of the CY2025 disclosure, with a five-year cross-period comparison built from the company's own restated data tables and its 2020–2024 reports. Emissions figures are taken from the audited-report-first hierarchy, with the Performance Data Tables as the primary numeric source because they carry the only decomposed and multi-year series published.

Three limitations bound the conclusions. First, the reporting index and the climate risk tables the report points readers to were not provided, so the company's claimed alignment to its named climate framework, and its physical and transition risk detail, are recorded as cannot-verify rather than assessed. Second, the proxy statement was not provided, so any link between climate performance and executive pay is untested. Third, external assurance covers the current year only and expressly does not extend to earlier periods, so the five-year series that every trend statement in this review (and in the company's own report) rests on is unassured.

2. Verdict

2.1 Decision-usefulness by audience

2Carbon / supply-chain emissions accounting0 met · 3 partial · 1 not met
You can lift these numbers. The inventory is decomposed by site, by fuel and by Scope 3 category, every one of the fifteen Scope 3 categories carries a stated status, the nine reported categories sum exactly to the disclosed total, Scope 2 is given on both bases, and a published methodology names the emission factor source for every site. What stops it short is the reporting basis rather than the coverage: the Sustainability Report's only Scope 3 chart states a restatement basis that is not the basis of the series it plots, the reason it gives for moving the 2018 and 2019 baselines is one the company's own methodology expressly excludes, and four separate changes to how Scope 3 is calculated across 2024 and 2025 are disclosed without any quantified effect, in the two categories that between them produced the reported movement. So the current-year footprint lifts cleanly and the trend behind it cannot be restated like for like.§3.1, §3.4, §4.2, Annex B
1Institutional investors2 met · 2 partial · 2 not met
The 2030 targets are a performance condition of a US$1bn bond, and the same filing that discloses that linkage tells you they are "aspirational and subject to change", and, of the Scope 3 limb, that "meeting this target should not be projected or relied upon". There is no longer an absolute tonnes endpoint, no pathway, no abatement capital figure and no stated validation status, and one of the three targets has no published baseline at all, so its progress cannot be computed. The reported reduction is mostly lower production and a cleaner grid, not abatement. What holds this row up rather than down is that the true position is derivable: everything in this review was built from Newmont's own data tables.§3.3, §3.4, §4.2, §5
1Consumer / retail investors0 met · 2 partial · 2 not met
The two figures you are given, a 12% reduction and 22% renewable electricity, both point the opposite way to what drives them. The same page does tell you intensity rose because production fell, which is a fair correction and is credited; it then offers a revenue-based intensity that fell because gold prices rose, and it attributes the fall to lower electricity consumption when purchased electricity in fact rose. The dominant driver, a 63% grid-factor effect on flat purchased volumes, is stated nowhere. Separately, one of the three public 2030 targets carries no baseline and no progress statement at all, while the company's own data shows that measure at a five-year worst.§3.3, §3.4, §4.2
1Consumers & public0 met · 1 partial · 2 not met
The public message is a 2050 carbon-neutral ambition supported by a 12% reduction and rising renewable use. Two statements supporting it are contradicted by the company's own data tables: the Scope 3 fall is attributed to processing of sold products, which rose, and the Scope 1 and 2 fall to lower electricity consumption, which also rose. Underneath: the largest single emitting site is contracted to a single named generator whose supply agreement runs to 2031, a year past the 2030 target date; no renewable electricity at all is recorded in the two countries that supply 91% of purchased-power emissions, and emissions per ounce produced are at their highest in five years. Real action is visible and is credited: a signed long-term wind contract for that site, a delivered agreement that took another site's contracted power emissions to zero, and a battery-electric haul fleet in service, but it is small and carries no tonnes, cost or dates.§4.1, §4.2, §5
2Regulators0 met · 1 partial · 1 not met
The statutory position is orderly: the Australian register reconciles with the disclosure once the reporting period and a divested site are allowed for, no mandatory climate-reporting obligation applied to the group for this period, 44% of Scope 1 is identified as falling under emissions-limiting regulation, and a recognised assurance standard has been applied. The exposure is consistency. The statutory filing carries both the strongest claim ("science-based") and the strongest disclaimer, without evidence for the first; and seven further statements inside the company's own reporting suite are contradicted by other documents in the same suite.§2.3, §5.3, Annex J

What the company should fix first: restore an absolute 2030 endpoint in tonnes for each target limb, with the intensity baseline and a costed pathway, and state plainly whether the twice-rebaselined targets remain externally validated.

2.2 Scorecard

Headline claim ↔ evidence match
Disclosure quality7 / 15
Inventory completeness (Scope 1/2/3)
Financed-emissions completeness (if FI)N/A
Target credibility
Real reduction vs accounting movement
Offset / certificate / renewable integrity
Assurance coverage vs claim
Standards / compliance confidence
Comparability (like-for-like only)
Reader accessibility
Evidence limitations
DimensionRatingJustification
Headline claim ↔ evidence match1/5The "science-based" descriptor for the 2030 targets is retained in the statutory filing with no validation evidence in any current document, and the reported progress is driven by production and grid movement rather than abatement.
Disclosure quality7 / 15 overallSite-level, source-level and category-level detail, both Scope 2 bases, a constant-portfolio five-year series and a published methodology naming the emission factor for every site.
Inventory completeness (Scope 1/2/3)3/5Nine Scope 3 categories reported and six assessed out; acknowledged-relevant Category 1 items and all joint-venture Scope 3 are excluded.
Financed-emissions completeness (if FI)N/ANot a financial institution.
Target credibility1/5Percentages only, no endpoint, no pathway, no capital, no intensity baseline, twice rebaselined, unstated validation status, disowned in the filing that also uses them as a bond covenant.
Real reduction vs accounting movement1/5Of the 11.6% fall in Scope 1+2 from 2021 to 2025, roughly 63% is grid emission-factor decline and most of the remainder tracks a 14.2% fall in production; emissions per ounce rose.
Offset / certificate / renewable integrity2/5No offsets are used and none are netted: the reduction is gross. But the "22% renewable" figure is predominantly host-country grid mix, and no certificate volumes or retirement evidence are disclosed.
Assurance coverage vs claim2/5Scope 1, market-based Scope 2 and four Scope 3 categories are assured (60% of Scope 3). The largest Scope 3 category, the Scope 3 total, location-based Scope 2, the intensity metric and the entire five-year series are outside the scope.
Standards / compliance confidence3/5No mandatory climate-reporting obligation applies for the period; GRI and SASB alignment is stated in-accordance; the named climate framework is a retired 2017 version and its index was not provided.
Comparability (like-for-like only)4/5The five-year series is restated to a constant portfolio on a disclosed basis, with per-line footnotes, genuinely comparable within the series, though not to figures published in earlier years.
Reader accessibility1/5Understanding the position requires the Annual Report risk factors, the Sustainability Report, an Excel workbook and a separate methodology PDF, plus derivation the company does not perform.
Evidence limitations3/5Four referenced documents were not provided; the material conclusions do not depend on them.

2.3 Standards & compliance snapshot

AreaRatingBasis
Corporations Act / Ch 2MNot applicable for the periodForeign company listed via CDIs; no Chapter 2M reporting obligation identified.
AASB S2Not applicable for the periodSame basis; the entity is not an Australian reporting entity subject to the standard.
ASIC RG 280Not applicable for the periodSame basis.
GHG Protocol / Scope 2 / Scope 3Appears broadly compliant: minor limitationsMethod, boundary, dual Scope 2 reporting, biogenic separation, recalculation policy and category relevance tests are all documented and applied. Limitations: acknowledged-relevant Category 1 exclusions, and joint-venture Scope 3 excluded from Category 15 on a test whose stated criteria include data availability.
PCAF / financed emissionsNot applicableNot a financial institution.
Carbon-neutral / net-zero frameworkCannot verify: material evidence missingA 2050 carbon-neutral ambition is stated with no pathway, no residual-emissions definition and no neutralisation strategy beyond a statement that limited offsets will be "considered".
Certificates / creditsCannot verify: evidence not providedPower purchase agreements are described qualitatively; no certificate volumes, ownership or retirement records are disclosed, and the Australian renewable-energy data does not reconcile with the agreement described.
Other company-referenced frameworkCannot verify: evidence not providedThe report names the 2017 version of a climate-disclosure framework in its framework list; the supporting index was not provided, and no successor standard is referenced.

3. What this means for a reader

3.1 What is counted / not counted

Basis: operational control, calendar year 2025, twelve operating sites. Offices, exploration sites and legacy sites are excluded as immaterial; joint ventures Newmont does not operate sit in Scope 3 Category 15. Market-based Scope 2 is the primary reporting basis and the target basis. Total reported footprint: 10.04 Mt CO₂-e on the market-based basis (Scope 1+2 4.37 Mt + Scope 3 5.68 Mt), or 9.94 Mt on the location-based basis, which is the basis the composition chart uses. Category figures below are the trailing-series values and sum to the disclosed Scope 3 total.

Emissions composition
Values as reported (tCO₂e). Bars are independent magnitudes, not a stack. Scope 2 is shown on both bases: they measure the same electricity two ways and are alternatives, not additions, so they are never added together.
Source: 2025 Sustainability Report p.73 and the 2025 Performance Data Tables, Energy and Emissions trailing tables (CY2025). Scope 2 is shown on both bases and they are the same electricity measured two ways; here the market-based figure sits above the location-based one, so no market-based benefit is being recorded
Scope 12,259,157
Scope 2 location-based2,007,150
Scope 2 market-basedthe same electricity on the other basis, not an addition2,106,987
Scope 35,677,340
Scope 3 by category (largest first)
Source: 2025 Performance Data Tables, Scope 3 category trailing table (CY2025); 2025 Sustainability Report p.73 for the stated total
C15 Investments (JVs)2,010,000
C1 Purchased goods & services1,516,000
C10 Processing of sold products948,000
C3 Fuel & energy-related848,000
C4 Upstream transport184,000
C2 Capital goods71,000
C7 Employee commuting48,000
C6 Business travel42,000
C5 Waste10,000
What is counted
Every scope and Scope 3 category, coloured by inclusion status. Values as reported. A tile shown in brackets is counted but not additive: it either sits inside another line's total, or it is the same emissions measured on the other Scope 2 basis. The values shown do not add up to the reported total.
Source: 2025 Sustainability Report pp.11 and 73; 2025 Performance Data Tables, Energy and Emissions and site-level Scope 1 and 2 tables; 2025 GHG Emissions Calculation Methodology
Scope 1: combustion / fugitive / fleet2,259,157Reported
Scope 2: electricity (location-based)2,007,150Reported
Scope 2: electricity (market-based)(2,106,987)Same electricity, market-based measure
Scope 3 C1 Purchased goods & services1,516,000Partly counted
Scope 3 C2 Capital goods71,000Reported
Scope 3 C3 Fuel- & energy-related848,000Reported
Scope 3 C4 Upstream transport & distribution184,000Reported
Scope 3 C5 Waste10,000Reported
Scope 3 C6 Business travel42,000Reported
Scope 3 C7 Employee commuting48,000Reported
Scope 3 C8 Upstream leased assetsNot relevant
Scope 3 C9 Downstream transport & distributionNot relevant
Scope 3 C10 Processing of sold products948,000Reported
Scope 3 C11 Use of sold productsNot relevant
Scope 3 C12 End-of-life of sold productsNot relevant
Scope 3 C13 Downstream leased assetsNot relevant
Scope 3 C14 FranchisesNot relevant
Scope 3 C15 Investments / financed & facilitated2,010,000Partly counted
Reported / counted Counted, but not additive: inside another line, or the same emissions on the other Scope 2 basis Partly counted (a figure is given, the category is not complete) Not counted (excluded or unquantified) Not relevant or not applicable
Scope / categoryStatusQuantified (tCO₂e)Material?Note
Scope 1: combustion / fugitive / fleetReported2,259,157YesIncludes contractor fuel combustion at Newmont-controlled facilities. Diesel 1,335,793; heavy fuel oil 678,568; natural gas 150,259; refrigerants 36,069; on-site waste 22,504; process 3,554.
Scope 2: electricity (location-based)Reported2,007,150YesDisclosed but not assured and not the target basis.
Scope 2: electricity (market-based)Reported2,106,987YesHigher than location-based in every year of the five-year series. Australia and Mexico account for 1,917,180 t, 91% of the total.
Scope 3 C1 Purchased goods & servicesPartial1,516,000YesAcknowledged-relevant items excluded on materiality (an estimated 8% of this category), plus further items excluded for data constraints representing up to 10% of purchased-goods spend.
Scope 3 C2 Capital goodsReported71,000YesSpend-based.
Scope 3 C3 Fuel- & energy-relatedReported848,000YesIncludes transmission and distribution losses.
Scope 3 C4 Upstream transport & distributionReported184,000Yes
Scope 3 C5 WasteReported10,000No
Scope 3 C6 Business travelReported42,000No
Scope 3 C7 Employee commutingReported48,000NoFly-in fly-out modelled from straight-line distances and rostered cycles.
Scope 3 C8 Upstream leased assetsNot relevantNot applicableNoNo leased upstream assets.
Scope 3 C9 Downstream transport & distributionNot relevantNot applicableNoNewmont pays for shipping, so these emissions sit in Category 4. Basis accepted.
Scope 3 C10 Processing of sold productsReported948,000YesSmelting and refining of doré and concentrate. Excludes products from non-operated joint ventures.
Scope 3 C11 Use of sold productsExcluded: stated not relevantNot measuredNoReason given is "consistency with industry standards and insufficient data granularity". The industry-standards basis is accepted for gold and base-metal concentrate; the data-granularity basis is a data reason, not a relevance conclusion.
Scope 3 C12 End-of-life of sold productsExcluded: stated not relevantNot measuredNoSame stated reason, same observation.
Scope 3 C13 Downstream leased assetsNot relevantNot applicableNoNo assets leased to others.
Scope 3 C14 FranchisesNot relevantNot applicableNoNo franchised operations.
Scope 3 C15 Investments / financed & facilitatedPartial2,010,000YesEquity share of Scope 1 and 2 for Nevada Gold Mines (38.5%) and Pueblo Viejo (40%). The joint ventures' own Scope 3 is excluded, a treatment the methodology attributes to the GHG Protocol Scope 3 Technical Guidance, supplemented by a relevance and significance test whose stated criteria include data availability. Largest single Scope 3 category (35%) and the only *material* category rising in each of the last two years (C6 business travel and C7 employee commuting also rose in both years, on 0.042 and 0.048 Mt, see Annex K.1).

3.2 Financed-emissions detail (financial institutions)

N/A: not a financial institution.

3.3 Real reduction vs accounting movement

Reference period: 2021 to 2025, on the company's own restated constant-portfolio series (the earliest year for which a decomposed like-for-like series is published). Group production fell 14.2% over the same window, from about 6.78 million to about 5.82 million gold-equivalent ounces, derived from the disclosed energy-intensity rows. No offsets, removals or avoided-emissions credits are netted into any figure; the reductions below are gross.

Scope 1+2 (market-based) reduction, 2021->2025 (-11.6%)
Decomposition of the reported reduction into its drivers.
Source: 2025 Performance Data Tables, Energy and Emissions Scope 1 and 2 trailing tables (2021 to 2025) and the GHG intensity trailing table; review decomposition
7.3 pp
3 pp
1.3 pp
Grid emission-factor decline (BAU) (7.3 pp) Lower production & Scope 1 fuel (3 pp) Contracted renewable electricity (1.3 pp)
Of the 11.6 percentage-point reduction reported, about 1.3 pp is own action beyond business-as-usual; the rest is external / accounting movement.
Reported changeDriverReal-world reduction?
Scope 1+2 (market-based) 4.937 → 4.366 Mt, −11.6% *(company-reported combined figure; decomposed below)*Mixed: composite; see the three rows beneathPartly
Scope 1 2.407 → 2.259 Mt, −6.2%Mixed: diesel −0.094 Mt and heavy fuel oil −0.045 Mt on 14.2% lower production; process emissions −0.068 Mt, part of which follows a change in what is reported (quicklime process emissions reported only through 2023, split not disclosed); natural gas +0.028 Mt and refrigerants +0.024 Mt working against itNo: Scope 1 per ounce produced rose; the absolute fall is smaller than the fall in production
Scope 2 location-based 2.367 → 2.007 Mt, −15.2%Grid factor: grid emission-factor decline. Purchased grid electricity was essentially flat over the period (17.28 → 17.37 million GJ, +0.5%); the implied average grid intensity fell 15.7%No: this is decarbonisation of the grids Newmont buys from, not a reduction in what Newmont uses
Scope 2 market-based 2.530 → 2.107 Mt, −16.7%Mixed: the 1.5 percentage points by which the market-based fall exceeds the location-based fall, about 0.063 Mt, is the contribution of contracted supply. The market-based figure remains above location-based throughoutPartly: marginally; the contractual contribution is real but small, about 11% of the total Scope 1+2 reduction
Emissions intensity 0.73 → 0.75 t CO₂-e per gold-equivalent ounce, +2.7%Activity: production fell faster than emissionsIncrease: this moved in the wrong direction, and 2025 is the highest of the five years
Scope 3 6.324 → 5.677 Mt, −10.2%Mixed: Category 1 −0.473 Mt, of which an undisclosed share follows three separate 2024-effective method changes (capital purchases reclassified to Category 2; "allocation expenditures" excluded; double-counted diesel spend removed); Category 4 −0.091 Mt; against Category 15 rising in each of the last two yearsCannot verify: the method-change share is not quantified
"Renewable energy accounts for 22 percent of our total purchased grid electricity"Grid factor: all 3.89 million GJ of it is in Canada, Peru, Ghana and Argentina, hydro-heavy grids. Zero is recorded in Australia or Mexico, which together produce 91% of market-based Scope 2. The one clear procurement case is Yanacocha, where a power purchase agreement takes market-based Scope 2 to nil against 52,136 t location-basedPartly: largely no; predominantly the renewable share of the grids in the countries Newmont operates in, rather than electricity Newmont procured

Summarised: of the 11.6-point fall in Scope 1+2 across the five years, roughly 7.3 points are grid decarbonisation, 3.0 points track lower production and Scope 1 fuel use, and 1.3 points are contracted renewable supply.

3.4 Trajectory over time

Across six reporting years the emissions series has improved while the disclosure around it has thinned. Absolute Scope 1+2 and Scope 3 are both lower than in 2021 on a constant-portfolio basis, but, as §3.3 sets out, the movement is principally grid and production rather than abatement, and the one metric designed to control for production, emissions intensity, is at its five-year worst. Over the same period the company published its last standalone climate report for 2022, and with it the last quantified 2030 abatement roadmap, the last marginal abatement cost curve, the last internal carbon price, the last absolute tonnes endpoint for either target and the last identification of the joint-venture operator, its own 2030 commitment and the −0.720 Mt of Category 15 abatement the Scope 3 roadmap allocated to it. Nothing has replaced any of them. The 2022 disclosure told a reader the Scope 1+2 target meant 2.40 Mt in 2030 and the Scope 3 target meant 4.00 Mt; the 2025 disclosure gives only "−32%" and "−30%" against baselines that have since been recalculated twice: once for the Newcrest acquisition in 2023 and again in 2025 for the six-site divestment programme. Both recalculations are disclosed and both follow the company's published 5% threshold; the difficulty is that the reader is told "2030 target remains the same" while the tonnage the target implies has moved. The external validation status that was disclosed prominently in 2021 and 2022 has not appeared in any report since, even though the statutory filing still describes the targets as science-based. Restatements within the series are footnoted line by line and the series itself is genuinely like-for-like; it is simply not comparable to the figures published in the years it restates, and it is outside the scope of assurance. The footnoting, however, is not consistent across the suite. The Sustainability Report's only Scope 3 chart states a Telfer-only restatement basis for a series that in fact removes six sites, in a footnote carried over verbatim from the prior year (F-19), and the Sustainability Report gives a reason for the 2025 rebaselining, a greenfield project entering production, that the company's own methodology expressly excludes (F-20).

Metrics over time

Trajectory over time
Reported operational emissions by scope, stacked, in tCO₂e per reporting year.
Source: 2025 Performance Data Tables, Energy and Emissions Scope 1 and Scope 2 trailing tables, 2021 to 2025. Scope 2 is charted market-based, the basis Newmont's headline and its 2030 targets are stated on; the location-based series (2.367 / 2.141 / 1.852 / 1.980 / 2.007 Mt) is in section 3.3, and the two bases measure the same electricity, so they are never stacked together
tCO₂e 0M3M6M9M12M15M 20212022202320242025
Scope 1
Scope 2 (market-based)
Scope 3
MetricCY2021CY2022CY2023CY2024CY2025MovementDriverNote
Scope 1 (MtCO₂e)2.4072.3892.2592.4242.259Down: 6.2%, flat with fluctuationActivity: tracks production (−14.2%); intensity worsenedAviation fuel reclassified 2024; acetylene added 2024; quicklime process emissions reported only through 2023
Scope 2 location-based (MtCO₂e)2.3672.1411.8521.9802.007Down: 15.2%Grid factor: almost entirely grid factor; consumption flatNot assured
Scope 2 market-based (MtCO₂e)2.5302.2671.9772.1572.107Down: 16.7%Mixed: ~15% of the fall is contractual, the rest gridAbove location-based in every year; the target basis
Scope 3 total (MtCO₂e)6.3245.8305.3955.9545.677Down: 10.2%, not monotonicCannot verify: method-change share unquantifiedBy category in Annex K. Three method changes effective 2024; Nevada Gold Mines ounces removed from Category 10 from 2022
Emissions intensity (tCO₂e per gold-equivalent ounce, market-based)0.730.660.730.720.75Up: worsening; five-year highActivity: real deterioration; production fell faster than emissionsRebaselined 2018 intensity baseline not disclosed; progress against the intensity target not stated
Renewable electricity (% of consumption)Not disclosed11%23%21%22%Up: from 11% in CY2022Grid factor: grid mix, not procurementShare of purchased grid electricity. Australia and Mexico record zero throughout
Certificates and offsets retired (MtCO₂e)00000Flat: none in any yearNot applicablePublished as nil. No offsets or removals used or netted in any year

Targets and claims over time

Target or claimAs first stated (period)As stated for CY2025ChangeExplained?Note
Scope 1 and 2 absolute target (−32% by 2030)2018 base 3.57 Mt → 2030 2.40 Mt (CY2022 disclosure)2018 base 5.0 Mt → 2030 endpoint not disclosed (implied ≈3.40 Mt)Rebased: twice (2023 Newcrest; 2025 divestments); percentage held at −32%; tonnage endpoint moved and then withdrawnPartly: both rebaselines disclosed; "2030 target remains the same" stated alongsideAccounting and boundary movement
Scope 1 and 2 intensity target (−32% by 2030)Baseline 0.61 t/kGEO, endpoint 0.41 (CY2022 disclosure)−32%; rebaselined baseline not publishedRebased: twice; endpoint withdrawnNoIntensity at a five-year high; progress cannot be computed (see F-9)
Scope 3 absolute target (−30% by 2030)2019 base → 2030 4.00 Mt (CY2022 disclosure)−30%; endpoint not disclosedRebased; Re-scoped: rebased twice; endpoint withdrawn; Nevada Gold Mines ounces out of Category 10 from 2022Partly: both rebaselines disclosed; the endpoint's withdrawal is not explainedAt −1.6% against −30%
Carbon-neutral / net-zero claim2050 carbon-neutral goal (CY2020 to CY2022)2050 carbon-neutral ambition; targets described as "aspirational"Weakened: language softenedPartly: the "aspirational" descriptor is framed as forward-looking-statement languageSame targets remain a performance condition of a US$1bn bond
External validation of the 2030 targetsApproved by the Science Based Targets initiative in June 2021, Scope 3 limb re-approved September 2022 (CY2021)No validation status stated; "science-based" descriptor retained in the statutory filingWithdrawn: not mentioned since CY2022NoSee F-7
Sustainability-linked bond performance conditionThe 2030 climate targets as a bond KPI (CY2021)UnchangedUnchangedNot applicableUnchanged through both rebaselinings, while the targets were rebased and the language softened (see F-6)

4. Findings

4.1 What stands up (genuine / qualified positives)

▲F-1
Contractor emissions are brought inside Scope 1 and 2. Fuel burned by contractors working at Newmont-controlled facilities is counted as Newmont's direct emissions, not pushed into the supply chain.
Why it matters In mining, contract fleets can be a large share of site diesel. The operational-control test does not compel their inclusion, so this election enlarges the base the 2030 target measures rather than leaving those emissions in the supply chain where no target reaches them.
Qualification (if any) None.
▲F-2
The company reports market-based Scope 2 as its primary and target basis even though that basis produces a higher number than location-based in every year, 2.107 Mt against 2.007 Mt in 2025. At Boddington the market-based factor is supplier-specific to the single named generator under contract (Bluewaters Power Station), adding about 215,000 t against the state grid average.
Why it matters The reported figure reflects the power actually contracted rather than a flattering regional average. At the largest emitting site it also forgoes the benefit of state-grid decarbonisation, because the factor is tied to the generator under contract rather than to a grid mix that others are cleaning up.
Qualification (if any) Applying the market-based hierarchy correctly is expected practice; what is above baseline is reporting on the basis that yields the higher number, and holding to it, at the site where the difference is largest. Note it does not make the percentage target harder to hit, over 2021–2025 the market-based series shows a slightly larger fall than the location-based one. The corpus states the named generator, the supplier-specific factor and the +215,138 t gap against location-based; it does not state the generator's fuel type.
▲F-3
A power purchase agreement at Yanacocha takes that site's market-based Scope 2 to zero against 52,136 t location-based.
Why it matters A clear instance of procurement changing the reported number, distinguishable from grid-mix effects.
Qualification (if any) Small in group terms: about 2.5% of market-based Scope 2. Qualified further: a market-based figure of zero is a strong outcome to rest on a contract whose volumes, certificate ownership and retirement records are not disclosed. That chain is a cannot-verify item in its own right (§4.3).
▲F-4
A long-term renewable power purchase agreement has been signed with Collgar Wind Farm for Boddington, the largest single emitting site, "to supply electricity and green credits".
Why it matters This is a signed contract rather than a study, at the site that matters most: Boddington's purchased power is 682,831 t, three-quarters of its footprint. The express contracting of green credits is the one point in the whole disclosure at which the certificate question is addressed at all.
Qualification (if any) Supply does not begin until 2027 and nothing is in the inventory yet. The stated benefit, "up to 70 percent" of site emissions "over time", is a forward estimate with no basis, timing or volume disclosed, and the credits are not volumised or their retirement described. The Annual Report also discloses that Boddington's existing supply contract with Bluewaters Power "expires in 2031 and includes an option to extend", so the incumbent contract runs past the 2030 target date and the two arrangements overlap for at least four years, on undisclosed proportions (see F-21).
▲F-5
A fleet of 50-tonne battery electric haul trucks is in service at Brucejack and has been for several years, displacing diesel in underground haulage; the company states it is "evaluating opportunities to expand BEV haulage across [the] portfolio".
Why it matters Deployed operating capital in the single largest Scope 1 activity (diesel, 1.336 Mt, 59% of Scope 1), with an operating track record the company reports on, not a study, a pilot or a memorandum. In an underground mine the displacement also cuts ventilation load.
Qualification (if any) Heavily qualified and small. Brucejack's entire Scope 1 is 25,533 t, 1.1% of group Scope 1, so the abatement delivered is immaterial at group level. No tonnage, capital figure, timeline or portfolio expansion commitment is given, and the named strategic haulage-electrification alliance that carried this work in the 2021 and 2022 climate reports has itself disappeared (F-14, P3-9).

4.2 What does not stand up (negatives)

▼F-6
The 2030 emissions targets are a performance condition of a US$1bn sustainability-linked bond whose interest rate steps up if they are missed, one of at least two conditions, alongside a target for the representation of women in senior leadership. The same statutory filing that discloses this describes the climate targets as "aspirational and subject to change" and, of the Scope 3 limb specifically, states that "meeting this target should not be projected or relied upon".
Why it matters to a reader A reader cannot hold both propositions. Either the targets are firm enough to price a bond against, or they are not firm enough to rely on. As drafted, the disclosure gives investors a contractual claim and simultaneously disclaims the basis for it. The bond framework is published: the Annual Report states that "Newmont published a Sustainability-Linked Bond Framework and obtained a second party opinion on the framework from the Institutional Shareholder Services group of companies ESG", and lists it in the reporting suite available on the company's website. It was not obtained for this review (Annex A). The trigger metric, observation date and step-up are not disclosed *in the filing or the sustainability report*, so a reader of the primary disclosures alone cannot tell which limbs bite.
What would fix it Reconcile the two: state the bond's observation date, trigger metric and step-up, and describe the targets consistently in both documents.
▼F-7
The statutory filing describes the 2030 targets as "science-based". The 2022 Climate Report disclosed that they had been approved by the Science Based Targets initiative in June 2021, with the Scope 3 limb re-approved in September 2022. No 2023, 2024 or 2025 document mentions that validation, and the targets have since been rebaselined twice.
Why it matters to a reader "Science-based" is the single strongest quality claim made about these targets. A reader has no way to tell whether it still reflects a live external validation or is a description the company has retained on its own authority.
What would fix it State the current validation status plainly, including whether re-validation was sought after either rebaselining, and if the targets are no longer validated, stop using the term.
▼F-8
No absolute 2030 endpoint is disclosed. The 2022 disclosure gave 2.40 Mt for Scope 1+2 and 4.00 Mt for Scope 3. The 2025 disclosure gives percentages only, against a baseline that moved from 3.57 Mt to 5.0 Mt, while the targets table tells the reader the "2030 target remains the same".
Why it matters to a reader The percentage is unchanged; the tonnage it implies has risen by roughly a megatonne. Both statements are true, and together they leave a reader with no way to track the target in the units emissions are actually measured in.
What would fix it Publish the absolute endpoint in tonnes for each limb alongside the percentage, and show what changed at each rebaselining.
▼F-9
One of the three public 2030 targets, a 32% cut in Scope 1+2 emissions intensity, has no disclosed baseline under the current portfolio and no stated progress. On the company's own restated series, intensity rose from 0.73 to 0.75 t CO₂-e per gold-equivalent ounce and 2025 is the worst of the five years.
Why it matters to a reader The intensity target exists precisely to show whether performance improves independently of how much is produced. It is the limb that would reveal the finding at F-10, and it is the one with no baseline and no progress statement.
What would fix it Disclose the rebaselined 2018 intensity baseline and report progress against it every year, in the public-targets table.
▼F-10
The headline "12 percent reduction from our 2018 baseline" is not principally abatement. Across 2021–2025, absolute Scope 1+2 fell 11.6% while production fell 14.2%; roughly 63% of the fall is grid emission-factor decline, on purchased electricity volumes that were flat.
Why it matters to a reader A reader takes a falling emissions number as evidence the company is decarbonising. Here it mostly reflects producing less and buying from grids that others are cleaning up. Emissions per ounce went up.
What would fix it Present the reduction decomposed, grid factor, production volume, contracted supply, own abatement, as the company already does internally for its roadmap.
▼F-11
"Renewable energy accounts for 22 percent of our total purchased grid electricity" is, on the company's own data, the renewable share of the grids in Canada, Peru, Ghana and Argentina. Australia and Mexico record zero renewable purchased electricity, and those two countries produce 91% of market-based Scope 2.
Why it matters to a reader Presented in a decarbonisation narrative, the figure reads as procurement. It is mostly an attribute of where the mines happen to be, and it is absent from exactly the places where it would matter.
What would fix it Separate procured renewable electricity from grid-mix renewable content, and report the procured share against the emissions it actually abates.
▼F-12
Category 15, the company's equity share of Nevada Gold Mines and Pueblo Viejo, is 2.01 Mt, the largest Scope 3 category at 35%, and the only material category that has risen in each of the last two years (1.820 → 1.971 → 2.010 Mt). (C6 business travel 0.027 → 0.038 → 0.042 Mt and C7 employee commuting 0.039 → 0.041 → 0.048 Mt also rose in both years; neither is material, together 1.6% of Scope 3.) It sits inside the −30% Scope 3 target, is outside the scope of assurance, and is driven by a joint-venture partner's operations that Newmont does not control. The report attributes the rise to "increases in their Scope 1 and 2 emissions".
Why it matters to a reader More than a third of the target base is someone else's emissions, moving the wrong way, with no assurance and no disclosed mechanism for influencing them. The filing concedes the Scope 3 target "is subject to the actions of entities not within our control" but no bridge or fallback is given.
What would fix it Disclose the expected Category 15 trajectory to 2030 under the partners' own commitments, the resulting gap against the −30% target, and what closes it.
▼F-13
The report attributes the 2025 Scope 3 decrease to "changes in product transportation and distribution and downstream processing of sold products". The first limb holds: upstream transport fell 0.274 → 0.184 Mt, about a third of the net decrease. The second does not: processing of sold products rose 0.907 → 0.948 Mt. And the largest driver (purchased goods and services, down 0.196 Mt, 71% of the net decrease) is not named as a driver at all. The very next sentence does mention Category 1: "we continued to improve the accuracy of our Scope 3 reporting by shifting to supplier- and product-specific emission factors, where available, particularly in Categories 1 and 10". That is not an attribution of the decrease; it is an unquantified disclosure that the method changed in 2025 in the two categories that between them account for the entire net movement. It makes the omission worse, not better; see F-23.
Why it matters to a reader Half the stated explanation names a category that moved against the reported result, and the category that actually produced it goes unnamed. That omitted category is also the one carrying three method changes, which is where a reader would most want the explanation.
What would fix it Attribute the movement to the categories that produced it, and quantify how much of the Category 1 fall is method change and how much is real.
▼F-14
The disclosure has thinned materially. The 2022 Climate Report contained a quantified 2030 abatement roadmap with named projects and tonnes, a marginal abatement cost curve, a US$100/t internal carbon price and a framework index. None of these appear in the 2023, 2024 or 2025 reports, and no standalone climate report has been published since. Climate content is now a four-page section.
Why it matters to a reader Everything a reader needs to judge whether the 2030 target is achievable, what the projects are, what they cost, what they deliver, was published once and then withdrawn without explanation or replacement.
What would fix it Reinstate a costed pathway to 2030: projects, tonnes, capital, dates, and the residual gap.
▼F-15
Delivery at the three sites that carry the Scope 2 story is behind. Boddington's replacement supply does not start until 2027 and the incumbent contract runs to 2031 (F-21). In the Cadia bullet the report states that "during 2025, we identified some contractual issues with a few PPAs — related to delays and project economics — prompting a review and update of the site's energy strategy", the problem is stated across an unidentified plural set of agreements, not one site. Tanami remains a study. Together these three sites are 1.94 Mt, 44% of Scope 1+2.
Why it matters to a reader The 2030 target depends on these three projects. Two of the three have slipped or are under review. The report does commit to completing updated energy strategies for Boddington and Cadia in early 2026, but a strategy-refresh date is not a project schedule: no revised tonnage, cost or delivery date is given for any of the three.
What would fix it Give each project a status, a date, an expected tonnage and a variance against the original plan.
▼F-16
The joint ventures' own Scope 3 is excluded from Category 15. The full sentence as printed is: "*Following the Technical Guidance for Calculating Scope 3 Emissions from GHG Protocol*, Scope 3 emissions generated from joint ventures are excluded. Exclusion was determined following a relevancy and significance test that includes criteria of size, influence, business goals, and data availability."
Why it matters to a reader The exclusion is permitted by the standard Newmont reports against, investee Scope 3 is optional under the Scope 3 Technical Guidance, so this is not an accounting-conformance defect. What remains is a decision-usefulness point: nothing in the disclosure lets a reader bound the excluded amount, and on Newmont's own ratio of Scope 3 to Scope 1+2 it is plausibly of the same order as the whole of Category 15 as reported. The "data availability" criterion remains a production constraint rather than a relevance conclusion, but it is a supplementary limb, not the load-bearing basis.
What would fix it Estimate the joint ventures' Scope 3 on the same spend and average-data methods used elsewhere in the inventory, or state the estimated magnitude and why it is immaterial.
▼F-17
Category 1 excludes items the company describes as relevant, an estimated 8% of that category, and under 5% of total Scope 3, on materiality grounds, plus further items excluded for data constraints, representing up to 10% of purchased-goods spend.
Why it matters to a reader Both exclusions are bounded, which is more than many disclosures offer, but on two different denominators, emissions for one, spend for the other, with no combined figure. So the completeness of the largest reported Scope 3 category cannot be established *precisely*, and a reader has to do the conversion themselves to see the ceiling.
What would fix it Quantify both exclusions in tonnes and state the combined effect on the Scope 3 total.
▼F-18
Under the heading "Significant Changes in Reporting Parameters" the report states, in a single sentence: "There were no significant changes in 2025 to the organization's sectors, value chain or other business relationships compared to the previous reporting period", two sentences after stating that restatements are provided "in cases of significant changes in reporting parameters (e.g., mergers, acquisitions, divestments)". This is in a year with six site divestments, a new operation reaching commercial production, and a full baseline recalculation triggered by the portfolio change exceeding the company's 5% materiality threshold. The sentence sits under the broader heading, and six divestments are on any reading a change in business relationships.
Why it matters to a reader Read against the sentence before it and the heading above it, the statement tells a reader nothing changed in a year when the reporting basis was substantially reset.
What would fix it Align the two statements, and cross-reference the rebaselining from the boundary section.
▼F-19
The only Scope 3 chart in the Sustainability Report, "Top Four Emitting Scope 3 Categories: Trailing Five Years", p.75, carries a footnote stating that the trailing years "remove data from Telfer (sold by Newmont on December 4, 2024) only" and fix the former-Newcrest ownership test at "February 14, 2025". The Performance Data Tables footnote to the numerically identical series states the opposite basis: the ownership test is fixed at "December 31, 2025" and "the current year and all trailing years remove six sites (Telfer, CC&V, Musselwhite, Eléonore, Porcupine, and Akyem)". The chart's plotted values (C1 1.894 / 1.781 / 1.712 / 1.516; C15 1.948 / 1.820 / 1.971 / 2.010) match the six-site basis, not the footnote. The Sustainability Report footnote is a verbatim carry-over from the 2024 report, including the February 2025 as-at date.
Why it matters to a reader A reader who takes the flagship narrative document at face value would reconstruct the wrong constant portfolio, and would read a series that removes six sites as one that removes one. This is the same reporting suite, published the same month. It also means that not every restatement in the suite is correctly footnoted (Annex K.2).
What would fix it Update the chart footnote to the actual restatement basis, and date-stamp the ownership test consistently across the suite.
▼F-20
The Sustainability Report explains the 2025 rebaselining as reflecting "the divestment of non-core assets and the commencement of commercial production at Ahafo North", and says the update "aligns with the process in our GHG Emissions Calculation Methodology". The methodology says the opposite: "Organic growth (or decline) or permanent closure of an operation does not trigger recalculation of baseline year data. This includes joint ventures and any greenfield projects that have not operated since the baseline year and then come into operation." The methodology then lists a single 2025 trigger, the six divestitures, and does not mention Ahafo North.
Why it matters to a reader The reader is given a stated reason for a baseline move that the company's own governing document excludes, in the very sentence that claims alignment with that document. The baseline is the denominator of the headline "12 percent reduction" and of the covenanted −32%. Ahafo North also contributed only two months of data in 2025 (commercial production declared late October), so the reason given is doubly hard to reconcile.
What would fix it State which of the two documents governs, and disclose the tonnage effect of each component of the rebaselining separately.
▼F-21
Boddington, the largest single emitting site, 905,944 t and 682,831 t of market-based Scope 2, buys its power under a long-term agreement with a single named generator, and the Annual Report discloses that "the power supply contract with Bluewaters expires in 2031 and includes an option to extend". The Collgar renewable PPA "will commence in 2027". The two arrangements therefore overlap for at least four years, and the incumbent contract runs a year past the 2030 target date. Neither document discloses the split between them, nor whether the Collgar volumes displace Bluewaters volumes or sit alongside them.
Why it matters to a reader The Sustainability Report presents the Collgar PPA as Boddington's future power supply, expected to cut site emissions "by up to 70 percent over time". The Annual Report shows the incumbent contract surviving the entire target period. A reader cannot tell how much of Boddington's supply is actually replaced before 2030, at the site that alone carries 16% of market-based Scope 2.
What would fix it Disclose the contracted volumes under each agreement by year to 2031, and the resulting site Scope 2 pathway.
▼F-22
The 2022 Climate Report disclosed a quantified Category 15 abatement plan: −0.720 Mt of the −1.715 Mt Scope 3 reduction to 2030 was "allocated reductions for NGM and PV (Category 15)", based on the operator's own reporting, and the report named the partner (Barrick), its published commitment (−30% Scope 1+2 by 2030 off a 2018 base, carbon neutral by 2050) and its named projects (fuel switching at the TS Power Plant; renewables at Pueblo Viejo). The 2025 Sustainability Report does not mention the partner at any point, discloses no Category 15 pathway, and reports only that the category "rose due to increases in their Scope 1 and 2 emissions". Against a plan requiring −0.720 Mt, Category 15 has moved +0.190 Mt since 2023.
Why it matters to a reader 42% of the company's only published Scope 3 abatement plan was assigned to a counterparty, and the disclosure that made that assignment checkable has been withdrawn while the target it supports remains a bond performance condition. This is the same disappearance pattern as the SBTi validation (F-7) and the absolute endpoints (F-8): a plan published once and then removed without replacement or explanation.
What would fix it Reinstate the Category 15 trajectory: the partner's current commitment, the allocated reduction, actual against plan since 2019, and the gap.
▼F-23
A further, fourth method change is disclosed for the 2025 inventory, "we continued to improve the accuracy of our Scope 3 reporting by shifting to supplier- and product-specific emission factors, where available, particularly in Categories 1 and 10", with no quantification. Categories 1 and 10 are precisely the two categories that produced the reported 5% Scope 3 decrease (C1 −0.196 Mt; C10 +0.041 Mt), and Category 1 already carries three unquantified method changes effective 2024 (F-28).
Why it matters to a reader The company simultaneously reports a decrease, attributes it to categories that did not produce it (F-13), and discloses an unquantified factor change in the categories that did. On the disclosed information a reader cannot tell whether Category 1's four-year decline is abatement, procurement, or successive changes in how it is calculated. Migration to specific factors is a maturity improvement and is not itself a fault (S3-EST); the fault is that it is unquantified inside a movement the company is claiming credit for.
What would fix it Quantify the 2025 factor-change effect on Categories 1 and 10 separately from the underlying movement, as the GHG Protocol expects for a method change affecting a target-relevant series.
▼F-24
The Performance Data Tables state, in the same worksheet, both that "40% of energy generated at the Lihir site is sold for consumption off-site" (site-level table footnote) and that "Newmont does not currently sell any energy … or electricity to the grid or to other entities, therefore total electricity generated is equal to total electricity consumed" (trailing-table footnote to the series titled *Direct (on-site) electricity generated and consumed*). Lihir generates 7,481,049 GJ on site.
Why it matters to a reader The two footnotes cannot both be right. On the first, roughly 3.0 million GJ, about 6% of the 48.27 million GJ the company reports as energy consumed, is consumed by third parties. That does not change the Scope 1 attribution, which is correct under operational control, but it does mean the energy series and the energy-intensity denominator are not what their labels say, in the worksheet the review and the company both use as the primary numeric source.
What would fix it Reconcile the two footnotes and disclose the exported share as a separate line in the energy tables.

4.3 What cannot be verified

?F-25
Whether the 2030 targets remain externally validated
Why it is open No validation status appears in any 2023, 2024 or 2025 document, and the targets have been rebaselined twice since the last confirmation
What would resolve it A current statement of validation status, with dates
?F-26
The Cadia renewable power purchase agreement
Why it is open The report says Rye Park provides "approximately 40 percent of the site's energy needs", but the data tables record zero renewable purchased grid electricity in Australia, and Cadia's market-based factor is only 8.3% below location-based (0.587 vs 0.640 t/MWh), consistent with roughly 8% renewable content, not 40%. The Boddington bullet in the same list expressly contracts "electricity and green credits"; the Cadia bullet says nothing about credits, so within one paragraph the company distinguishes a credit-bearing PPA from one it does not describe that way, and it is the credit-silent one that fails to appear in the renewable data
What would resolve it Contracted volumes, the certificate treatment (whether Newmont surrenders or on-sells them), and how the agreement is reflected in the market-based factor
?F-27
Progress against the 32% intensity target
Why it is open The rebaselined 2018 intensity baseline is not disclosed anywhere
What would resolve it The baseline value and annual progress
?F-28
How much of the Category 1 decrease is method change
Why it is open Three method changes effective in the 2024 inventory are footnoted, each stated to be individually under 5%, with no quantified effect
What would resolve it The tonnage effect of each change, and the like-for-like movement
?F-29
How much of the Scope 1 process-emissions fall (0.072 → 0.004 Mt) is real
Why it is open A footnote records that quicklime process emissions are "reported through 2023"; the reporting change and any real reduction are not separated
What would resolve it The quicklime emissions for 2024 and 2025 on the former basis
?F-30
Whether climate performance affects executive pay
Why it is open The proxy statement was not provided; the sustainability report refers readers to it
What would resolve it The relevant remuneration disclosure
?F-31
Alignment to the named climate-disclosure framework
Why it is open The report lists the 2017 version of a climate framework among the standards it aligns to, but the supporting index and the climate risk tables were not provided
What would resolve it The reporting index and climate risk tables
?F-32
The magnitude of excluded Scope 3 items
Why it is open Exclusions are bounded on two different denominators and never converted to tonnes
What would resolve it Estimated tonnes for each exclusion
?F-33
The Yanacocha certificate chain
Why it is open The site's market-based Scope 2 is reported as zero against 52,136 t location-based on the strength of a power purchase agreement, but no contracted volume, certificate ownership or retirement record is disclosed. A reported zero is the strongest possible claim to rest on an undisclosed chain
What would resolve it Contracted volumes, and evidence that Newmont holds and retires the associated attributes rather than on-selling them

5. Disclosure risk exposure

5.1 Risk read

The concentration of risk in this disclosure is unusual: it sits almost entirely in the statutory filing rather than the sustainability report. The Annual Report carries the strongest target language, the bond linkage and the strongest disclaimers together (F-6, F-7); the sustainability report, by contrast, makes no science-based or Paris claim at all, reports the numbers plainly and states the rebaselining openly. The single biggest driver of exposure is the gap between the strength of that target language and the absence, anywhere in current disclosure, of the pathway, endpoint, capital and validation evidence that would support it (F-8, F-9, F-14), with a financial instrument priced off the same targets. Confidence in this read is high; it rests on the company's own words in its own filing.

5.2 Risk by lens

Risk exposure by lens
Relative exposure across disclosure-risk lenses; see the table for what drives each and what would reduce it.
Source: Review analysis of the CY2025 disclosure suite
Legal (misleading-conduct / disclosure / director-duty)Moderate to elevatedHigh confidence
Regulatory (securities and consumer regulators; Clean Energy Regulator; climate-reporting standards)ModerateMedium confidence
Technology (dependence on unproven abatement)ModerateMedium confidence
Physical (physical-risk disclosure consistency)Low to moderateLow confidence
Other: commercial / financingElevatedHigh confidence
LensExposureConfidenceWhat drives itWhat would reduce it
Legal (misleading-conduct / disclosure / director-duty)Moderate to elevatedHighA "science-based" descriptor retained in a statutory filing with no current validation evidence (F-7), attached to targets that price a registered public bond (F-6). The filing's words are a past-tense recount: "in 2020 we announced science-based, GHG emissions reduction targets of 32% …", and that recount is accurate as to 2020 (the 2020 Climate Strategy Report and the 2022 Climate Report both record the SBTi approval). A residual exposure remains: the recount is the only place the descriptor now appears, the targets have been rebaselined twice since validation, and nothing in current disclosure tells a reader whether the characterisation still holds.State the validation status; align the target language across the filing and the sustainability report.
Regulatory (securities and consumer regulators; Clean Energy Regulator; climate-reporting standards)ModerateMediumNo mandatory climate-reporting standard applied for this period, and the Australian statutory register reconciles. Exposure comes from naming a retired 2017 framework version with no index provided (F-31), no successor standard referenced, and a public performance claim whose basis is not derivable (F-10, F-11).Move to the current climate-disclosure standard, publish the index, and decompose the reported reduction.
Technology (dependence on unproven abatement)ModerateMediumThe 2030 target depends on three renewable supply projects, of which one starts in 2027, one is under contractual review and one is a study (F-15); the 2050 ambition depends on haul-fleet electrification and, expressly, on offsets that the filing concedes may be in insufficient supply. No costed pathway is published (F-14).Reinstate the costed roadmap with project-level status, tonnes and dates.
Physical (physical-risk disclosure consistency)Low to moderateLowPhysical risk work is described qualitatively and appears active: site climate narratives, water-balance integration, a glacier-adjacent access-road study at Brucejack. But the referenced risk tables were not provided and no financial quantification appears in the reviewed documents, so consistency cannot be tested.Provide the climate risk tables with quantified exposure and timing.
Other: commercial / financingElevatedHighThe bond's interest rate steps up on target failure, and the filing states that "a failure to meet our climate and sustainability targets will result in further expense" (F-6). Current trajectory, 12% against 32%, intensity moving backwards, Scope 3 at 1.6% against 30%, makes that a live financial exposure that is not quantified anywhere.Quantify the step-up exposure and disclose progress against the bond's specific trigger metric.

5.3 Consistency across audiences

Claim / metricTo the regulatorTo investors / publicConsistent after normalising boundary?
Australian Scope 1630,365 t (FY2024-25 statutory register, two controlling corporations)524,582 t (CY2025, three Australian sites)Yes: the gap is explained by the July–June versus calendar year period and by Telfer, divested in December 2024, being inside the statutory year and outside the calendar year
Australian Scope 2 (location-based)1,316,264 t (statutory register)1,264,803 t (CY2025)Yes: within 4% on the same period difference
Target qualityNot a regulator-facing metric"Science-based" in the statutory filing; no such claim in the sustainability report; validation last confirmed in the 2022 climate reportNo: the strongest characterisation appears only in the filing, and only there
Target reliabilityNot a regulator-facing metricBond performance condition (filing); "aspirational and subject to change", "should not be projected or relied upon" (same filing); "2030 target remains the same" (sustainability report)No: three materially different characterisations of the same targets, two of them in the same document
Scope 3 directionNot a regulator-facing metric"Decreased by 5 percent ... driven by ... downstream processing of sold products" (report narrative); processing of sold products rose 0.907 → 0.948 Mt (same company's data tables)No: narrative and data tables disagree on the direction of a named driver
Scope 3 restatement basisNot a regulator-facing metricSR2025 p.75 chart footnote: trailing years "remove data from Telfer … only", ownership test as at 14 Feb 2025, against the Performance Data Tables footnote to the numerically identical series: removes six sites, ownership test as at 31 Dec 2025No: two incompatible constant-portfolio definitions for one identical series; the plotted values follow the six-site basis (F-19)
2025 rebaselining triggerNot a regulator-facing metricSR2025 p.11: divestments "and the commencement of commercial production at Ahafo North", against the GHG Methodology, which says a greenfield project coming into operation "does not trigger recalculation" and lists the six divestitures as the sole 2025 triggerNo: the stated reason is excluded by the company's own governing methodology (F-20)
Boddington power supplyNot a regulator-facing metricAnnual Report: the Bluewaters contract "expires in 2031 and includes an option to extend", against the Sustainability Report, where the Collgar PPA "will commence in 2027 … expected to reduce site emissions by up to 70 percent over time"Yes: not contradictory, but materially incomplete on the sustainability side: the narrative omits that the incumbent contract runs past the target date (F-21)

6. How to fix it

6.1 NoCO2 Standard alignment

FindingReview finding (why it matters)NoCO2 mechanismDocument / clauseRequired evidenceLikely NoCO2 outcome
D6-1 "science-based" retained without current validationThe headline quality claim about the targets has no current supporting evidence in disclosureClaim wording must be accurate, current and not imply an external endorsement that is not held4.9.1.3 Use without a claim; 4.9.1.2 Net Zero Claims; 4.9.2 Metrics & TargetsCurrent validation certificate or a plain statement that the targets are self-determinedNon-conformance until the status is stated
D6-2 targets are a bond covenant and disclaimed in the same filingInvestors price an instrument off targets the issuer says should not be relied uponTarget integrity and consistent public representation4.9.2 Metrics & Targets; 4.9.1 Use of Claims and Statements; 1.1.3Bond framework, trigger metric, observation date, step-upNon-conformance on claim consistency
D6-3 no absolute 2030 endpointThe target cannot be tracked in tonnesA reduction trajectory expressed in absolute terms with a stable base year4.7.4 Accelerated Reduction Timeline; 4.9.2 (base-year consistency); 5.1.11 Reduction Obligation ProgressEndpoint in tonnes per limb; rebaselining reconciliationConformance achievable on disclosure alone
D6-4 intensity limb has no baseline or progressOne of three public targets is untrackableMetrics and targets must carry a stated base year and reported progress4.9.2 Metrics & Targets; 5.1.10 Emissions Tracking; 5.1.11Rebaselined 2018 intensity value and annual progressNon-conformance until disclosed
D6-5 / D3-2 reduction driven by grid factor and lower productionThe performance claim does not survive decompositionProgress reporting must distinguish real abatement from external and volume movement5.1.11 Reduction Obligation Progress; 4.7 Reduction Obligations; 5.1.10 Emissions TrackingGrid-factor / consumption / volume / contractual splitConformance achievable: the data already exists
D6-6 roadmap, cost curve and internal carbon price withdrawnThe 2030 target is unassessablePrescribed interventions with dates, plus an internal cost of carbon4.7.1 Required Interventions (RIS); 4.9.2 (internal cost of carbon); Annex A Illustrative ExamplesProject list, tonnes, capital, datesNon-conformance until a schedule exists
D3-1 market-based basis reports the higher number and is the target basisConservative accounting against the company's own interestMarket versus location-based methodology, applied consistently4.5.5 Methodology (market vs location-based)Already evidenced in the methodology documentConformance
D3-3 "22% renewable" is predominantly grid mixA grid attribute reads as procurementContractual instruments must be disclosed separately from grid content5.1.13 Contractual Instruments for Purchased Energy; 4.5.5Procured volumes by site and certificate treatmentNon-conformance on disclosure presentation
D3-4 Cadia PPA cannot be reconciledThe most prominent procurement claim ties to no reported numberCertificate ownership, volume and retirement disclosure5.1.13 Contractual Instruments for Purchased Energy; 4.5.5Contracted volumes; whether Newmont surrenders or on-sells the certificatesCannot determine until evidence is provided
D3-5 Yanacocha PPAA verifiable procurement effectContractual instrument disclosure5.1.13Certificate chainConformance achievable
D3-6 three renewable projects future-dated, under review or a studyThe mechanism for the 2030 target has no schedulePrescribed interventions with dates and tonnes4.7.1 Required Interventions (RIS)Per-project status, date, tonnage, varianceNon-conformance until scheduled
D2-1 contractor emissions inside Scope 1/2A larger, more complete target base than the minimum requiresOrganisational boundary election4.4 Organisational Boundary; 4.5.1 Emission ScopesAlready evidenced in the methodologyConformance
D2-4 quicklime reporting-basis change unquantified12% of the five-year reduction sits behind a scope changeRestatement transparency in the historical series5.1.10 Emissions Tracking; 4.9.2Quicklime emissions 2024–25 on the former basisNon-conformance until quantified
D2-5 "no significant changes in reporting parameters"Contradicts the adjacent restatement sentenceBoundary and exclusion disclosure5.1.7 Boundary Description; 5.1.10Aligned wordingMinor non-conformance
D4-2 Category 1 exclusions unquantifiedCompleteness of the largest Scope 3 category cannot be establishedCategory coverage against a stated materiality threshold4.5.3 GHG Emission Categories (coverage & materiality); 4.5.4 QuantificationTonnes for each exclusion; combined effectNon-conformance until quantified
D4-3 / D8-4 Category 15 rising, unassured, partner-controlled35% of the Scope 3 target base is outside control and moving the wrong wayInvestment-category attribution, separating what attaches to a net-zero claim4.5.5.8 Investments (cat 15a / 15b); Annex B Net Zero Attribution; 4.5.6 Influence Based InventoryPartner commitments; C15 trajectory to 2030; the resulting gapNon-conformance until the trajectory is disclosed
D4-4 joint-venture Scope 3 excluded on a partly data-driven testA potentially material value-chain block outside the inventoryCategory coverage and investment attribution4.5.5.8 Investments; 4.5.3; Annex BEstimate on the same methods used elsewhere, or a quantified immateriality basisNon-conformance until estimated or quantified
D4-5 Scope 3 narrative contradicts the data tablesThe reader is given the wrong causeAccurate public representation of performance4.9.1 Use of Claims and Statements; 5.1.10 Emissions TrackingCategory-level attribution of the movementNon-conformance on claim accuracy
D4-6 three method changes unquantifiedThe largest Scope 3 movement is not attributableRestatement transparency and data-quality improvement disclosure5.1.10 Emissions Tracking; 5.1.14 Data Quality & Scope 3 Improvement; 4.6Tonnage effect per change; like-for-like restatementNon-conformance until quantified
D4-7 spend-based estimation and the shift to specific factorsMaturity, not faultData-quality ranking and improvement plan4.6 Data Quality; 4.6.4 SSEF Assessment; 5.1.14Data-quality mix by categoryConformance achievable
D5-1 no offsets, removals or netting in any periodReductions are grossAbatement-before-offset principle4.8.1 Abatement Principles; 5.1.12 Carbon Credit ReportingNil-retirement statement (already given)Conformance
D5-2 2050 ambition has no defined residual or neutralisation mechanismThe endpoint has no assessable mechanismResidual definition, removal criteria and permanence4.8.2 CDR Criteria; 4.8.3 Permanence Risk Mitigation; 4.7.5 Net Zero Status Requirements; 4.7.2 Clean Alternative AssessmentResidual definition; credit eligibility criteria; clean-alternative assessmentNon-conformance for a net-zero claim; adequate for a stated ambition
D7-1 / D7-2 assurance excludes the largest Scope 3 category, the total and the whole seriesThe figures most relied on are the least assuredIndependent assurance scope6.1 Assurance Requirements; 6.2 Conformance Requirements; 5.1.10Extended engagement scopeNon-conformance for a net-zero claim
D7-4 remuneration link not verifiableIncentive alignment unknownRoles, responsibilities and accountability4.9.3 Roles & Responsibilities; 4.9.4 Public Reporting & DisclosureThe remuneration disclosureCannot determine
D1-2 retired 2017 framework version named, index not providedFramework alignment unverifiablePublic reporting and disclosure obligations4.9.4 Public Reporting & Disclosure; 5.1 Public Disclosure StatementThe reporting indexCannot determine
D8-1 / D8-2 diesel haulage and off-grid heavy fuel oil have no disclosed pathway89% of Scope 1 has no disclosed abatement routePrescribed interventions and clean-alternative evaluation4.7.1 Required Interventions; 4.7.2 Clean Alternative Assessment; Annex AProgramme status, tonnes, dates, constraintsNon-conformance until scheduled
D8-3 internal carbon price withdrawn after 2022Carbon-cost exposure not quantifiableInternal cost of carbon4.9.2 Metrics & Targets (internal cost of carbon)Current shadow price and sensitivityNon-conformance until reinstated
D9-1 / D9-3 physical risk qualitative; adaptation roadmaps not yet producedPhysical exposure cannot be sizedDisclosure of risk and management approachstandard review item: no direct clause (the Standard addresses mitigation, not physical-risk adaptation)Risk tables with quantified exposure and timingOutside the Standard's scope
D8-5 no coal or petroleum productionPortfolio compositionProhibited activities screen1.1.2 Prohibited ActivitiesAlready evidencedScreen passed

7. Conclusion & next steps

Newmont publishes a detailed account of what it emits and a thin one of what it intends to do about it. The numbers are decomposed by site, by fuel and by category, given on both Scope 2 bases, restated to a constant portfolio and supported by a published methodology; a reader who wants to know what Newmont emitted in 2025 can find out precisely. A reader who wants to know whether Newmont will hit its 2030 targets cannot, because the pathway, the tonnes endpoint, the abatement capital and the validation status that were all published in 2022 have since been withdrawn and not replaced, while the targets themselves remain a performance condition of a US$1bn bond.

The most important thing to fix is the target architecture, and the order matters. Restore the absolute 2030 endpoint in tonnes for each limb, disclose the rebaselined intensity baseline so that the one metric which controls for production can be tracked, and state plainly whether the twice-rebaselined targets remain externally validated. Those three disclosures cost nothing to make and would resolve the largest single gap in the disclosure. Behind them sits the harder work: a costed project-level pathway for Boddington, Cadia and Tanami, a stated position on the third of Scope 3 that belongs to joint-venture partners and is rising, and a decomposition of reported progress that distinguishes grid decarbonisation and lower production from abatement. Until that decomposition is published by the company, a reader is entitled to conclude that most of the 12% has been delivered by others.


Important information

This diagnosis is general information, published to support transparency, accountability and public debate on corporate climate disclosure. It sets out CRI's assessment of the publicly available climate disclosures of the organisation named above, for the reporting period stated, based on third-party information available at the review date. The assessment is made against CRI's Climate Disclosure Review Rules (version stated above), which use the CRI Net Zero Standard as the reference for a credible claim together with AASB S2 Climate-related Disclosures, and it gives reasons for each finding.

It assesses the disclosure, not the organisation's underlying climate performance or intent, and it does not allege illegality, misconduct, greenwashing or dishonesty. It is not tailored advice, nor legal, financial or investment advice, and it is not an audit, an assurance engagement or a certification. CRI does not accept liability for any error or omission in this analysis, or for any loss arising from use of or reliance on it.

AI tools help locate, extract and organise material from the source documents against a fixed rule set. Every rating and conclusion is reviewed and confirmed by CRI analysts; the rules, not the model, determine the outcome.

Organisations may contact CRI at robc@noco2.com.au to identify an error, provide relevant public information or request review of updated disclosures. Where a correction affects a finding, the diagnosis is updated and the change is noted. Further information about the review method is at noco2.com.au.

© Carbon Reduction Institute Pty Ltd, ABN 26 122 969 233. This report is protected by copyright. It reproduces third-party material for the purpose of criticism and review; any reproduction of this report not permitted under the Copyright Act 1968 (Cth) requires CRI's consent.

--- ANNEXES (internal working layer) ---

These annexes are the detailed working layer behind the findings in the body: the evidence base, rule application and traceability. Much of it is review working, retained for transparency and of interest to both the internal review team and external readers who want to see how each finding was reached.

Annex A: Documents reviewed & completeness (A-01A)

DocumentStatusCriticalityNotes
2025 Annual Report (Form 10-K content), YE 31 Dec 2025ReviewedCriticalPrimary audited statutory source. Carries the climate targets, the "science-based" descriptor, the well-below-2°C statement, the sustainability-linked bond disclosure and the climate risk factors.
2025 Sustainability Report (published April 2026)ReviewedCriticalEnergy and Climate Change section pp.72–75 (corrected at rev 1.2 from pp.73–76: verified against the printed folio in the page header of each PDF page); public targets pp.11–12; About This Report pp.99–100.
2025 Performance Data Tables (.xlsx)ReviewedCriticalSheet "Energy and Emissions" (rId10 → sheet10.xml). Only source of the decomposed and trailing five-year series.
2025 GHG Emissions Calculation Methodology (April 2026)ReviewedCriticalBoundary, recalculation policy, offsets position, Scope 2 factor sources by site, Scope 3 category method and relevance tests.
PwC Independent Limited Assurance Report, YE 31 Dec 2025ReviewedCriticalISAE 3000 (Revised) / ISAE 3410. Table 9 defines the assured climate metrics.
2024 Sustainability ReportReviewedMaterialPrior-period baselines and progress statements (5.4 Mt / −7%; 6.3 Mt / +4%).
2023 Sustainability ReportReviewedMaterialFirst year with no SBTi reference; confirms the 2022 Climate Report was the third and last.
2022 Annual Sustainability ReportReviewedMaterialLast year an SBTi validation appears in a sustainability report.
2022 Climate Report (published May 2023)ReviewedCritical for the cross-period moduleLast standalone climate report. Source of the 2.40 Mt / 4.00 Mt endpoints, the 0.61 intensity baseline, the roadmap, the marginal abatement cost curve, the US$100/t shadow price and the SBTi approval dates.
2021 Climate ReportReviewedUsefulSecond climate report.
2020 Climate Strategy Report (file name carries no year)ReviewedUsefulInaugural climate report. Identity confirmed from body text (references the 10-K for YE 31 Dec 2020), not from the cover.
2021 Sustainability Report; 2020 Sustainability ReportReviewedUsefulContext for the earlier series.
Data tables 2020, 2021, 2022, 2023; 2024 performance data (.pdf)ReviewedUsefulCross-checks on the restated series.
NGER register FY2024-25 (public)ReviewedMaterialStatutory Australian Scope 1 / location-based Scope 2 anchor.
2025 Reporting IndexNot providedMaterial, not criticalClaimed climate-framework alignment cannot be checked → F-31.
"Comprehensive Climate Risk tables" (referenced in the report)Not providedMaterial, not criticalPhysical and transition risk detail and any quantification cannot be checked → F-31, §5.2 physical lens.
2026 Proxy StatementNot providedMaterial, not criticalRemuneration link untested → F-30.
Sustainability-Linked Bond Framework + ISS ESG second-party opinionNot providedMaterial, not criticalTrigger metric, observation date and step-up size unknown; the linkage itself is confirmed in the Annual Report.
CDP climate responseNot providedUseful, optionalReferenced in the 2022 Climate Report; not required for the cross-source matrix.

Missing-document effect: no critical document is absent. The four missing items bound §5.2 (physical lens), F-30 and F-31, and prevent quantification of the bond step-up exposure. They do not affect the inventory, target or trajectory findings.

Annex B: Evidence table (AI-02)

Evidence IDSource (doc · page/table)What it showsLinked claim / findingRule IDsStatus
E-01SR2025 p.73"In 2025, our estimated absolute Scope 1 and Scope 2 emissions were 4.4 Mt CO2e, a 12 percent reduction from our 2018 baseline (5.0 Mt CO2e)"C-01 / F-10A-19, G-BAU, T-11Verified
E-02SR2025 p.73"Our Scope 3 emissions were 5.7 Mt CO2e, which is 1.6 percent below our 2019 baseline (5.8 Mt CO2e)"C-02 / F-12T-11, S3-16Verified
E-03SR2025 p.112030 targets: −32% absolute Scope 1+2; −32% Scope 1+2 intensity; −30% absolute Scope 3. Baselines 2018 / 2019C-03 / F-8, F-9T-01, T-14Verified
E-04SR2025 p.11The climate row of the public-targets table contains no progress statement, only the rebaselining note, and states "2030 target remains the same"F-8, F-9T-BASE-01, OUT-TB-06Verified
E-05PD2025 · Energy and Emissions · Scope 1/2 trailing tableScope 1: 2.407 / 2.389 / 2.259 / 2.424 / 2.259 Mt (2021–2025)§3.3, §3.4G-06, S2-26Verified
E-06PD2025 · same tableScope 2 market-based 2.530 / 2.267 / 1.977 / 2.157 / 2.107 Mt; location-based 2.367 / 2.141 / 1.852 / 1.980 / 2.007 Mt§3.3, F-2G-07, S2-28Verified
E-07PD2025 · indirect energy trailing tablePurchased grid electricity 17.28 → 17.37 million GJ (2021→2025), +0.5%F-10A-19, G-BAUVerified: derived
E-08PD2025 · energy-intensity trailing tableEnergy/GEO 7.31 → 8.30; total energy 49.55 → 48.27 million GJ ⇒ production 6.78 M → 5.82 M GEO, −14.2%F-10A-19, T-14Verified: derived
E-09PD2025 · GHG intensity trailing tableScope 1 + market-based Scope 2 intensity 0.73 / 0.66 / 0.73 / 0.72 / 0.75 t CO₂-e per GEOF-9T-14, T-11Verified
E-10PD2025 · site-level Scope 1/2 tableBoddington market-based Scope 2 682,831 t vs location-based 467,693 tF-2, F-15S2-28, E-01Verified
E-11GHG Methodology p.7, Table 2Boddington market-based factor: "Supplier specific, Bluewaters Power Station"; Cadia: NGER Determination factors, market-based method; Yanacocha: "Based on PPA"F-2, F-3, F-26E-05, S2-28Verified
E-12PD2025 · site-level energy tableAustralia purchased grid electricity: 7,851,133 GJ non-renewable, 0 GJ renewableF-11, F-26E-24, G-07Verified
E-13PD2025 · indirect energy trailing tableRenewable share of purchased grid electricity 22% (2025), 21% (2024); by country Canada 1,833,568 + Peru 1,011,263 + Ghana 694,259 + Argentina 352,809 GJF-11E-24, A-19Verified
E-14SR2025 p.73"Cadia: Rye Park Wind Farm PPA began commercial operation in the second half of 2024, providing approximately 40 percent of the site's energy needs. During 2025, we identified some contractual issues with a few PPAs — related to delays and project economics"F-26, F-15E-24, T-DEP-04Conflicts with E-12
E-15SR2025 p.73"Boddington: We signed a long-term renewable PPA with Collgar Wind Farm Pty Ltd ... commence in 2027 ... expected to reduce site emissions by up to 70 percent over time"; "Tanami: ... continued to progress the Tanami energy study"F-4, F-15T-DEP-04, E-24Verified
E-16PD2025 · Scope 3 category trailing tableC1 1.989→1.516; C2 0.073→0.071; C3 0.814→0.848; C4 0.275→0.184; C5 0.045→0.010; C6 0.003→0.042; C7 0.039→0.048; C10 0.971→0.948; C15 2.115→2.010; total 6.324→5.677 Mt§3.1, §3.4, F-12, F-13S3-01, S3-16Verified
E-17PD2025 · Scope 3 footnote 3 / GHG Methodology p.9Relevant Category 1 items excluded on materiality "constitute less than 5% of total Scope 3" and "account for an estimated 8% of Scope 3, Category 1 emissions"; further items excluded for data constraints representing "less than 10% of the total spend on purchased goods and services"F-17, F-32G-19, S3-26, OUT-STK-13, A-16Verified
E-18PD2025 · footnotes 4, 5, 6Three method changes effective in the 2024 inventory: capital purchases reclassified C1→C2; "allocation expenditures" excluded; double-counted diesel spend removedF-13, F-28G-10, GHG-STD-08Verified
E-19SR2025 p.74"Our Scope 3 emissions decreased by 5 percent from 2024, driven by changes in product transportation and distribution and downstream processing of sold products"F-13A-01B, DR-02, OUT-TB-05Contradicted by E-16 (C10 rose)
E-20GHG Methodology p.15Category 15: equity share of joint-venture Scope 1 and 2 only; "Following the Technical Guidance for Calculating Scope 3 Emissions from GHG Protocol, Scope 3 emissions generated from joint ventures are excluded. Exclusion was determined following a relevancy and significance test that includes criteria of size, influence, business goals, and data availability." Also: "All other equity investments do not meet the materiality threshold on both quantitative (i.e., emissions size) and qualitative (i.e., ability to influence) factors." Investments: Pueblo Viejo 40%, Nevada Gold Mines 38.5%. *(Quotation completed at rev 1.2, the opening framing clause was omitted from revisions 1.0 and 1.1.)*F-16S3-14, S3-25, S3-26, OUT-STK-13, SEC-INV-LT-17Verified
E-21SR2025 p.74"Emissions from our joint venture partner (Category 15) rose due to increases in their Scope 1 and 2 emissions"F-12SEC-INV-LT-17, T-INV-01, T-DEP-04Verified
E-22Assurance report, Table 9Assured: Scope 1 2.259; Scope 2 market-based 2.107; Scope 3 C1 1.516, C2 0.071, C3 0.848, C10 0.948; total energy 48.27. Not assured: location-based Scope 2, C4/C5/C6/C7, C15, the Scope 3 total, the intensity metricF-12, §2.2GOV-03, GOV-16, S3A-06, OUT-STK-13Verified
E-23Assurance report"Our assurance conclusion ... does not extend to information in respect of earlier periods"§1.3, §3.4GOV-03, S3A-06, YOY-01Verified
E-24AR2025 p.10"in 2020 we announced science-based, GHG emissions reduction targets of 32% for Scope 1 and Scope 2 and 30% for Scope 3 by 2030 ... with an ultimate ambition of being carbon neutral by 2050"C-04 / F-7T-SBTi-01, T-SBTi-03, C-SBTi-02Verified
E-25AR2025 pp.10–11"Investors are reminded that climate-related targets are subject to aspirational management goals ... meeting this target should not be projected or relied upon"F-6A-17, T-13, DR-01Verified
E-26AR2025 p.11"In December 2021, Newmont became the first in the mining industry to issue a sustainability-linked bond, with the registered public offering of $1 billion aggregate principal amount of 2.6% Sustainability-Linked Senior Notes due 2032 ... with the coupon linked to Newmont's performance against key ESG goals regarding 2030 climate targets"F-6A-11, GOV-06Verified
E-27AR2025 risk factors"the interest rate of Newmont's $1 billion ... is linked to Newmont's performance against certain ESG commitments regarding 2030 emissions reduction targets and the representation of women in senior leadership roles target ... a failure to meet our climate and sustainability targets will result in further expense": the climate targets are one of at least two KPIsF-6, §5.2A-11, GOV-06, DR-03Verified
E-28AR2025 risk factors"our climate-related targets are aspirational and subject to change ... Additional rebaselining was required to reflect Newmont's portfolio following the sale of non-core operating assets in 2025, and may be required again in the future"F-6, F-8T-BASE-01, S2-41, A-18Verified
E-29AR2025 risk factors"Newmont supports the UNFCC goal of limiting global warming to 'well below 2°C' ... and plans to transition its operations to meet this goal by 2030, with an aspiration of carbon neutrality by 2050"F-7, A-17T-SBTi-01, C-SBTi-02Verified
E-30AR2025 risk factors"We will also consider the limited use of carbon neutralization or offsets in the future for hard to abate emissions to assist in meeting our 2050 carbon neutral ambition, and there may be an insufficient supply of offsets"§2.3, §5.2E-08, G-11Verified
E-31CR2022 p.28"Our 2030 GHG emissions reduction targets align with the SBTi's science-based criteria ... In June 2021, we received approval for our targets from SBTi ... We resubmitted our Scope 3 targets to SBTi, and they were approved in September 2022"F-7, F-25T-SBTi-03, SEC-SF-11Verified
E-32CR2022 p.292030 targets in absolute terms: Scope 1+2 base 3.57 Mt → 2.40 Mt; intensity 0.61 → 0.41 t/kGEO; Scope 3 base 5.72 Mt → 4.00 MtF-8, F-9T-BASE-01, YOY-06Verified
E-33CR2022 pp.30–33Quantified 2030 Scope 1+2 reduction roadmap by project (Boddington −0.900 Mt and others); marginal abatement cost curve; US$100/t internal shadow carbon priceF-14SEC-SF-11, T-08, YOY-05Verified: absent from 2023–2025
E-34SR2023 p.99"In May 2023, we published our third annual Climate Report"F-14SEC-SF-11Verified: no fourth
E-35Keyword sweep across SR2022 / SR2023 / SR2024 / SR2025 / AR2025SBTi mentions: 10 / 0 / 0 (climate) / 0 / 0F-7, F-25SEC-SF-11, T-SBTi-03Verified
E-36SR2024 p.71"our estimated absolute Scope 1 and Scope 2 emissions were 5.0 Mt CO2e, a 7 percent reduction from our 2018 baseline (5.4 Mt CO2e). Our Scope 3 emissions were 6.6 Mt CO2e, which is 4 percent above our 2019 baseline (6.3 Mt CO2e)"§3.4, P.2YOY-04, T-BASE-01Verified
E-37GHG Methodology p.3"Currently, Newmont does not account for any carbon offsets or neutralization projects in the global GHG emissions reporting"; "Currently, Newmont does not have GHG removals to calculate and report on"§3.3, §2.2G-11, E-08Verified
E-38GHG Methodology p.2"Newmont calculates GHG emissions for facilities under its operational control and includes the emissions from contractors working at these facilities within Scope 1 and Scope 2"F-1G-06, GHG-STD-03Verified
E-39GHG Methodology p.2Recalculation triggered at ±>5% per scope; baseline recalculated in 2025 for the divestiture of Akyem, CC&V, Éléonore, Musselwhite, Porcupine and Telfer; the Newcrest acquisition triggered the 2023 recalculationF-8, §3.4G-10, T-BASE-01Verified
E-40PD2025 · trailing-table footnote 1Trailing years include former Newcrest assets for full calendar years and remove the six divested sites from every year: constant-portfolio restatement§3.4, §2.2G-10, YOY-04, OUT-TB-08Verified
E-41PD2025 · emissions-limiting regulations table986,185 t of Scope 1 (44%) at Boddington, Cadia, Tanami, Brucejack, Red Chris and Peñasquito is subject to emissions-limiting regulation§1.2, §5.2SEC-MIN-01, SEC-MIN-11, DR-04Verified
E-42NGER register FY2024-25Newmont Australia Pty Ltd: Scope 1 425,733 t, Scope 2 (LB) 479,673 t, net energy 10,365,848 GJ. Newmont International Holdings Pty Ltd: Scope 1 204,633 t, Scope 2 (LB) 836,591 t, net energy 7,865,081 GJ§5.3, O.2A-01C, DR-02Verified
E-43SR2025 pp.99–100Framework list includes "TCFD (2017 version)"; no ISSB or IFRS S2 reference; GRI and SASB stated in-accordance; the reporting index was not providedF-31, §5.2A-01A, A-05, OUT-02Verified
E-44SR2025 p.100"There were no significant changes in 2025 to the organization's sectors, value chain or other business relationships compared to the previous reporting period", two sentences after "Restatements will also be provided in cases of significant changes in reporting parameters (e.g., mergers, acquisitions, divestments)"F-18G-10, OUT-TB-06Verified
E-45GHG Methodology p.9, Table 3Categories 11 and 12 excluded "not relevant for consistency with industry standards and insufficient data granularity"; C8, C9, C13, C14 excluded on substantive grounds§3.1G-17, G-18, S3A-04Verified
E-46SR2025 p.72"supported by our 2030 aspirational greenhouse gas (GHG) reduction targets and our ambition to become carbon neutral by 2050"; the decarbonisation pillar includes "carbon offsetting strategies"§3.4, F-6S2-41, A-18, T-13Verified
E-47SR2025 p.73"Our 2025 energy and emissions intensities increased on a gold equivalent ounce (GEO) basis compared to 2024 due a reduction in overall production, but decreased on a revenue basis due to elevated gold prices"F-9, F-10T-14, OUT-TB-05, A-19Verified
E-48PD2025 · site-level Scope 1/2Boddington 905,944 t, Cadia 808,523 t, Tanami 223,760 t = 1,938,227 t (44% of Scope 1+2); Peñasquito 853,947 t; Lihir 712,141 tF-15, F-11G-06, SEC-MIN-01, SEC-MIN-02Verified
E-49PD2025 · Scope 1 trailing footnote 7"Process emissions include emissions generated from autoclave operations. Additional process emissions from quicklime production are reported through 2023": process emissions 0.072 (2021) → 0.004 Mt (2025)F-29G-10, GHG-STD-08Verified
E-50SR2025 p.6Board Safety and Sustainability Committee chair: the company "completed a re-baselining of its greenhouse gas (GHG) emissions to reflect the changes to our portfolio. This provided an updated view on progress towards toward its aspirational 2030 GHG emission reduction targets"§3.4, F-8GOV-01, T-BASE-01Verified
E-51PD2025 · direct energy trailing tableDiesel energy 19.60 → 18.21 million GJ (2021→2025, −7.1%); diesel emissions 1.430 → 1.336 Mt (−6.6%) against production −14.2%D8-1G-06, SEC-MIN-02, SEC-MIN-04Verified
E-52PD2025 · on-site generation tableLihir heavy fuel oil 7,382,630 GJ; footnote: "40% of energy generated at the Lihir site is sold for consumption off-site"D8-2G-06, SEC-MIN-04, SEC-MIN-09Verified
E-53AR2025 p.11"In connection with the issuance of the Notes, Newmont published a Sustainability-Linked Bond Framework and obtained a second party opinion on the framework from the Institutional Shareholder Services group of companies ESG"; AR2025 p.10 lists the framework in the reporting suite "found on our website"F-6 (withdrawal), Annex AA-11, GOV-06, A-05Verified: added rev 1.2
E-54AR2025 p.56 (Boddington property description)"Power for the operation is sourced through the local power grid under a long-term power purchase agreement with Bluewaters Power. The power supply contract with Bluewaters expires in 2031 and includes an option to extend." No fuel type is stated for Bluewaters anywhere in the reviewed corpusF-21, F-2, F-4T-DEP-04, S2-28, A-05Verified: added rev 1.2
E-55SR2025 p.75, chart footnote 2 · versus PD2025 trailing-table footnote 1SR: trailing years "remove data from Telfer (sold by Newmont on December 4, 2024) only", ownership test as at 14 February 2025. PD: "remove six sites (Telfer, CC&V, Musselwhite, Eléonore, Porcupine, and Akyem)", ownership test as at 31 December 2025. The SR footnote is verbatim identical to SR2024 footnote 2 (p.71); the SR chart's plotted values match the six-site basisF-19, P2-10G-10, DR-02, YOY-04, OUT-TB-08Verified: added rev 1.2
E-56SR2025 p.11 · versus GHG Methodology pp.2–3SR: "we updated our baseline to reflect our portfolio following the divestment of non-core assets and the commencement of commercial production at Ahafo North. This update aligns with the process in our GHG Emissions Calculation Methodology". Methodology: "Organic growth (or decline) or permanent closure of an operation does not trigger recalculation of baseline year data. This includes … any greenfield projects that have not operated since the baseline year and then come into operation", followed by a single 2025 trigger, the six divestituresF-20G-10, T-BASE-01, DR-02Verified: added rev 1.2
E-57CR2022 p.36"In 2022, we continued to engage with Barrick (the operator of our joint ventures whose emissions are considered Category 15) … Barrick has publicly committed to reducing Scope 1 and 2 emissions by 30 percent by 2030 (2018 baseline year) and to be carbon neutral by 2050. Barrick has begun … fuel switching at the TS Power Plant at Nevada Gold Mines and renewables at the Pueblo Viejo mine". Scope 3 roadmap: SBTI 2019 baseline 5.716 → −0.720 "Allocated reductions for NGM and PV (Category 15)" → −0.411 supplier committed → −0.584 "to be developed" → 2030 target 4.0 MtF-22, D8-4, K-10SEC-INV-LT-17, T-INV-01, YOY-05, A-05Verified: added rev 1.2. Zero mentions of the partner in SR2025
E-58SR2023, "Our Targets" introduction"Most of our public sustainability targets are annual. The exceptions are our long-term goals related to female representation and science-based climate targets"P5-1T-SBTi-03, DR-02Verified: added rev 1.2
E-59SR2025 p.74"We continued to improve the accuracy of our Scope 3 reporting by shifting to supplier- and product-specific emission factors, where available, particularly in Categories 1 and 10": the sentence immediately following the Scope 3 decrease attributionF-23, F-13, F-28G-10, S3-EST, GHG-STD-08Verified: added rev 1.2
E-60PD2025 · Energy and Emissions, two footnotes in the same worksheetSite-level on-site generation footnote 1: "40% of energy generated at the Lihir site is sold for consumption off-site." Trailing on-site generation footnote 2: "Newmont does not currently sell any energy … or electricity to the grid or to other entities, therefore total electricity generated is equal to total electricity consumed"F-24G-06, DR-02, OUT-TB-08Verified: added rev 1.2. Lihir on-site generation 7,481,049 GJ
E-61PD2025 · Scope 3 category trailing tableC6 business travel 0.003 / 0.015 / 0.027 / 0.038 / 0.042 and C7 employee commuting 0.039 / 0.038 / 0.039 / 0.041 / 0.048: both rose in 2024 and again in 2025, as did C15F-12 (correction), §3.1S3-01, AI-20Verified: added rev 1.2
E-62SR2025 p.73, PPA bulletsBoddington: PPA "with Collgar Wind Farm Pty Ltd to supply electricity and green credits that will commence in 2027". Cadia: "During 2025, we identified some contractual issues with a few PPAs — related to delays and project economics — prompting a review and update of the site's energy strategy"F-4, F-26, F-15E-24, T-DEP-04Verified: added rev 1.2
E-63SR2025, "Our Stories" feature facing p.25, and p.73"Newmont invested in a fleet of 50-tonne battery electric vehicle (BEV) haul trucks at its Brucejack operation. After several years in operation, the fleet has demonstrated that electrified haulage can reliably support underground mining while materially reducing emissions … Newmont is evaluating opportunities to expand BEV haulage across its portfolio". Separately: an Energy Management System "with a pilot planned for 2026", expected to cut energy use "by 2 to 5 percent". Brucejack Scope 1 = 25,533 t (1.1% of group Scope 1). Zero mentions of the named 2021–22 haulage alliance in SR2025F-5, D8-1 (correction), O-6SEC-MIN-02, T-08, A-16Verified: added rev 1.2

Annex C: Claim register (AI-18 / OUT-TB-15)

Claim IDWording / paraphraseClaim objectClaim source & basis (OUT-TB-15)Doc & locationStrengthAudienceEvidence req/found/missingTriggered scansRule IDsStatus
C-01"a 12 percent reduction from our 2018 baseline (5.0 Mt CO2e)"Absolute Scope 1 + market-based Scope 2, operational control, twelve sites, rebaselined portfolioSelf-declared; the current-year components are limited-assured, the baseline and the percentage are notSR2025 p.73Strong (quantified performance claim)AllRequired: decomposition of the movement. Found: full five-year series. Missing: any company decompositionTarget progress; BAU counterfactual; scope decomposition; restatementT-11, A-19, G-BAU, G-10Arithmetically supported; not supported as abatement: F-10
C-02"Scope 3 emissions were 5.7 Mt CO2e, which is 1.6 percent below our 2019 baseline"Total Scope 3 across nine reported categoriesSelf-declared; the total is outside the assurance scopeSR2025 p.73StrongInstitutional, accountingRequired: category completeness and assurance. Found: category table. Missing: quantified exclusionsScope 3 coverage; assurance scope; investmentsS3-01, S3-16, OUT-STK-13Qualified: completeness not confirmable
C-032030 targets: −32% absolute Scope 1+2, −32% Scope 1+2 intensity, −30% absolute Scope 3Group emissions against 2018 / 2019 baselinesSelf-declared; externally validated 2021/2022, status now unstatedSR2025 p.11; AR2025 p.10StrongAllRequired: endpoint, pathway, baseline per limb. Found: percentages onlyTarget boundary; baseline reconciliation; external dependencyT-01, T-14, T-BASE-01, T-DEP-04Decision-usefulness concern: F-8, F-9
C-04"science-based, GHG emissions reduction targets"Target quality / methodological pedigreeStatutory filing, self-declared; last external confirmation September 2022AR2025 p.10Very strong (headline quality claim)AllRequired: current validation. Found: 2021/2022 approval only. Missing: current statusValidated-vs-claimed gap; framework haloT-SBTi-01, T-SBTi-03, C-SBTi-02Unsubstantiated in current disclosure: sets the A-17 ceiling
C-05"supports the UNFCC goal of limiting global warming to 'well below 2°C' ... and plans to transition its operations to meet this goal by 2030"Pathway alignment of the whole operationStatutory filing, self-declaredAR2025 risk factorsVery strongInstitutional, publicRequired: pathway, endpoint, capital. Missing: all three since 2022Paris-alignment; transition planT-SBTi-01, T-08, C-SBTi-02Unsubstantiated: no pathway in current disclosure
C-06"ambition to become carbon neutral by 2050"Group net position in 2050Self-declared ambition; not a certification and not a present claimSR2025 p.73; AR2025 p.10Moderate (forward ambition, correctly framed)Public, retailRequired: residual definition, neutralisation strategy. Missing: bothNet-zero scan; offsets; residual emissionsG-11, E-08, T-05Cannot verify: no pathway; correctly labelled an ambition
C-07"Renewable energy accounts for 22 percent of our total purchased grid electricity, an increase from 21 percent in 2024"Renewable share of purchased electricitySelf-declared; outside the assurance scopeSR2025 p.73ModeratePublic, retailRequired: procured versus grid-mix split. Found: the country split answers itCertificate chain; market versus location; BAUE-24, G-07, A-19Arithmetically correct; materially misleading in context: F-11
C-08"Cadia: Rye Park Wind Farm PPA ... providing approximately 40 percent of the site's energy needs"Site renewable supplySelf-declared narrativeSR2025 p.73ModeratePublic, institutionalRequired: volumes, certificate fate. Found: a contradicting data-table entryCertificate chain; ownership; retirementE-24, E-05, G-07Cannot verify: conflicts with E-12 and with the site's own market-based factor
C-09"Boddington ... expected to reduce site emissions by up to 70 percent over time"Future site emissionsSelf-declared forward estimateSR2025 p.73Moderate ("up to", "over time")InstitutionalRequired: basis, volume, date. Missing: all threeTransition plan; delivery riskT-08, T-DEP-04Cannot verify: unquantified forward estimate
C-10"2030 target remains the same"Continuity of the target across the rebaseliningSelf-declaredSR2025 p.11ModerateAllRequired: like-for-like endpoint comparison. Found: 2022 endpoint 2.40 Mt versus implied ≈3.40 MtBaseline reconciliationT-BASE-01, G-10, YOY-06True as a percentage, misleading as to tonnage: F-8
C-11"the coupon [is] linked to Newmont's performance against key ESG goals regarding 2030 climate targets"Financial instrument termsStatutory filingAR2025 p.11StrongInstitutionalRequired: trigger, observation date, step-up. Missing: framework not providedClimate-linked financeA-11, GOV-06Existence verified; terms not provided
C-12"climate-related targets are aspirational and subject to change ... meeting this target should not be projected or relied upon"Reliability of C-03Statutory filingAR2025 pp.10–11Strong disclaimerInstitutional—Escalates to C-03, C-04, C-11A-17, T-13, DR-01Verified: irreconcilable with C-11, see F-6
C-13"Scope 3 emissions decreased by 5 percent from 2024, driven by changes in product transportation and distribution and downstream processing of sold products"Attribution of the Scope 3 movementSelf-declared narrativeSR2025 p.74ModerateAccounting, institutionalRequired: category-level attribution. Found: the data table contradicts itScope 3 category scan; reconciliationS3-16, A-01B, DR-02Contradicted by the company's own data: F-13
C-14"no significant changes in 2025 to the organization's sectors, value chain or other business relationships", under the heading "Significant Changes in Reporting Parameters" *(quotation corrected rev 1.2)*Reporting-basis continuitySelf-declared, GRI framingSR2025 p.100ModerateAccounting, regulatorsRequired: consistency with the rebaselining disclosureRestatement; boundaryG-10, OUT-TB-06Minor limitation: F-18
C-15Categories 8, 9, 11, 12, 13, 14 "assessed and deemed as not relevant ... based on the relevance test set out within the GHG Protocol"Scope 3 boundarySelf-declared, methodology-documentedSR2025 p.74; Methodology Table 3ModerateAccountingRequired: basis per category. Found: substantive for C8/C9/C13/C14; partly data-based for C11/C12Scope 3 completenessG-18, S3A-04, OUT-STK-13Largely accepted; the C11/C12 basis is partly a data reason
C-16"Renewable energy ... an increase from 21 percent in 2024" together with "Our Scope 1 and 2 absolute GHG emissions decreased by 4.7 percent compared to 2024, driven by reductions in diesel and electricity consumption"Cause of the year-on-year fallSelf-declared narrativeSR2025 p.73ModerateRetail, publicRequired: consumption evidence. Found: grid electricity rose 17.06 → 17.37 million GJ in 2025BAU counterfactual; Scope 2 decompositionA-19, G-BAU, G-07Diesel consumption did fall; electricity consumption rose: the attribution is half-supported

Annex D: Detailed findings, two-track (A-03)

D.1 Applicability gate & AASB S2 readiness (Sections 04–05)

IDFinding & evidence chainMin-complianceDecision-usefulness / claim-qualitySeverity · ConfidenceConsequenceWhat would fix it
D1-1Newmont Corporation is a Delaware company listed on the NYSE with ASX CDIs, TSX and PNGX listings. It is not a Chapter 2M reporting entity, so AASB S2, RG 280 and the Australian mandatory climate-reporting regime do not apply to the group parent for CY2025 (E-43)No apparent issue: not applicable for the periodNo credit either way. The absence of an obligation does not lower the standard applied to the voluntary claims actually madeNo apparent issue · HighNone—
D1-1bControlled-entity threshold limb, not determined. L-02 requires the applicability test to be run on each threshold limb *including NGER reporting status*, and at controlled-entity as well as consolidated-group level. Newmont's own disclosure establishes two Australian registered NGER controlling corporations with combined Scope 1 of 630,365 t (E-42): far above the publication threshold, and an NGER limb on its face. Whether those subsidiaries lodge financial reports under Chapter 2M, or are relieved (for example under a deed of cross guarantee), is not in the reviewed setCannot verify: threshold evidence not providedThe group-parent conclusion at D1-1 is correct but does not dispose of the Australian controlled entities. This does not create an obligation and no compliance finding is made; it records that the limb was not testable on the documents provided. Resolves the tension with the §6.1 recommendation to prepare "the Australian entities for the reporting obligations that apply to them"Cannot verify · Cannot determineIf those entities are in fact Chapter 2M reporting entities meeting a Group threshold, mandatory climate reporting would engage them on their own account, which is regulator-relevantConstitutional documents or ASIC lodgement records for Newmont Australia Pty Ltd and Newmont International Holdings Pty Ltd; any deed of cross guarantee
D1-2The report names "TCFD (2017 version)" in its framework list, with no reference to a successor standard, and the supporting index was not provided (E-43)Not yet mandatory / readiness issueThe only climate-specific framework claimed is a retired 2017 version, and the document that would evidence alignment is not in the reviewed setDecision-usefulness concern · MediumFramework alignment unverifiable; readiness for the current standard not demonstratedPublish the index; move to the current climate-disclosure standard
D1-3Australian subsidiaries are NGER controlling corporations; 44% of group Scope 1 is disclosed as subject to emissions-limiting regulation across six sites in three countries (E-41, E-42)Appears broadly compliant, minor limitationsUseful transition-risk disclosure. Scheme-specific obligations, facility baselines, decline rates, unit liabilities, are not disclosedMinor limitation · MediumRegulatory cost exposure not quantifiable from the disclosureDisclose per-scheme obligations and any expected unit liability

D.2 GHG inventory foundation & Scope 1 (Sections 06–07)

IDFinding & evidence chainMin-complianceDecision-usefulness / claim-qualitySeverity · ConfidenceConsequenceWhat would fix it
D2-1Contractor fuel combustion at Newmont-controlled facilities sits inside Scope 1 and 2 rather than in Scope 3 (E-38)No apparent issuePositive (above baseline): a boundary election that enlarges the target base in a contractor-heavy industry, against the company's own interestPositive · HighThe target base is larger and more complete than the operational-control minimum requires—
D2-2The five-year series is restated to a constant portfolio: former Newcrest assets included for full calendar years, six divested sites removed from every year, with per-line footnotes (E-39, E-40)No apparent issue: baseline (not credited)Internally comparable and well footnoted. It is not comparable to figures published in the years it restates, and the series is outside the assurance scope (E-23)No apparent issue · HighTrend statements rest on an unassured seriesExtend assurance to the trailing series
D2-3Scope 1 is essentially flat: 2.407 → 2.259 Mt (−6.2%), rising to 2.424 Mt in 2024, against production down 14.2%. Scope 1 per ounce rose (E-05, E-08)No apparent issueThe combined "Scope 1 and 2" presentation obscures that the direct-emissions limb has not materially improved and has worsened per unitDecision-usefulness concern · HighA reader attributing the headline fall to operational improvement is mistakenReport Scope 1 separately against production, as §3.3 does
D2-4Process emissions fall 0.072 → 0.004 Mt while a footnote records quicklime process emissions "reported through 2023"; the reporting change and any real reduction are not separated (E-49)Cannot verify: evidence not providedAbout 0.068 Mt, roughly 12% of the whole five-year Scope 1+2 reduction, sits behind an unquantified reporting-basis changeDecision-usefulness concern · MediumPart of the reported reduction may be a scope changeDisclose quicklime emissions for 2024–25 on the former basis
D2-5Under the heading "Significant Changes in Reporting Parameters": "There were no significant changes in 2025 to the organization's sectors, value chain or other business relationships compared to the previous reporting period" *(quotation corrected rev 1.2, earlier revisions substituted the heading's words into the sentence)*, two sentences after stating that restatements are provided for divestments, in the year of a six-site divestment and a full baseline recalculation (E-39, E-44)Minor limitationRead together the two statements point opposite ways. The GRI concept can be read narrowly enough to make the statement technically correct, which is why this is a limitation and not a compliance findingMinor limitation · HighA reader skimming the boundary section is told nothing changedAlign the two statements; cross-reference the rebaselining
D2-6Method, boundary, gases, GWP set (AR6), recalculation policy, biogenic separation and per-site emission-factor sources are documented in a published methodology (E-11, E-39)No apparent issue: baseline (not credited)Genuinely usable by a third party. This is the expected standard for a discloser of this size, so it earns no credit, but it is not a gap eitherNo apparent issue · High——

D.3 Scope 2 & renewable electricity (Section 08)

IDFinding & evidence chainMin-complianceDecision-usefulness / claim-qualitySeverity · ConfidenceConsequenceWhat would fix it
D3-1Market-based Scope 2 exceeds location-based in every year (2.107 vs 2.007 Mt in 2025), and market-based is the primary reporting and target basis. At Boddington the market-based factor is supplier-specific to the single named generator under contract, Bluewaters Power Station, +215,138 t against the state grid average (E-06, E-10, E-11, E-54). *(Rev 1.2: "coal-fired" withdrawn, the fuel type appears nowhere in the corpus.)*No apparent issuePositive (above baseline), on a narrow ground. Correct application of the market-based hierarchy is baseline (S2-28 / E-01). What is above baseline is reporting on the basis that yields the *higher* absolute number and holding to it, and specifically Boddington's use of the contracted generator's supplier-specific factor, which excludes state-grid decarbonisation from that site's reported Scope 2. The earlier rationale that this makes the percentage target harder to hit does not survive the series: over 2021–2025 market-based Scope 1+2 fell 11.6% against 10.6% location-based, so the chosen basis reports slightly *more* progressPositive · HighThe reported Scope 2 reflects the power actually contracted, not a flattering regional average—
D3-2Location-based Scope 2 fell 15.2% while purchased grid electricity was flat (+0.5%); the implied average grid factor fell 15.7%. Market-based fell 16.7%, so contractual instruments contributed about 0.063 Mt: 11% of the total Scope 1+2 reduction (E-06, E-07)No apparent issueThe largest single component of the headline reduction is other parties decarbonising the grids Newmont buys from, presented as company performance without decompositionDecision-usefulness concern · HighThe "12 percent reduction" reads as abatement and predominantly is notPublish the grid-factor / consumption / contractual decomposition
D3-3"22 percent renewable" comprises 3.89 million GJ in Canada (1.83), Peru (1.01), Ghana (0.69) and Argentina (0.35). Australia and Mexico record zero and produce 1,917,180 t, 91%, of market-based Scope 2 (E-12, E-13)No apparent issue (arithmetically correct)Predominantly the renewable content of host-country grids rather than procurement, and absent from the two jurisdictions where it would abate anything. Inside a decarbonisation narrative it reads as company actionDecision-usefulness concern · HighPublic and retail readers over-read a grid attribute as procurementReport procured renewable electricity separately from grid-mix content
D3-4The Cadia PPA is described as providing "approximately 40 percent of the site's energy needs", but the data tables record 0 GJ renewable purchased grid electricity in Australia, and Cadia's market-based factor is 0.587 t/MWh against 0.640 location-based: 8.3% below, consistent with roughly 8% renewable content (E-11, E-12, E-14)Cannot verify: material evidence missingThree of the company's own disclosures cannot be reconciled with each other. No certificate volumes, ownership or retirement records are given, and the methodology cites the NGER Determination market-based method rather than a supplier-specific renewable factorDecision-usefulness concern · High (on the gap) · Cannot determine (on the cause)The most prominent renewable procurement claim cannot be tied to any reported numberDisclose contracted volumes, certificate treatment, and how the agreement enters the market-based factor
D3-5Yanacocha's PPA takes that site's market-based Scope 2 to zero against 52,136 t location-based (E-10, E-11)No apparent issuePositive (above baseline), qualified: a clear procurement effect distinguishable from grid mix. About 2.5% of market-based Scope 2; certificate evidence not disclosedPositive (qualified) · High—Disclose the certificate chain
D3-6Boddington's Collgar Wind PPA is signed with supply from 2027; Cadia's PPAs are under review after "contractual issues ... related to delays and project economics"; Tanami remains a study. The three sites total 1.94 Mt, 44% of Scope 1+2 (E-15, E-48)Cannot verify: evidence not providedPositive (qualified) for the signed Boddington contract; decision-usefulness concern for the absence of revised dates, volumes or costs at any of the three. The "up to 70 percent over time" figure has no stated basisDecision-usefulness concern · HighThe projects the 2030 target depends on have no disclosed scheduleGive each project a status, date, tonnage and variance against plan
D3-7The report attributes the 4.7% year-on-year Scope 1+2 fall to "reductions in diesel and electricity consumption". Diesel energy did fall (19.66 → 18.21 million GJ); purchased grid electricity rose (17.06 → 17.38 million GJ) (E-07, C-16). Narrowed at rev 1.2: heavy fuel oil also fell (9.61 → 9.10 million GJ), and *total* electricity consumed, on-site generated 12.891 → 12.323 plus purchased 17.06 → 17.38, fell 0.8%, so the company's "electricity consumption" limb is constructible on a total-electricity reading. The earlier formulation "only diesel fell" is withdrawn as inaccurateMinor limitationWhat survives, and is the point that matters: purchased grid electricity is the sole driver of Scope 2, and it rose 1.9% while market-based Scope 2 fell 2.3%. The Scope 2 reduction is grid emission factor, not consumption. The on-site electricity reduction that does support the company's wording is a Scope 1 item, so pairing it with a combined Scope 1+2 headline conflates the twoDecision-usefulness concern · HighThe reader is given a cause for the Scope 2 movement that the Scope 2 driver contradictsAttribute the Scope 2 fall to the grid factor, and separate purchased from self-generated electricity

D.4 Scope 3 & value chain (Section 09)

IDFinding & evidence chainMin-complianceDecision-usefulness / claim-qualitySeverity · ConfidenceConsequenceWhat would fix it
D4-1Nine categories reported, six assessed out. C8, C9, C13 and C14 are excluded on substantive grounds that hold. C11 and C12 are excluded "for consistency with industry standards and insufficient data granularity" (E-45)Appears broadly compliant, minor limitationsThe industry-standards basis is accepted for gold doré and base-metal concentrate. Pairing it with a data-granularity reason converts a relevance conclusion into a partly data-driven oneMinor limitation · HighSmall in tonnage; a reader cannot tell which reason is load-bearingState the relevance conclusion on its own basis
D4-2Category 1 excludes acknowledged-relevant items estimated at 8% of that category, plus further items excluded for data constraints representing up to 10% of purchased-goods spend. The two are bounded on different denominators and never combined (E-17)Cannot verify: material evidence missingThe largest reported Scope 3 category has an unquantified completeness gap, disclosed in a footnote to a spreadsheetDecision-usefulness concern · HighCompleteness of C1, and so of the Scope 3 total and target base, cannot be establishedQuantify both exclusions in tonnes; state the combined effect
D4-3Category 15 is 2.010 Mt, 35% of Scope 3, the largest category and the only one rising in each of the last two years (1.820 → 1.971 → 2.010). It is the equity share of Nevada Gold Mines (38.5%) and Pueblo Viejo (40%) Scope 1 and 2, under partners' operational control; the report attributes the rise to "increases in their Scope 1 and 2 emissions" (E-16, E-20, E-21)Cannot verify: material evidence missingMore than a third of the −30% Scope 3 target base is another operator's emissions, moving the wrong way, with no disclosed bridge, influence mechanism or fallback. The filing concedes the target "is subject to the actions of entities not within our control"Decision-usefulness concern · HighThe Scope 3 target is substantially outside the company's control with no reconciliation offeredDisclose the C15 trajectory to 2030 under the partners' own commitments, the gap, and what closes it
D4-4Joint-venture Scope 3 is excluded from C15. Full quotation restored at rev 1.2: "*Following the Technical Guidance for Calculating Scope 3 Emissions from GHG Protocol*, Scope 3 emissions generated from joint ventures are excluded. Exclusion was determined following a relevancy and significance test that includes criteria of size, influence, business goals, and data availability" (E-20)Cannot verify: material evidence missingBasis reframed (rev 1.2). Investee Scope 3 is optional under the Technical Guidance the methodology cites, so the exclusion is conformant with the standard the entity reports against and is no longer characterised as a capricious data-quality exclusion under G-17. What survives is decision-usefulness only: the excluded block is unbounded, and on Newmont's own Scope 3 : Scope 1+2 ratio of about 1.3 it is plausibly of the same order as the whole of C15 as reported, but the review does not manufacture a figure (A-05). The "data availability" limb remains a production constraint rather than a relevance conclusion, as a supplementary criterionDecision-usefulness concern · High (on bounding) · Cannot determine (on magnitude) · No conformance findingA potentially material value-chain block sits outside the inventory on a partly data-driven testEstimate on the same spend and average-data methods used elsewhere, or state the magnitude and why it is immaterial
D4-5The narrative attributes the 2025 Scope 3 decrease to "product transportation and distribution and downstream processing of sold products". C10 (processing of sold products) rose 0.907 → 0.948 Mt; C1 fell 0.196 Mt, 71% of the net 0.277 Mt decrease, and is not mentioned (E-16, E-19)Potential compliance concernThe narrative names a category that moved against the result and omits the one that produced it. The omitted category is also the one carrying three 2024-effective method changesDecision-usefulness concern · HighThe reader is given the wrong explanation for the movementAttribute to the categories that produced it; quantify the method-change share
D4-6Three method changes effective in the 2024 inventory, capital purchases reclassified C1→C2, "allocation expenditures" excluded, double-counted diesel spend removed, each footnoted as individually under 5%, none quantified (E-18)Minor limitationThe cumulative effect on the C1 trend is not derivable, so the 0.473 Mt fall across the series cannot be split between method and realityDecision-usefulness concern · MediumThe largest Scope 3 movement is not attributableQuantify each change and restate like-for-like
D4-7The shift to supplier- and product-specific factors in C1 and C10 is described as an accuracy improvement; estimation elsewhere is spend-based with inflation and exchange-rate adjustment (E-16)No apparent issueSpend-based estimation is the expected starting point and is not a fault: the fault would be exclusion. The move to specific factors is a maturity step, correctly framed, and earns no scoring creditNo apparent issue · High—Report the data-quality mix by category so improvement reads as improvement
D4-8Nevada Gold Mines ounces were in Category 10 in 2021 and removed from 2022 onward "in line with our current organizational boundary"No apparent issueDisclosed boundary narrowing, footnoted, consistent with the C15 equity-share treatment. Contributes to the C10 fall between 2021 and 2022Minor limitation · HighSmall effect on the 2021→2025 C10 comparison—

D.5 Offsets, credits & net claims (Section 10)

IDFinding & evidence chainMin-complianceDecision-usefulness / claim-qualitySeverity · ConfidenceConsequenceWhat would fix it
D5-1No carbon offsets or neutralisation projects are accounted for in the inventory and no GHG removals exist. Avoided emissions from recycling are calculated but reported separately and expressly do not count toward the targets (E-37)No apparent issue: baseline (not credited)Every reduction in this review is gross; nothing is netted, and the avoided-emissions figure is correctly quarantined from target progress. Gross reporting is the expected baseline and is not scored as a positive, but it does mean the §3.3 decomposition tests real inventory movementNo apparent issue · High——
D5-2The 2050 ambition is supported by a decarbonisation pillar that includes "carbon offsetting strategies", and the filing states the company "will also consider the limited use of carbon neutralization or offsets ... for hard to abate emissions ... and there may be an insufficient supply of offsets to achieve our goals" (E-30, E-46)Cannot verify: material evidence missingNo residual-emissions definition, no eligibility criteria, no volume, no abatement-before-offset sequence. The company itself flags supply risk. The ambition is correctly labelled an ambition, which limits severityDecision-usefulness concern · HighThe 2050 endpoint has no mechanism a reader can assessDefine the residual, the neutralisation criteria and the abatement sequence

D.6 Targets & transition (Section 11)

IDFinding & evidence chainMin-complianceDecision-usefulness / claim-qualitySeverity · ConfidenceConsequenceWhat would fix it
D6-1The 2025 filing describes the targets as "science-based" (E-24) and states the company "plans to transition its operations" to a well-below-2°C goal by 2030 (E-29). The 2022 Climate Report disclosed SBTi approval in June 2021 and Scope 3 re-approval in September 2022 (E-31). No 2023, 2024 or 2025 document mentions SBTi (E-35), and the targets have been rebaselined twice since (E-39)Potential compliance concernT-13 requires alignment and validation to be distinguished, and the disclosure conflates them. "Science-based" asserts *alignment* with science-based criteria; the 2022 report separately asserted SBTi *validation*. Neither has been restated for the twice-recalculated targets, so the reader cannot tell which, if either, still holds. This is a validated-versus-claimed gap, not an assertion that the claim is false: the status is simply not stated (T-13, T-SBTi-01, T-SBTi-03, C-SBTi-02; A-05, AI-20). A public-register lookup was attempted and did not resolve it (see K-01)Serious decision-usefulness / misleading-risk concern · High (on the gap) · Cannot determine (on current validation status)Sets the A-17 ceiling: the headline quality claim about the targets is unsubstantiated in current disclosure. It caps institutional investors at 1 directly, and reinforces the retail and public caps, which are independently set under OUT-STK-05 by the two inverting headline figures and the renewable-share composition (see Annex L)State the current validation status and the outcome of any re-validation; if the targets are not validated, stop using "science-based"
D6-2The 2030 targets are the performance condition of a US$1bn 2.60% Sustainability-Linked Senior Notes due 2032; "a failure to meet our climate and sustainability targets will result in further expense" (E-26, E-27). The same filing states they are "aspirational and subject to change" and that "meeting this target should not be projected or relied upon" (E-25, E-28)Potential compliance concern (A-11: sustainability-linked finance attracts heightened scrutiny, and a deficient metric affecting financing escalates severity)Two irreconcilable characterisations of the same targets in one document. Investors hold a contractual claim priced off targets the issuer disclaims reliance on, and the step-up exposure is not quantified anywhere. GOV-06 supplies the operative conclusion: because the linked targets have been rebaselined twice since issuance, the finance linkage is to be treated as PROVISIONAL. The bond framework was not provided, so which target limbs are the actual trigger is also unknownSerious decision-usefulness / misleading-risk concern · HighInstitutional investors cannot price either the target or the instrument from the disclosureDisclose the trigger metric, observation date and step-up; describe the targets consistently across documents
D6-3No absolute 2030 endpoint is disclosed. The 2022 Climate Report gave 2.40 Mt (Scope 1+2) and 4.00 Mt (Scope 3) against a 3.57 Mt / 5.72 Mt base (E-32). The 2018 base is now 5.0 Mt, implying ≈3.40 Mt, a review derivation, not a company figure, while the targets table states "2030 target remains the same" (E-03, E-04)Decision-usefulness concernBoth rebaselinings are disclosed and follow the published 5% policy, so this is not a silent restatement. But the tonnage the target implies has moved by about a megatonne and the endpoint has been withdrawn, leaving a percentage the reader cannot track in tonnesDecision-usefulness concern · HighThe target cannot be tracked in the units emissions are measured inPublish the absolute endpoint per limb and show what changed at each rebaselining
D6-4The −32% intensity limb has no disclosed baseline under the current portfolio (the 0.61 t/kGEO figure in the 2022 report is for a different portfolio) and no progress statement. On the restated series intensity ran 0.73 / 0.66 / 0.73 / 0.72 / 0.75: a five-year high (E-04, E-09, E-32)Cannot verify: material evidence missingOne of three public targets has neither a baseline nor a progress figure, and it is precisely the limb that would surface D6-5. The report explains the increase as a production effect and offers a revenue-denominated intensity that fell because the gold price rose (E-47)Decision-usefulness concern · HighThe limb designed to control for production is the one a reader cannot trackDisclose the rebaselined baseline and report progress annually in the targets table
D6-5Across 2021–2025 absolute Scope 1+2 fell 11.6% while production fell 14.2%; roughly 7.3 of the 11.6 points are grid factor, 3.0 track production and Scope 1 fuel, and 1.3 are contracted supply (E-05 to E-08)No apparent issue (the arithmetic is correct)The headline performance claim is substantially delivered by lower output and third-party grid decarbonisation. The company performs this decomposition internally for its roadmap but does not publish itDecision-usefulness concern · HighThe central performance message does not survive decompositionPublish the decomposition
D6-6The 2022 Climate Report contained a project-level 2030 roadmap in tonnes, a marginal abatement cost curve and a US$100/t internal shadow carbon price. None appears in 2023, 2024 or 2025, and no standalone climate report has been published since the 2022 edition (E-33, E-34)Decision-usefulness concernEverything needed to judge achievability was published once and withdrawn without explanation or replacement. Prior-year reports are context, not current disclosure: the finding is the absence now, not the presence then (SEC-SF-11)Decision-usefulness concern · HighThe 2030 target is unassessable on current disclosureReinstate a costed pathway: projects, tonnes, capital, dates and residual gap
D6-7Target language has softened across the series: "2050 carbon-neutral goal" (2020–2022) → "ambition"; targets now "aspirational and subject to change" (E-28, E-46)No apparent issueSofter language is more accurate about uncertainty and is not itself a fault (A-18). It becomes a concern only where it coexists with the bond linkage (D6-2) and the retained "science-based" descriptor (D6-1)Minor limitation · High—Consistency across documents
D6-8The Scope 3 target depends on a category 35% of which is a partner's rising operations; the filing concedes the target "is subject to the actions of entities not within our control", with no bridge or fallback (E-20, E-21; chains to D4-3)Cannot verify: material evidence missingAn externally dependent target with no disclosed dependency pathway and no fallback actionDecision-usefulness concern · High−30% by 2030 is not assessableDisclose the dependency pathway, the gap and the fallback

D.7 Governance, remuneration & assurance (Section 12)

IDFinding & evidence chainMin-complianceDecision-usefulness / claim-qualitySeverity · ConfidenceConsequenceWhat would fix it
D7-1PwC limited assurance under ISAE 3000 (Revised) and ISAE 3410 covers Scope 1 (2.259), market-based Scope 2 (2.107), Scope 3 C1/C2/C3/C10 and total energy. Outside scope: location-based Scope 2, C4–C7, C15 (2.010 Mt, the largest category), the Scope 3 total, the intensity metric and all progress percentages (E-22)Appears broadly compliant, minor limitationsAssured Scope 3 is 3.383 of 5.677 Mt: 60%. The single largest category and the headline total are unassured. This is the pattern in which an assurance statement is read as covering more than it does (GOV-03, GOV-16, S3A-06, OUT-STK-13)Serious decision-usefulness / misleading-risk concern · High: raised from decision-usefulness concern on re-test against the S3A-06 ladder, which places financing that relies on selected or unassured metrics with material boundary gaps at the serious rung. That rung is reached here: a US$1bn coupon is priced off progress percentages expressly outside the assurance scope, against a Scope 3 base whose largest category and total are unassured and whose joint-venture Scope 3 is excluded (chains to D6-2)The Scope 3 total and its largest component carry no assurance, and a financial instrument is priced off progress against themExtend assurance to the Scope 3 total, C15 and the intensity metric
D7-2"Our assurance conclusion ... does not extend to information in respect of earlier periods" (E-23)No apparent issueStandard and properly stated, but it means the restated five-year series, the only basis for any trend claim in the report or in this review, is entirely unassuredDecision-usefulness concern · HighEvery trend statement rests on unassured dataExtend assurance to the trailing series
D7-3Board oversight sits with the Safety and Sustainability Committee, which reviewed and recommended the report for Board approval and engaged directly with the assurance provider (E-50)No apparent issue: baseline (not credited)Functioning governance machinery is the expected baseline. The committee chair's letter is notably restrained: it reports the rebaselining and makes no progress claimNo apparent issue · High——
D7-4The report refers readers to the 2026 Proxy Statement for how sustainability performance influenced remuneration; that document was not providedCannot verify: evidence not providedWhether the targets that price a US$1bn bond also drive executive pay is untestedCannot verify · Cannot determineIncentive alignment unknownProvide the remuneration disclosure
D7-5The US$1bn sustainability-linked bond creates a direct financial consequence for target failure (E-26, E-27)No apparent issueA genuine financial linkage, but see D6-2: the instrument's terms are not disclosed, the exposure is not quantified, and the underlying targets are disclaimed in the same documentEscalated to D6-2 · High—Quantify the step-up exposure

D.8 Sector module & new-module findings (Section 13)

IDFinding & evidence chainMin-complianceDecision-usefulness / claim-qualitySeverity · ConfidenceConsequenceWhat would fix it
D8-1Mining module. Diesel is 1.336 Mt, 59% of Scope 1, and fell 6.6% against production down 14.2%: worsening per unit. The named zero-emission haulage alliance disclosed in 2021–2022 does not appear in the 2025 report, zero mentions (E-05, E-08, E-33, E-51, E-63)No apparent issueCorrected at rev 1.2. The largest direct-emissions source in the business has no disclosed abatement pathway in current reporting, and the programme that was the disclosed pathway goes unmentioned. Withdrawn: this was contradicted by the source. The 2025 report carries a full-page feature on a fleet of 50-tonne battery electric haul trucks in service at Brucejack, "after several years in operation", with a stated evaluation of portfolio expansion, plus an Energy Management System pilot planned for 2026 expected to cut energy use 2–5% (E-63). Recorded as a qualified positive at P5. What survives: the disclosed programme is unquantified and immaterial in scale: Brucejack is 1.1% of Scope 1, no tonnes, capital, dates or expansion commitment are given, and the named alliance that carried the 2030 roadmap contribution (0.05 Mt in CR2022) has disappeared without explanationDecision-usefulness concern · HighScope 1 abatement is unquantifiable, not undisclosedDisclose the haulage decarbonisation programme status, tonnes and dates
D8-2Mining module. Heavy fuel oil is 0.679 Mt, 30% of Scope 1, concentrated at Lihir (545,133 t) and Merian (133,434 t), both off-grid self-generating sites; Lihir sells 40% of the energy it generates off-site (E-52)No apparent issueTwo off-grid sites carrying 30% of Scope 1 have no disclosed transition option: neither appears in any renewable programme descriptionDecision-usefulness concern · HighA third of Scope 1 has no disclosed pathwayDisclose options and constraints for the off-grid sites
D8-3Mining module. 44% of Scope 1 (986,185 t) is under emissions-limiting regulation across Australia, Canada and Mexico; the filing discloses a Canadian carbon tax rising from C$80 to C$170 per tonne by 2030 (E-41)No apparent issue: baseline (not credited)Useful exposure disclosure. The financial effect is described qualitatively; no quantified sensitivity is given, and the internal carbon price disclosed to 2022 has been withdrawnDecision-usefulness concern · MediumCarbon-cost exposure not quantifiableReinstate the internal carbon price and disclose a cost sensitivity
D8-4Inherited emissions-growth exposure (SEC-INV-LT-17 / T-INV-01). Newmont holds 38.5% of Nevada Gold Mines and 40% of Pueblo Viejo, both partner-operated. Its equity share of their Scope 1+2 rose in each of the last two years (1.820 → 1.971 → 2.010 Mt) and sits inside its own −30% Scope 3 target (E-16, E-20, E-21)Cannot verify: material evidence missingTextbook inherited-growth exposure: a share of another operator's emissions rising inside the entity's own target, with no operational control and no disclosed influence mechanism. Corrected at rev 1.2. Indicative quantification of future headroom is not possible: the partners' own target headroom is not disclosed in the reviewed set. Withdrawn, the evidence *is* in the review corpus. CR2022 p.36 discloses the operator by name (Barrick), its published commitment (−30% Scope 1+2 by 2030 off 2018; carbon neutral 2050), its named projects, and an allocated −0.720 Mt Category 15 reduction inside the 2030 Scope 3 roadmap (E-57). Against that plan, the equity share has moved +0.190 Mt since 2023. The finding is therefore harder, not softer: the exposure is quantified by the company's own withdrawn roadmap, and the disclosure that quantified it has since been removed (F-22). Current-period headroom remains cannot-verify because no post-2022 partner data is disclosedDecision-usefulness concern · High (exposure) · Quantified against the company's own withdrawn planThe unassessed exposure qualifies the −30% Scope 3 targetReinstate the partner commitment, the allocated reduction, actual-against-plan and the gap
D8-5Mining module: composition. No coal or petroleum production; the portfolio is gold with copper, silver, lead and zinc co-products, and the board letter frames copper demand as a transition opportunityNo apparent issue: baseline (not credited)Portfolio composition is noted for context. No credit is taken for the absence of fossil-fuel production, and no peer ranking is made (A-16, OUT-TB-14)No apparent issue · High——
D8-6Mining module: downstream processing (SEC-MIN-10). Category 10 is 0.948 Mt, 17% of Scope 3, and rose in 2025 (E-16). The methodology discloses the calculation basis in reasonable detail: a hybrid average-data and customer-specific method by product, the World Gold Council global refining factor for gold, the US EPA lead-production factors selected by the customer's actual processing route, and publicly available customer factors or generic route factors for copper, zinc and molybdenum concentrate. Products from non-operated joint ventures are excluded, consistent with the equity-share treatment of Category 15, and Nevada Gold Mines ounces were removed from 2022 (E-16 footnote)Appears broadly compliant, minor limitationsFor a company selling copper, lead and zinc concentrate this category is central, and it is one of the better-documented parts of the inventory: the factor source is named per product and per processing route, and it is inside the assurance scope (E-22). Two limitations: the mix of customer-specific versus industry-average factors is not disclosed by product, so a reader cannot tell how much of the 0.948 Mt is primary data; and no influence pathway over smelter emissions is described, which matters because Category 10 sits inside the −30% Scope 3 target and rose this yearMinor limitation · HighThe category is liftable and assured, but its data-quality mix and the company's route to influencing it are both undisclosedDisclose the customer-specific versus industry-average split by product, and the engagement pathway with smelter customers

Financed-emissions target headroom & benchmark (SEC-FI-TGT-04): *N/A, not a financial institution.*

Sector targetLatest reportedTarget value% change permittedFlat-line benchmarkFossil-fuel override?Ruling
N/AN/AN/AN/AN/AN/ANot a financial institution: module not triggered

D.9 Nature & physical risk (Section 14)

IDFinding & evidence chainMin-complianceDecision-usefulness / claim-qualitySeverity · ConfidenceConsequenceWhat would fix it
D9-1Physical risk work is described qualitatively: site climate narratives developed with the National Center for Atmospheric Research, narratives completed in 2025 for the four newly acquired sites, integration of climate projections into site water balances, and a life-of-mine access road study at Brucejack, which sits above the Knipple Glacier on a single access roadNo apparent issueSpecific and operationally grounded rather than generic. But the referenced climate risk tables were not provided, no financial quantification appears in the reviewed documents, and the supporting Climate Management Standard is "expected to be finalized in 2026"Decision-usefulness concern · MediumPhysical exposure cannot be sizedProvide the risk tables with quantified exposure and timing
D9-2First year of nature-related disclosure alignment; nature and climate are linked through water systems and ecosystem changeNo apparent issue: baseline (not credited)Appropriate scope; no climate-relevant finding arisesNo apparent issue · Medium——
D9-3Adaptation roadmaps: all sites have completed the first three of four planning steps; the final step is deferred into the 2026 Climate Management Standard rolloutMinor limitationThe process is disclosed with an honest status. The deliverable that would make it decision-useful, the roadmaps themselves, does not exist yetMinor limitation · HighAdaptation response not yet assessablePublish the roadmaps with timelines and indicative costs

Annex E: Cross-rule escalation chains (AI-06 / AI-23)

Base issueChains toRule + evidence IDsEscalated severity
SBTi validation last confirmed September 2022; two rebaselinings since; no status stated (D6-1)The "science-based" descriptor retained in the statutory filing (C-04) and the well-below-2°C transition statement (C-05). The link is direct: the descriptor is the claim, and the validation was its only disclosed evidenceT-SBTi-03 → C-SBTi-02 → A-17 · E-24, E-29, E-31, E-35, E-39Serious decision-usefulness / misleading-risk concern: sets the A-17 ceiling
Targets described as "aspirational and subject to change" and not to be "projected or relied upon" (E-25, E-28)The same targets being the performance condition of a US$1bn registered public bond (E-26, E-27). The link is that both statements describe the identical metric in the identical document, and one of them prices a securityT-13 → A-11 → GOV-06 → DR-01/DR-03 · E-25 to E-28Serious decision-usefulness / misleading-risk concern
Grid-factor decline is 63% of the Scope 1+2 reduction and production fell 14.2% (D3-2, D6-5)The "12 percent reduction" headline (C-01) and the intensity limb with no disclosed baseline (D6-4). The link is that the intensity metric is the only published measure that would expose the production effect, and it is the one without a baselineA-19/G-BAU → T-14 → T-11 · E-01, E-05 to E-09Decision-usefulness concern (from "no apparent issue" on the arithmetic alone)
Category 15 is unassured, is the largest Scope 3 category, is rising, and is partner-controlled (D4-3, D7-1)The −30% Scope 3 target (C-03) and the same bond's performance condition (E-26). The link is that 35% of the target base is outside operational control, outside assurance, and moving away from the targetS3-14 + OUT-STK-13 → T-DEP-04 → SEC-INV-LT-17 → A-11 · E-16, E-20, E-21, E-22Decision-usefulness concern
Joint-venture Scope 3 excluded on a test whose criteria include data availability (D4-4)Scope 3 completeness (C-02) and therefore the Scope 3 total that is itself unassured. The link is that the exclusion sits inside the category that is already the largest and least verifiedS3-26 → OUT-STK-13 → S3A-06 · E-20, E-22Decision-usefulness concern
Withdrawal of the roadmap, marginal abatement cost curve and internal carbon price after 2022 (D6-6)Deliverability of the 2030 target (C-03) and the technology lens in §5.2. The link is that the withdrawn material was the only disclosed evidence of how the target would be metSEC-SF-11 → T-08 → DR-05 · E-33, E-34Decision-usefulness concern
Cadia PPA cannot be reconciled with the renewable-energy table or the site's market-based factor (D3-4)The "22 percent renewable" claim (C-07) and the Scope 2 reduction narrative (C-16). The link is that the same renewable-electricity dataset supports all three statementsE-24 → G-07 → A-19 · E-11, E-12, E-13, E-14Decision-usefulness concern: cannot-verify on cause
Scope 3 narrative attribution contradicted by the company's own data tables (D4-5)The audited-source hierarchy and cross-source consistency (§5.3). The link is that a narrative statement and a data table in the same reporting suite disagree on the direction of a named driverA-01B → DR-02 → OUT-TB-05 · E-16, E-19Decision-usefulness concern
The three renewable projects carrying the Scope 2 story are respectively future-dated, under contractual review and a study (D3-6)The 2030 absolute target (C-03) and the technology lens. The link is that these three sites are 44% of Scope 1+2 and are the disclosed mechanism for the targetT-DEP-04 → T-08 → DR-05 · E-14, E-15, E-48Decision-usefulness concern

Annex F: NoCO2 Net Zero Required Interventions, CAAM & Prohibited Activities screen (OUT-05)

ScreenOutputBasis
Required Interventions ScheduleApplicableMultiple prescribed intervention areas are engaged: purchased-electricity supply at Boddington, Cadia and Tanami (1.94 Mt, 44% of Scope 1+2); heavy fuel oil self-generation at Lihir and Merian (0.68 Mt); diesel haulage fleet (1.34 Mt, 59% of Scope 1). Each is currently described narratively rather than as a scheduled, dated intervention.
Clean Alternative AssessmentPotentially applicable: evidence requiredThe 2050 ambition expressly contemplates offsets for hard-to-abate emissions. No clean-alternative assessment is disclosed for the off-grid heavy-fuel-oil sites or the haulage fleet, which is where the hard-to-abate residual would be defined.
Prohibited Activities ScheduleNot apparently applicableNo coal or petroleum production; portfolio is gold with copper, silver, lead and zinc co-products. No prohibited activity identified from the reviewed materials. This is a screen outcome, not a credit.

Annex G: Rule-application table

Rule familyApplied?Result
Applicability gate (L / S2-01..06)YesNot a Chapter 2M reporting entity; AASB S2, RG 280 and the Australian mandatory regime not applicable for CY2025. Voluntary claims tested on their own terms.
GHG inventory foundation (G / GHG-STD)YesBoundary, method, GWP set, recalculation policy and biogenic treatment documented and applied. Two limitations: quicklime reporting-basis change (D2-4) and the reporting-parameters statement (D2-5).
Scope 1 (G-06 / S2-26)YesFlat absolute, worsening per unit; contractor emissions included (above baseline). Fully decomposed by fuel and site.
Scope 2 & renewables (E / S2-28)YesDual-basis reporting; market-based above location-based throughout and adopted as the target basis (above baseline). Grid-factor decomposition, renewable-share and Cadia PPA findings raised.
Scope 3 (S3 / S3A / G-15)YesNine categories reported, six assessed out. C1 exclusions, joint-venture Scope 3 exclusion and the C15 trajectory raised. Spend-based estimation not treated as a fault (S3-EST).
Offsets / net claims (E-08..22 / G-11)YesNo offsets, removals or netting in any period. The 2050 ambition's neutralisation mechanism is undefined.
Targets & transition (T / S2-14/15/40)YesSix findings: validation status, bond linkage, withdrawn endpoint, missing intensity baseline, BAU decomposition and withdrawn roadmap.
Governance / remuneration / assurance (GOV / A-11)YesLimited assurance covering 60% of Scope 3 and excluding the largest category and the total; remuneration link not verifiable.
Sector (SEC-*)Yes: mining moduleDiesel haulage, off-grid heavy fuel oil, emissions-limiting regulation exposure and portfolio composition assessed.
SEC-FI-TGT-04NoNot a financial institution.
SEC-FI-05ANoNot a financial institution.
SEC-SF / SEC-INV-LTYesSEC-SF-11 (dropped disclosures across periods) and SEC-INV-LT-17 / T-INV-01 (inherited emissions growth through partner-operated joint ventures) both fired.
NOCO2-MAP-01/02YesTen §6.1 gap rows mapped to specific NoCO2 Standard clauses; see §6.1.
Nature / physical risk (N)YesQualitatively specific, not quantified; referenced risk tables not provided.
A-01C / DR-01..07 (disclosure risk & cross-source)YesNGER reconciliation clean after normalisation; three surviving cross-source divergences, all internal to the company's own reporting suite.
YOY-01..08 (cross-period)YesSix reporting years and three report types compared; four dropped disclosures, two disclosed rebaselinings, one softened claim, no silent restatement identified.
A-16 / A-18 / OUT-TB-14 (no credit for baseline, exit neutral, no peer ranking)YesDetailed disclosure, methodology publication, governance machinery, assurance engagement and absence of fossil-fuel production all recorded as baseline or neutral, not as positives. No peer comparison made.
A-17 (headline-claim ceiling)YesThe "science-based" 2030 target claim is the headline claim; unsubstantiated in current disclosure; caps three audiences at 1. The enumeration at Annex L reaches the same three digits independently, on two defeated criteria each.
OUT-STK-04..13 / AMD-032 / AMD-034 (criterion enumeration and single-defeat reading)YesAll nineteen load-bearing criteria enumerated and marked at Annex L.1, counted at H.2 before any score is stated. 2 met, 9 workable partials, 8 not met. Two rows turn on a single defeat and both are named by ID: A3 and G2, each in the AMD-034 hold list, so each holds its row at 2. The aggregate criterion is not separately counted (AMD-032). Where a rule supplies its own rebuttal, OUT-STK-13's full category breakdown, and S3-26 on categories optional to report, the satisfied rebuttal makes the criterion pass on that limb and the workability test is not used to reopen it.

Annex H: Evidence requests / cannot-verify items (AI-21 / A-05)

IDItemPackEvidence requestedStatus
K-01Current external validation status of the 2030 targetsTarget progressAny current validation certificate or correspondence, the dates of any re-validation sought after the 2023 and 2025 rebaselinings, or a statement that the targets are self-determined. A public-register lookup was attempted on 29 July 2026 and did not resolve the question: the SBTi target dashboard is a client-side application that paginates ~15,000 records and does not expose company rows to a direct fetch, and the downloadable dataset was not retrievable in this environment. Secondary sources returned only Newmont's own 2021–2022 material, which the review already holds. The absence finding therefore rests on the company's own disclosure record, not on a register checkOpen: F-25, D6-1
K-02Cadia and Yanacocha renewable power purchase agreementsRenewable electricityFor Cadia: contracted volume in MWh or GJ for 2025; whether Newmont surrenders, retains or on-sells the associated certificates; how the agreement enters the market-based emission factor; and why the renewable purchased-electricity line for Australia shows zero. For Yanacocha: the same chain, since a market-based Scope 2 of zero against 52,136 t location-based is the strongest possible claim to rest on a contract whose volumes and certificate fate are not disclosedOpen: F-26, F-33, D3-4, D3-5
K-03Rebaselined 2018 emissions-intensity baselineTarget progressThe baseline value in t CO₂-e per gold-equivalent ounce under the current portfolio, and reported progress against the −32% intensity targetOpen: F-27, D6-4
K-04Category 1 method changesScope 3The tonnage effect of each of the three 2024-effective changes, and the like-for-like 2024→2025 Category 1 movementOpen: F-28, D4-6
K-05Process emissionsScope 3 / inventoryQuicklime process emissions for 2024 and 2025 on the pre-2024 reporting basisOpen: F-29, D2-4
K-06Executive remuneration linkRemunerationThe remuneration disclosure showing whether and how climate performance affects incentive outcomesOpen: F-30, D7-4
K-07Framework alignmentAssurance / disclosureThe 2025 Reporting Index and the referenced climate risk tablesOpen: F-31, D1-2, D9-1
K-08Excluded Scope 3 itemsScope 3Estimated tonnes for the materiality-excluded Category 1 items and for the data-constraint exclusionsOpen: F-32, D4-2
K-09Joint-venture Scope 3Scope 3An estimate of Nevada Gold Mines' and Pueblo Viejo's Scope 3 at Newmont's equity share, or the quantified basis on which it is immaterialOpen: D4-4
K-10Category 15 forward trajectoryTarget progressPartly satisfied from the corpus at rev 1.2: CR2022 p.36 supplies the partner's name, its −30%-by-2030 commitment and an allocated −0.720 Mt Category 15 reduction (E-57). What is still requested is the current position: the partner's commitment as it now stands, actual-against-plan for Category 15 since 2019, and the residual gap against the −30% Scope 3 targetOpen (narrowed): D4-3, D8-4, F-22
K-11Sustainability-linked bond termsClimate-linked financeThe bond framework, second-party opinion, KPI definition, observation date, threshold and step-up quantumOpen: D6-2, D7-5
K-12Renewable procurement by siteRenewable electricityProcured renewable volumes separated from host-grid renewable content, per site, with certificate treatmentOpen: D3-3
K-132030 abatement pathwayTransition planProject list with tonnes, capital and dates; the current internal carbon price; and the residual gap against each target limbOpen: D6-6, D8-1, D8-2, D8-3
K-14Off-grid site optionsTransition planDisclosed options and constraints for heavy-fuel-oil displacement at Lihir and MerianOpen: D8-2

Annex I: Evidence-chain & triggered-scan log (AI-10)

Chain IDTriggerFollow-up scans runEvidence IDsFinal label
M-01"science-based" / "well below 2°C" target labelExact validated wording; validation body and date; scope, baseline and exclusions; validated-versus-claimed gap; framework halo; alignment versus validation distinguished (T-13); public-register lookup attempted 29 Jul 2026: did not resolve, see K-01 (§11, §03)E-24, E-29, E-31, E-35, E-39Serious decision-usefulness / misleading-risk concern; current status cannot verify
M-02Carbon-neutral claim ("carbon neutral by 2050")Gross emissions; boundary; exclusions; offsets and retirement evidence; claim period; residual emissions; assurance (§10, §06)E-30, E-37, E-46Cannot verify: no pathway or residual definition; correctly framed as an ambition
M-03Target achievement / progress claim ("12 percent reduction")Boundary; baseline; current year; progress calculation; gross versus net; offsets; Scope 3 coverage; method changes; mergers and acquisitions; restatements; assurance; remuneration links (§11)E-01, E-05 to E-09, E-36, E-39, E-40Decision-usefulness concern: arithmetically supported, not supported as abatement
M-04Market-based Scope 2 / renewable electricity claimLocation versus market basis; consumption; certificate evidence; ownership; retirement; timing; residual mix; sold certificates; wording (§08)E-06, E-07, E-10 to E-14Decision-usefulness concern on the renewable-share claim; cannot verify on the Cadia agreement
M-05Any reduction claim: BAU counterfactualScope 2 grid factor versus consumption versus market instruments; Scope 1 fuel versus production; scope decomposition (§06, §03)E-05 to E-09, E-51Decision-usefulness concern: 63% of the reduction is grid decarbonisation
M-06Combined "Scope 1+2" figureMandatory decomposition into Scope 1, Scope 2 location-based and Scope 2 market-based (§06, §07, §08)E-05, E-06Applied throughout §3.1, §3.3 and §3.4: revealed flat Scope 1 and worsening intensity
M-07Scope 3 disclosed / omitted / selectedCategory coverage; business-model-obvious categories; exclusions; data quality; spend versus supplier-specific; target boundary; consistency (§09)E-16, E-17, E-18, E-20, E-45Decision-usefulness concern on C1 and C15 completeness; estimation not treated as a fault
M-08Assurance statement presentSubject matter; level; assured metrics; exclusions; qualifications; Scope 3 completeness; whether nearby claims imply broader assurance (§12)E-22, E-23Decision-usefulness concern: largest Scope 3 category, the total and the whole series outside scope
M-09Climate-linked finance (sustainability-linked bond)Metric boundary; gross versus net; Scope 3 inclusion; offsets and certificates; target progress; assurance; controls (§12)E-26, E-27, E-25, E-28Serious decision-usefulness / misleading-risk concern: covenant and disclaimer in the same filing
M-10Transition plan / low-carbon opportunityActions; capital; dependencies; milestones; Scope 3 coverage; scenario analysis; financial effects; delivery risk (§11)E-15, E-33, E-34, E-48Decision-usefulness concern: pathway withdrawn after 2022, not replaced
M-11Methodology / boundary / base-year / restatement changeTime-series comparability; baseline recalculation; target progress; real versus accounting movement; mergers and acquisitions; peer comparability (§06, §11)E-18, E-39, E-40, E-44, E-49Mixed: restatements disclosed and footnoted; effects unquantified
M-12Coverage percentage claimNumerator; denominator; excluded categories (§11, §09)E-13, E-17, E-22The "22 percent renewable" denominator is purchased grid electricity, correctly stated; composition is the issue, not the arithmetic
M-13Target stated across multiple documents / multiple baselinesReconcile baseline year, base-year value, coverage percentage, version; coverage versus reduction baseline (§11)E-03, E-32, E-36, E-39Decision-usefulness concern: endpoint withdrawn; intensity baseline absent
M-14Externally dependent targetTarget year versus dependency pathway; disclosed bridge; fallback actions (§11)E-20, E-21Decision-usefulness concern: no bridge, no fallback for 35% of the Scope 3 target base
M-15Entity holds material equity investments in partner-operated assetsInherited emissions-growth exposure; look-through; indicative quantification where weights and headroom disclosed; reconcile against the entity's own target (§13, §11)E-16, E-20, E-21Decision-usefulness concern on exposure; magnitude cannot verify: no figure manufactured
M-16Australian entity / metric appearing in more than one placeNGER register lookup; cross-source consistency matrix; boundary and period normalisation before flagging divergence (§16, §01)E-42, and Annex JNGER reconciled; three internal cross-source divergences survive normalisation
M-17More than one reporting period and report type availableMulti-period series; restatements and rebasing; dropped and added disclosures; target weakening or retirement; cross-report-type divergence; certification continuity (§17, §06, §11)E-31 to E-36, E-40, E-46, and Annex KFour dropped disclosures; two disclosed rebaselinings; one softened claim; no silent restatement identified
M-18Sector trigger: miningHaulage fleet; off-grid generation; process emissions; emissions-limiting regulation; portfolio composition; downstream processing of sold products (SEC-MIN-10): product-level disclosure, methodology and factors, customer-specific versus industry-average data, target inclusion, disclosed influence pathway (§13)E-16, E-22, E-41, E-48, E-51, E-52Decision-usefulness concerns on haulage and off-grid pathways; SEC-MIN-10 minor limitation (data-quality mix and influence pathway undisclosed); composition screen passed

Annex J: Cross-source consistency matrix & disclosure-risk register (DR-01..DR-07 / A-01C / OUT-TB-18)

O.1 Cross-source consistency matrix (DR-02)

Claim / metricAnnual / financial reportSustainability / ESGMarketing / websiteClimate Active PDSCDPInvestor presentationsNGER / CER / SafeguardBoundary/period normalisationDivergence?
2030 Scope 1+2 target"science-based ... 32%"; "aspirational and subject to change"; "should not be projected or relied upon""−32%"; "aspirational"; "2030 target remains the same"Not reviewedN/A: no certificationNot providedNot reviewedN/ASame target, same periodYes: the statutory filing carries both the strongest quality claim and the strongest disclaimer; the sustainability report carries neither
Target validation statusDescribed as "science-based"; no validation body namedSilentNot reviewedN/ANot providedNot reviewedN/ASame targetYes: the descriptor appears only in the filing; the evidence for it was last published in the 2022 climate report
Target reliabilityBond performance condition and "should not be ... relied upon""aspirational and subject to change"Not reviewedN/ANot providedNot reviewedN/ASame document for the first twoYes: three characterisations, two in one document
Scope 1 (group)Not separately stated2.259 MtNot reviewedN/ANot providedNot reviewedAU only: 0.630 Mt (FY24-25, two controlling corporations)Statutory is July–June, Australia-only, and includes Telfer to 4 Dec 2024; disclosure is calendar-year, global, Telfer excludedNo: reconciles after normalisation
Scope 2 location-based (group)Not stated2.007 MtNot reviewedN/ANot providedNot reviewedAU only: 1.316 MtSame normalisationNo: Australian components within 4%
Scope 3 movement driverNot stated"driven by ... downstream processing of sold products"Not reviewedN/ANot providedNot reviewedN/ASame period, same categoriesYes: the company's own data tables show that category rose 0.907 → 0.948 Mt
Scope 2 movement driverNot stated"driven by reductions in diesel and electricity consumption"Not reviewedN/ANot providedNot reviewedN/ASame periodYes: purchased grid electricity, the sole Scope 2 driver, rose 17.06 → 17.38 million GJ while market-based Scope 2 fell 2.3%. *(Corrected rev 1.2: the earlier "only diesel fell" was inaccurate, heavy fuel oil also fell 9.61 → 9.10 million GJ, and total electricity consumed including on-site generation fell 0.8%. The divergence is confined to the Scope 2 limb.)*
Renewable electricity at CadiaNot stated"approximately 40 percent of the site's energy needs" (narrative) versus 0 GJ renewable purchased grid electricity for Australia (data tables)Not reviewedN/ANot providedNot reviewedN/ASame site, same period, same reporting suiteYes: internal to the reporting suite; cause undetermined
Reporting-basis continuityDiscloses rebaselining triggered by 2025 divestments"no significant changes in 2025 to the organization's sectors, value chain or other business relationships", under the heading "Significant Changes in Reporting Parameters" *(quotation corrected rev 1.2)*Not reviewedN/ANot providedNot reviewedN/ASame periodBorderline: the GRI concept may be read narrowly; recorded as a minor limitation, not a divergence
2050 position"ultimate ambition of being carbon neutral by 2050"; offsets "considered""ambition to become carbon neutral by 2050"; pillar includes "carbon offsetting strategies"Not reviewedN/ANot providedNot reviewedN/ASameNo: consistent between sources
Scope 3 trailing-series restatement basis *(added rev 1.2)*Not statedSR2025 p.75 chart footnote: Telfer removed only, ownership test 14 Feb 2025: against the Performance Data Tables footnote to the numerically identical series: six sites removed, ownership test 31 Dec 2025Not reviewedN/ANot providedNot reviewedN/AIdentical series, identical plotted valuesYes: internal to the reporting suite; the SR footnote is a verbatim carry-over from SR2024 and the plotted values follow the six-site basis (F-19, E-55)
2025 rebaselining trigger *(added rev 1.2)*"The acquisition of Newcrest … as well as the divestitures in 2024 through 2025 triggered Newmont to recalculate"SR2025 p.11: divestments "and the commencement of commercial production at Ahafo North", said to align with the methodology, against the methodology, which excludes greenfield projects coming into operation and lists only the six divestituresNot reviewedN/ANot providedNot reviewedN/ASame event, same yearYes: the stated reason is excluded by the company's own governing document (F-20, E-56)
Boddington power supply term *(added rev 1.2)*Bluewaters contract "expires in 2031 and includes an option to extend" (AR2025 p.56)Collgar renewable PPA "will commence in 2027", expected to cut site emissions "by up to 70 percent over time"; the incumbent contract term is not mentionedNot reviewedN/ANot providedNot reviewedN/ASame site, same contractsYes, by omission: the sustainability narrative presents a 2027 replacement without disclosing that the incumbent contract runs a year past the 2030 target date (F-21, E-54)
Category 15 abatement plan *(added rev 1.2)*Not statedCR2022 p.36: partner named, its −30%-by-2030 commitment stated, −0.720 Mt allocated to Category 15 in the 2030 Scope 3 roadmap, against SR2025, which does not mention the partner at all and gives no Category 15 pathwayNot reviewedN/ANot providedNot reviewedN/ASame category, same targetYes, across periods: the quantified plan and the counterparty's identity were withdrawn while the category rose +0.190 Mt since 2023 (F-22, E-57)
Lihir energy sold off-site *(added rev 1.2)*Not statedPD2025 site-level footnote: "40% of energy generated at the Lihir site is sold for consumption off-site", against the trailing-table footnote in the same worksheet: "Newmont does not currently sell any energy … therefore total electricity generated is equal to total electricity consumed"Not reviewedN/ANot providedNot reviewedN/ASame worksheet, same periodYes: same-document conflict; ≈3.0 million GJ, about 6% of reported energy consumed (F-24, E-60)

O.2 NGER statutory reconciliation (A-01C)

MetricDisclosed (report)NGER register (year · as-at)Boundary difference (op-control / AU-only / method / period)Reconciled?Label
Scope 1524,582 t: Australia, CY2025 (Boddington 223,113 + Cadia 77,710 + Tanami 223,760)630,365 t: FY2024-25, as at 27/02/2026 (Newmont Australia Pty Ltd 425,733 + Newmont International Holdings Pty Ltd 204,633)Statutory year is July 2024–June 2025 and includes Telfer, divested 4 December 2024; disclosure is calendar 2025 with Telfer removed from every period. Both operational control, Australia onlyYes: the ~106,000 t difference is consistent with roughly half a year of Telfer plus the period offsetReconciled after normalisation: no divergence finding
Scope 2 (location-based)1,264,803 t: Australia, CY20251,316,264 t: FY2024-25Same period and entity differencesYes: within 4%Reconciled after normalisation
Net energy (GJ)15,930,353 GJ total Australian energy consumed, CY202518,230,930 GJ net energy, FY2024-25Statutory "net energy" is a defined scheme measure and is not the same quantity as total energy consumed; period and Telfer differences also applyDirectionally consistent; not precisely comparableCannot verify precision: definitional difference, not a divergence

Two controlling corporations were required for a complete picture. Searching "Newmont" alone returns both Newmont Australia Pty Ltd and Newmont International Holdings Pty Ltd; the latter holds the former Newcrest assets. "Newcrest" returns no match for FY2024-25, consistent with the entities having been renamed or restructured after the 2023 acquisition: absence from the register under that name does not imply zero emissions.

O.3 Disclosure-risk register (DR-01 / DR-03..DR-07)

#LensExposure & confidenceDriver (finding / evidence IDs)Cross-source link (DR-02)What would reduce it
O-1LegalModerate to elevated (rev 1.2) · HighD6-1, the "science-based" descriptor retained in a statutory filing, with the supporting validation last disclosed in 2022 and two rebaselinings since. Corrected at rev 1.2: a present-tense factual descriptor, the filing's wording is a *past-tense recount* of the 2020 announcement, and the recount is accurate as to 2020. The residual is that the recount is the only current appearance of the descriptor and nothing tells a reader whether it still holds. E-24, E-29, E-31, E-35, E-58Row 2: the descriptor appears only in the filingState the current validation status, or cease using the descriptor
O-2LegalElevated · HighD6-2: targets that price a US$1bn registered public bond are disclaimed as unreliable in the same document. E-25 to E-28Rows 1 and 3Reconcile the characterisations; disclose the bond's trigger, observation date and step-up
O-3Legal / consumerModerate · HighD3-3, D4-5, D3-7: three public statements that do not survive comparison with the company's own data (renewable composition; Scope 3 driver; Scope 2 driver). E-12, E-13, E-16, E-19, E-07Rows 6, 7, 8Correct the attributions and separate procured from grid-mix renewables
O-4RegulatoryModerate · MediumD1-2: the only climate framework claimed is a retired 2017 version, with the supporting index not provided and no successor standard referenced. E-43—Adopt the current standard and publish the index
O-5RegulatoryLow · HighD1-3, D8-3: 44% of Scope 1 under emissions-limiting regulation is disclosed, and the statutory register reconciles. Exposure is cost quantification, not compliance. E-41, E-42O.2Disclose scheme obligations and a carbon-cost sensitivity
O-6TechnologyModerate · MediumD3-6, D8-1, D8-2, D6-6, the 2030 target rests on three renewable projects (one future-dated, one under contractual review, one a study) with no costed pathway; 89% of Scope 1 (diesel haulage plus off-grid heavy fuel oil) has no quantified abatement route, corrected at rev 1.2 from "no disclosed abatement route", which the source contradicts: an in-service BEV haul fleet at Brucejack (1.1% of Scope 1) and an EMS pilot are disclosed, neither with tonnes, capital or dates (E-63). The two off-grid heavy-fuel-oil sites, Lihir and Merian, remain absent from every abatement description. E-15, E-33, E-48, E-51, E-52, E-63—Reinstate the costed roadmap with project-level status
O-7TechnologyModerate · HighD5-2: the 2050 ambition contemplates offsets for hard-to-abate emissions, and the filing itself warns of insufficient supply. E-30Row 10Define the residual and the abatement-before-offset sequence
O-8PhysicalLow to moderate · LowD9-1, D9-3: physical risk work is specific and active but unquantified in the reviewed set; the referenced risk tables were not provided and the adaptation roadmaps do not yet exist—Provide the risk tables with quantified exposure and timing
O-9Commercial / financingElevated · HighD6-2, D7-5: a coupon step-up is triggered by target failure, and current trajectory (12% against 32%, intensity worsening, Scope 3 at 1.6% against 30%) makes that live. The exposure is not quantified anywhere. E-26, E-27Rows 1 and 3Quantify the step-up and report progress against the bond's specific trigger metric
O-10ReputationalModerate · MediumD6-6, F-14, F-22: withdrawal of the roadmap, cost curve, internal carbon price, standalone climate report and the quantified −0.720 Mt Category 15 plan together with the counterparty's identity, with no explanation or replacement, against a background of retained strong target language. E-33, E-34, E-57—Reinstate the withdrawn disclosures or explain their removal
O-11Regulatory / disclosure quality *(added rev 1.2)*Moderate · HighF-19, F-20: two statements of the reporting basis inside the 2025 suite that the suite itself contradicts: a Scope 3 chart footnote describing a Telfer-only restatement for a six-site series (verbatim carried over from the prior year), and a rebaselining reason the company's own methodology expressly excludes while claiming alignment with it. Both sit on the denominator of the covenanted −32% and the headline −12%. E-55, E-56Rows 11 and 12 of O.1Correct the chart footnote to the actual basis; state which document governs recalculation and disclose the tonnage effect of each rebaselining component
O-12Technology / commercial *(added rev 1.2)*Moderate · HighF-21: the incumbent supply contract at the largest emitting site runs to 2031, past the target date, while the public narrative presents a 2027 renewable PPA as the site's future supply. No volumes, split or displacement schedule is disclosed for either arrangement. E-54, E-62Row 13 of O.1Disclose contracted volumes by year to 2031 under each agreement and the resulting site Scope 2 pathway

Annex K: Longitudinal series & cross-period tracking register (YOY-01..08 / OUT-TB-19)

P.1 Multi-period headline series (YOY-02): *values as stated, with the source per period.*

Metric / claimPeriod →20212022202320242025Source(s) per cellBoundary/method normalisation
Scope 1 (Mt)2.4072.3892.2592.4242.259PD2025 trailing table, all cellsConstant portfolio: Newcrest in for full years, six divested sites out of every year
Scope 2 (location)2.3672.1411.8521.9802.007PD2025 trailing tableSame
Scope 2 (market)2.5302.2671.9772.1572.107PD2025 trailing tableSame. Market-based exceeds location-based in every year
Scope 3 by category (Mt)C11.9891.8941.7811.7121.516PD2025 trailing tableThree method changes effective 2024, unquantified
C20.0730.1030.0840.1090.071PD2025Capital purchases reclassified from C1 effective 2024
C30.8140.7680.7590.8930.848PD2025Double-counted diesel spend removed effective 2024
C40.2750.2150.1970.2740.184PD2025—
C50.0450.0250.0140.0090.010PD2025—
C60.0030.0150.0270.0380.042PD2025Rising in every year of the series: immaterial in tonnes but relevant to the F-12 correction at rev 1.2
C70.0390.0380.0390.0410.048PD2025Rising 2023–2025, including in each of the last two years: see the F-12 correction at rev 1.2
C100.9710.8230.6740.9070.948PD2025Nevada Gold Mines ounces removed from 2022; Red Chris 2023 adjusted +24,000 t
C152.1151.9481.8201.9712.010PD2025Rising since 2023: the only *material* category to do so; joint-venture Scope 3 excluded throughout, on a GHG-Protocol-permitted basis (E-20). +0.190 Mt since 2023 against a withdrawn plan requiring −0.720 Mt by 2030 (E-57, F-22)
Total Scope 3 (Mt)6.3245.8305.3955.9545.677PD2025Not assured in any year
Total Scope 1+2 market (Mt)4.9374.6564.2364.5804.366PD2025—
Intensity metric (t/GEO, market)0.730.660.730.720.75PD2025 intensity tableFive-year high in 2025; 2018 baseline not disclosed under this portfolio
Intensity (t/GEO, location)0.700.650.710.690.73PD2025Same direction
Production (M GEO, derived)6.787.025.776.355.82Derived: total energy ÷ energy-intensity rowsReview derivation, not a disclosed figure
Renewable electricity %Not reported11%23%21%22%PD2025 indirect energy table2021 not reported; Newcrest assets absent from the 2021–22 disaggregation
Offset / certificate volumeNilNilNilNilNilGHG Methodology p.3No offsets or removals in any period
Reported progress versus 2018 baseline———−7% (base 5.4 Mt)−12% (base 5.0 Mt)SR2024 p.71; SR2025 p.73Different baselines; not directly comparable
Reported Scope 3 versus 2019 baseline———+4% (base 6.3 Mt)−1.6% (base 5.769 Mt)SR2024 p.71; SR2025 p.73Rebaselining accounts for roughly 1.6pp of the swing; the remainder is the 2025 movement

P.2 Silent restatement & baseline-rebasing log (YOY-04)

#Figure / baselineAs stated in report of the periodAs restated in a later reportDisclosed & like-for-like?Effect on an on-track / pay / financing claimLabel (concern / acceptable / cannot-verify)
P2-12018 Scope 1+2 baseline3.57 Mt (CR2022)5.4 Mt (SR2024) → 5.0 Mt (SR2025)Yes: both changes disclosed, trigger threshold published, driver named (Newcrest in 2023; six divestments in 2025)Moves the implied 2030 endpoint from 2.40 Mt to ≈3.40 Mt; the percentage target is unchangedAcceptable as a restatement; the concern is the withdrawn endpoint (D6-3)
P2-22019 Scope 3 baseline5.72 Mt (CR2022)6.3 Mt (SR2024) → 5.769 Mt implied (SR2025)Yes: same disclosureReported position moves from +4% above baseline to −1.6% below; roughly 1.6pp of that swing is the rebaselineAcceptable; effect quantified in this review, not by the company
P2-32018 intensity baseline0.61 t/kGEO (CR2022)Not disclosed under the current portfolioNo: the figure has simply disappearedProgress against the −32% intensity target is untrackableConcern: D6-4
P2-4Trailing five-year seriesEach year as originally publishedFully restated to a constant portfolio in PD2025Yes: footnoted line by line, with the restatement basis statedMakes the series internally comparable; it is not comparable to originally published figures, and it is unassuredAcceptable; assurance gap recorded at D7-2
P2-5Aviation fuelIn Scope 3 pre-2024Reclassified to Scope 1 from 2024 where Newmont owns and operates the aircraft; trailing years restatedYes: footnotedImmaterial (0.001 Mt)Acceptable
P2-6AcetyleneNot reported by 12 sites in 2023Reported by all sites from 2024Yes: footnotedAdds ~0.008 Mt to Scope 1Acceptable
P2-7Quicklime process emissionsIncluded through 2023Not reported from 2024Disclosed in a footnote, but the tonnage effect is not statedUp to ~0.068 Mt, roughly 12% of the five-year Scope 1+2 reductionCannot verify: D2-4
P2-8Category 1 spend allocationIncluded pre-2024Three separate exclusions and reclassifications effective 2024Disclosed in footnotes, each stated to be individually under 5%, none quantifiedCumulative effect on the C1 trend not derivableCannot verify: D4-6
P2-9Nevada Gold Mines ounces in Category 10Included 2021Excluded from 2022 onwardYes: footnoted, with the boundary rationale givenContributes to the C10 fall between 2021 and 2022Acceptable
P2-10Scope 3 trailing series: constant-portfolio definition *(added rev 1.2)*SR2025 p.75 chart footnote: Telfer removed only; ownership test as at 14 Feb 2025PD2025 footnote to the numerically identical series: six sites removed; ownership test as at 31 Dec 2025No: the two footnotes state incompatible bases for one series, and the SR footnote is a verbatim carry-over from SR2024. The plotted values follow the six-site basis, so the *numbers* are right and the *stated basis* is wrong in the primary narrative documentA reader reconstructing the constant portfolio from the Sustainability Report alone would use the wrong oneConcern: F-19

Amended at rev 1.2. No silent restatement was identified: every restatement located is footnoted, and several are not quantified. But the earlier conclusion that the restatement basis is *consistently and correctly* footnoted does not survive: P2-10 records two incompatible statements of the constant-portfolio definition for one identical series, and F-20 records a rebaselining reason given in the Sustainability Report that the company's own methodology expressly excludes. The defect is in the description of the restatements, not in the restated numbers.

P.3 Dropped / added disclosure log (YOY-05)

#Item (metric / category / target / claim / limitation)Present inAbsent/added inExplained?Label
P3-1Standalone climate report2020, 2021, 2022 editions (the 2022 published May 2023)Absent 2023, 2024, 2025No explanation given in any documentConcern: D6-6
P3-2Quantified 2030 abatement roadmap, project by project in tonnesCR2022 pp.30–33Absent from 2023 onwardNoConcern: D6-6
P3-3Marginal abatement cost curveCR2022 p.35Absent from 2023 onwardNoConcern: D6-6
P3-4Internal shadow carbon price (US$100/t)CR2022 p.29Absent from 2023 onwardNoConcern: D8-3
P3-5Absolute 2030 target endpoints (2.40 Mt / 4.00 Mt)CR2022 p.29Absent from 2023 onwardNoConcern: D6-3
P3-6Intensity target baseline (0.61 t/kGEO) and endpoint (0.41)CR2022 p.29Absent from 2023 onwardNoConcern: D6-4
P3-7SBTi validation statusSR2022 (10 references); CR2022 p.28Absent 2023, 2024, 2025NoConcern: D6-1
P3-8Framework index for the climate frameworkCR2022 p.61Referenced in SR2025 but the index document was not providedPartly: the report points to a separate indexCannot verify: D1-2
P3-9Zero-emission haulage alliance (named strategic partnership; 0.05 Mt allocated to the 2030 roadmap in CR2022)2021 and 2022 climate reportsThe named alliance is absent from the 2025 report, zero mentions. *(Corrected at rev 1.2: haulage electrification itself is NOT absent, an in-service BEV fleet at Brucejack is featured, unquantified. E-63, P5.)*NoConcern, narrowed: D8-1
P3-10Nature-related disclosure alignment—Added 2025 (first year)Yes: stated as a first-year alignmentAcceptable: addition
P3-11Site-level Scope 3 breakdown—Added in the 2025 reporting suiteYesAcceptable: addition; a genuine improvement in granularity
P3-12"Aspirational" descriptor on the targetsNot used 2020–2022Present 2023 onwardPartly: framed as forward-looking-statement languageAcceptable: softer language is more accurate; see D6-7

P.4 Target-trajectory log (YOY-06 / YOY-08)

#Target / claimBase yrTarget yrCoverage / scopeChange across periods (weakened / extended / rebased / re-scoped / retired / replaced)On-track survives series?Label
P4-1−32% absolute Scope 1+220182030Group, operational control, market-basedRebased twice (2023 Newcrest; 2025 divestments), both disclosed. Percentage unchanged; absolute endpoint moved from 2.40 Mt to ≈3.40 Mt and was then withdrawn from disclosureAt −12% of −32% with five years remaining, and with 63% of progress to date attributable to grid decarbonisation: noDecision-usefulness concern: D6-3, D6-5
P4-2−32% Scope 1+2 intensity20182030Group, per gold-equivalent ounceRebased twice; the rebaselined baseline has never been published. Endpoint (0.41) withdrawnIntensity has risen to a five-year high: no, and progress cannot be computed at allCannot verify / concern: D6-4
P4-3−30% absolute Scope 320192030Nine categories; includes joint-venture Scope 1+2 at equity shareRebased twice; endpoint (4.00 Mt) withdrawn. Scope narrowed slightly (Nevada Gold Mines ounces out of C10 from 2022)At −1.6% of −30%, with 35% of the base rising and outside operational control: noDecision-usefulness concern: D4-3, D6-8
P4-4Carbon neutral by 2050—2050GroupSoftened from "goal" (2020–2022) to "ambition" (2023 onward); offsets moved from a stated strategy element to something that "will be considered"Not assessable: no pathway, no residual definitionCannot verify: D5-2
P4-5"Science-based" characterisation——All three 2030 limbsValidation disclosed 2021 and re-confirmed September 2022; no mention since; descriptor retained in the statutory filingNot applicableSerious concern: D6-1; sets the A-17 ceiling
P4-6Sustainability-linked bond KPI—2030The 2030 climate targetsUnchanged as a covenant since December 2021, through both rebaselinings, while the targets themselves were rebased and the language softenedNot assessable: trigger metric and observation date not disclosedSerious concern: D6-2

No target has been retired or formally weakened in percentage terms across the six years. The trajectory concern is the progressive withdrawal of the information that made the targets assessable, combined with a covenant that has remained fixed while the targets beneath it were twice recalculated.

P.5 Cross-report-type consistency over time (YOY-07 / DR-02)

#Claim / metricReport types comparedPer-period divergence (after normalisation)Trend in divergenceAudited-source preference applied (A-01B)Label
P5-1Target quality descriptorStatutory filing versus sustainability report versus climate report2021–2022: consistent, all three cite the external validation. 2023: corrected at rev 1.2: the sustainability report is *not* silent; it refers to "our long-term goals related to female representation and science-based climate targets" (E-58), a year after the last validation disclosure and with no supporting reference. 2024–2025: the filing says "science-based"; the sustainability report is silent; no climate report existsWidening: the supporting document was withdrawn while the claim was retained in the filingYes: the filing is primary, and it is the source carrying the unsupported descriptorConcern: D6-1
P5-2Target reliabilityStatutory filing versus sustainability report2021–2022: both framed as firm targets. 2023–2025: the filing carries both a bond covenant and a disclaimer of reliance; the sustainability report says "aspirational" and "remains the same"WideningYes: the filing governs, and it contains the internal conflictConcern: D6-2
P5-3Absolute target endpointClimate report versus sustainability report2022: 2.40 Mt / 4.00 Mt published. 2023–2025: no endpoint in any documentDivergence resolved by the endpoint disappearing from every sourceN/A: no source carries itConcern: D6-3
P5-4Emissions figuresSustainability report narrative versus performance data tables2025: the narrative names Category 10 as a driver of a decrease it did not produce, and attributes a Scope 2 fall to a consumption reduction that did not occurNew in 2025: no equivalent conflict identified in prior yearsYes: the data tables are the more granular source and are preferredConcern: D4-5, D3-7
P5-5Renewable electricitySustainability report narrative versus performance data tables2025: the Cadia agreement described as ~40% of site energy needs against 0 GJ renewable purchased electricity for AustraliaAppears in 2025 with the first full year of the agreementYes: the data tables are preferred; the narrative is unreconciledCannot verify: D3-4
P5-6Australian statutory emissionsStatutory register versus sustainability reportConsistent across the reviewed period after normalising for period and divested sitesStable: no divergenceYesNo divergence

*Prepared under the Climate Disclosure Review Rules v15.23 (controlled AI-assisted review). The body (§1–§7) states the verdict and may be issued on its own; the annexes are the working layer. General information only: not legal, financial or investment advice, an audit, an assurance opinion, or a NoCO2 certification or conformance determination. © Carbon Reduction Institute Pty Ltd, ABN 26 122 969 233.*

Annex L: How each score was reached

Each audience score is built from a fixed set of load-bearing criteria, marked before the score is set. "Partial" means the criterion is satisfied only with reader effort that this audience can reasonably spend, not a soft failure. The count matters as well as the score: a score can reach its floor on two failed criteria, so two reports sharing a score may sit some distance apart on the detail below.

IDAudienceCriterionVerdictWhy
A1Carbon accountingNo material category excluded (Scope 1/2/3, incl. downstream Scope 3 where material)PartialBoth rules that could defeat this criterion supply their own rebuttal test, and both are satisfied. *OUT-STK-13:* trigger (ii) fires, the Scope 3 total being outside the assurance scope; triggers (i) and (iii) do not, because Scope 3 is disclosed by GHG Protocol category and not by segment or in an unquantified residual. The rule's rebuttal is a full GHG-Protocol category breakdown, and Newmont publishes one, all fifteen categories carry a stated status in Methodology Table 3 and in the chart footnotes at SR2025 pp.74–75, the nine reported categories are given individually with five-year series, and they sum exactly to the disclosed total of 5,677,340 t. *S3-26 / optional categories:* the joint ventures' own Scope 3 is excluded, and the methodology's opening clause, "*Following the Technical Guidance for Calculating Scope 3 Emissions from GHG Protocol*": is accurate, investee Scope 3 being optional under that guidance. Under AMD-032, satisfying a rule's own rebuttal test makes the criterion pass on that limb and the workability test may not reopen it (D-042). Workable: the accountant lifts by category straight from the Performance Data Tables, reads Methodology Table 3 for the status of every one of the fifteen, and applies the disclosed bounds. Residuals recorded and not counted: the Category 1 exclusions are bounded on two different denominators: an estimated 8% of Category 1 and under 5% of total Scope 3 for the materiality exclusion, under 10% of purchased-goods spend for the data-constraint exclusion: and never converted to tonnes or combined; the excluded joint-venture Scope 3 block is unbounded, so its magnitude stays cannot-verify; and the Categories 11 and 12 basis couples a substantive industry-standards reason with "insufficient data granularity", which is a data reason rather than a relevance conclusion.
A2Carbon accountingA single reconcilable footprint (no competing totals)PartialWorkable: the accountant takes the site-level Scope 1 and 2 table and the Scope 3 category table in the Performance Data Tables, both of which sum exactly to the stated totals: 4,366,144 t on the market-based basis and 5,677,340 t of Scope 3: finds the same two figures in the Sustainability Report narrative at p.73 and in the assurance report's Table 9, and has one current-year footprint on one basis. Scope 2 is given on both a location and a market basis with the market basis identified as primary and as the target basis. There are no competing totals for CY2025. Residuals recorded and counted elsewhere: the 2018 and 2019 baselines have each moved twice: 3.57 → 5.4 → 5.0 Mt and 5.72 → 6.3 → 5.769 Mt: with no bridge published between the values, which is a target-progress problem for the investor rather than a lifting problem for the accountant and is counted at I2; and two footnotes in one worksheet contradict each other on whether Lihir energy is sold off-site, which puts about 3.0 million GJ, roughly 6% of reported energy consumed, in doubt in the energy series rather than the emissions series (counted at A3 as a reporting-basis defect).
A3Carbon accountingMethod, boundary and version transparency (incl. restatements disclosed)Not metThe reporting basis is described wrongly in the primary narrative document, and the effect of every method change is unquantified. Three limbs, none of which a reader action reaches. (i) The only Scope 3 chart in the Sustainability Report, p.75, footnotes its trailing series as removing "data from Telfer (sold by Newmont on December 4, 2024) only", with the ownership test fixed at 14 February 2025: against the Performance Data Tables footnote to the numerically identical series, which removes six sites and fixes the test at 31 December 2025. The plotted values follow the six-site basis, so the numbers are right and the stated basis is wrong, and the footnote is a verbatim carry-over from the 2024 report, February date included. (ii) The 2025 rebaselining is explained at SR2025 p.11 as reflecting the divestments "and the commencement of commercial production at Ahafo North", in a sentence that says the update "aligns with the process in our GHG Emissions Calculation Methodology": and the methodology says the opposite: "Organic growth (or decline) or permanent closure of an operation does not trigger recalculation of baseline year data. This includes … any greenfield projects that have not operated since the baseline year and then come into operation", then lists the six divestitures as the sole 2025 trigger. (iii) Four changes to how Scope 3 is calculated are disclosed without a quantified effect: three effective in the 2024 inventory (capital purchases reclassified to Category 2, "allocation expenditures" excluded, double-counted diesel spend removed), each stated to be individually under 5%, and a fourth effective in 2025, the shift to supplier- and product-specific factors "particularly in Categories 1 and 10": in exactly the two categories that between them produced the reported 5% Scope 3 decrease. A fifth, the quicklime process-emissions basis change "reported through 2023", sits behind about 0.068 Mt, roughly 12% of the whole five-year Scope 1 and 2 reduction. Not workable: the accountant can prefer the data tables and recover the correct restatement basis, but no reader action tells them which of two of the company's own documents governs recalculation, and none supplies five unpublished tonnage effects, so the largest Scope 3 category's four-year decline cannot be restated like for like. Recorded on the other side and not credited: the boundary, the gases, the AR6 warming potentials, the 5% recalculation threshold, the biogenic separation and the emission-factor source per site are all published, which is baseline for a discloser of this size.
A4Carbon accountingGranularity and assurance sufficient to lift into a third party's inventoryPartialWorkable: granularity is not the constraint. Scope 1 is split by fuel and by source across twelve sites, Scope 2 is given on both bases at site level, Scope 3 is given by category with a five-year series for each, and the assurance report's Table 9 states exactly which metrics are covered: so a third party lifts by category and applies its own assurance judgement to each, knowing which carry PwC's limited assurance under ISAE 3000 (Revised) and ISAE 3410 and which do not. Residuals recorded and not counted here: the engagement covers Scope 1, market-based Scope 2 and Categories 1, 2, 3 and 10: 60% of Scope 3: and expressly excludes Category 15 at 2.010 Mt, the largest single category at 35% and the only material one rising, the Scope 3 total, location-based Scope 2, the emissions-intensity metric and all earlier periods. That is assurance scope, not depth, and it is why this criterion does not pass outright; it does not defeat it, because the excluded metrics are individually disclosed and separately liftable, which is what this criterion asks.
I1Institutional investorsPhysical risk disclosed and financially linked or quantified (N-04)PartialSite-specific and active, stopping short of the financial limb. Workable: the investor takes the AR2025 climate-related risk factors, the site-by-site physical narratives in SR2025 pp.72–73, the disclosed methodology and guidance incorporating climate change into mine-life water balances, the Knipple Glacier access-road study at Brucejack, and the table identifying 986,185 t of Scope 1, 44% of the total, as subject to emissions-limiting regulation across six sites in three countries, and forms a directional exposure view that names the assets exposed and the regulated share. Assessed for relevance to the business model and methodology transparency only, not for modelling quality. Residuals recorded and not counted here: no physical risk carries a quantified financial effect anywhere in the reviewed set; the adaptation and resiliency roadmaps are the one phase of the company's own four-step process not yet completed; and the "comprehensive Climate Risk tables" the report directs readers to were not provided to this review, so the financial-linkage limb is cannot-verify under A-05 rather than established as absent.
I2Institutional investorsTransition risk: target credibility, absolute caps or visible / derivable headroomNot metThere is no endpoint to price against, and one of the three targets cannot be tracked at all. The 2030 targets are stated as percentages only. The absolute endpoints published in 2022: 2.40 Mt for Scope 1 and 2 and 4.00 Mt for Scope 3: have been withdrawn, together with the project-level abatement roadmap, the marginal abatement cost curve and the US$100/t internal carbon price, and nothing has replaced any of them; no standalone climate report has been published since. The intensity limb has no rebaselined baseline anywhere in current disclosure, so its headroom is not derivable by any reader, and no progress against it is stated. The baselines beneath the other two limbs have been recalculated twice, both times disclosed, moving the implied Scope 1 and 2 endpoint from 2.40 Mt to about 3.40 Mt while the targets table tells the reader "2030 target remains the same". The quality claim attached to them: "science-based" in the statutory filing: has no validation status stated in any 2023, 2024 or 2025 document, and the two rebaselinings both post-date the last confirmation. And the same filing that makes those targets the performance condition of a US$1bn 2.60% sustainability-linked note states they are "aspirational and subject to change" and that meeting the Scope 3 limb "should not be projected or relied upon". Not workable: headroom on two limbs is derivable and this review derived it, but no reader action supplies a baseline that has never been published, a pathway withdrawn three years ago, or a validation status stated nowhere.
I3Institutional investorsTarget achievement: met with real reductions, progress stated honestlyNot metThe reduction is grid decarbonisation and lower production, and the company's own account of it is wrong in two places. On the restated constant-portfolio series, Scope 1 and 2 fell 11.6% between 2021 and 2025 while production fell 14.2%; of the 11.6 points, about 7.3 are grid emission-factor decline on purchased grid electricity that was flat (17.28 → 17.37 million GJ, +0.5%), 3.0 track lower production and Scope 1 fuel, and 1.3 are contracted supply. Scope 1 is essentially flat at 2.407 → 2.259 Mt and worse per ounce. The one metric designed to control for production, emissions intensity, rose to a five-year high of 0.75 t/GEO and carries no progress statement. Against −32% and −30% the position after seven years is −12% and −1.6%. The narrative account does not hold: the Scope 3 decrease is attributed to "downstream processing of sold products", which rose 0.907 → 0.948 Mt, while the category that produced 71% of the fall goes unnamed; and the Scope 1 and 2 decrease is attributed to "reductions in diesel and electricity consumption" when purchased grid electricity rose 17.06 → 17.38 million GJ. Not workable: no reader action converts a grid emission factor into abatement, and none corrects an attribution the company has published.
I4Institutional investorsPortfolio / financed-emissions exposure completenessPassNot a financial institution, and the criterion is reached on the facts rather than disapplied. Newmont holds material non-operated interests in two partner-operated assets, and their equity-share Scope 1 and 2 is inside the inventory as Category 15 at 2,009,530 t, with the interests and percentages stated in the methodology: Nevada Gold Mines 38.5% and Pueblo Viejo 40%: and a five-year series published for the category. All other equity investments are assessed out against a stated two-limb test, quantitative on emissions size and qualitative on ability to influence. Counted elsewhere and not here: the joint ventures' own Scope 3 is excluded (A1), and the forward exposure the category carries is undisclosed (I2, I5).
I5Institutional investorsFlow-through / look-through exposure raised and quantifiedPartialSEC-INV-LT-17 and T-INV-01 both fire, and the current exposure is raised and sized. Workable: the investor takes Category 15 at 2.010 Mt with its five-year series (2.115 / 1.948 / 1.820 / 1.971 / 2.010), the two named investments and their equity percentages from the methodology, Newmont's own statement that the category "rose due to increases in their Scope 1 and 2 emissions", and the filing's concession that the Scope 3 target "is subject to the actions of entities not within our control", and sizes the inherited exposure precisely: 35% of the Scope 3 target base is a counterparty's emissions, rising in each of the last two years, inside a −30% target. Residuals recorded and counted elsewhere: no forward trajectory, bridge or fallback is disclosed for the category, and the quantified −0.720 Mt allocation the 2022 Scope 3 roadmap assigned to these two assets, together with the counterparty's identity and its own −30%-by-2030 commitment, have been withdrawn from disclosure while the category rose +0.190 Mt since 2023 (counted at I2); and the category is outside the assurance scope (A4). Magnitude of future headroom stays cannot-verify, no figure is manufactured.
I6Institutional investorsReconstructability by a sophisticated readerPassEvery finding in this review is derivable from Newmont's own published material, and that is the test. The Performance Data Tables carry the five-year series by scope, by fuel, by site, by Scope 3 category and by country, restated to a constant portfolio and footnoted line by line; the methodology carries the boundary, the recalculation policy and the emission-factor source for every site; the assurance report states the covered metrics; the Annual Report carries the target language, the bond linkage and the Boddington contract term. The review's decomposition of the 11.6-point fall, its derived production series: total energy divided by the disclosed energy-intensity rows, giving 6.78 M to 5.82 M gold-equivalent ounces, its identification of the flat purchased-electricity volume behind a falling location-based Scope 2, and its country-level renewable split were all built from those sources with no inference beyond arithmetic. This is a genuine pass, and it is why the institutional row is not driven lower than the two defeats already take it: the failures are of target architecture and of narrative attribution, not of opacity.
R1Retail investorsHeadline-to-evidence match without cross-document reconstructionNot metBoth reader-facing figures invert under decomposition, and the co-located material corrects one limb while getting another wrong. The OUT-STK-05 co-location escape was tested and it partly reaches: on the same page as the "12 percent reduction" the report states that "our 2025 energy and emissions intensities increased on a gold equivalent ounce (GEO) basis compared to 2024 due a reduction in overall production", which is a fair, legible correction of the production limb and is credited. It does not carry the criterion, for three reasons. The same sentence immediately substitutes a revenue-denominated intensity that fell because gold prices rose for the physical measure that moved adversely. The sentence two lines above attributes the fall to "reductions in diesel and electricity consumption" when purchased grid electricity rose. And the dominant driver: about 63% of the fall being grid emission-factor decline on flat purchased volumes: appears nowhere on the page or in any document. The second figure, "renewable energy accounts for 22 percent of our total purchased grid electricity", carries no compositional qualifier at all: all 3.89 million GJ of it sits in Canada, Peru, Ghana and Argentina, and Australia and Mexico record zero while producing 91% of market-based Scope 2. Not workable: recovering the position needs the Excel data pack, a production series derived from an energy-intensity row and a grid-factor separation the company does not perform, reconstruction this audience cannot do.
R2Retail investorsTargets cover the material sources; achievement stated honestlyNot metCoverage passes and honesty does not. The coverage limb is a genuine strength and is recorded as such: the three 2030 targets reach Scope 1, Scope 2 and the whole of reported Scope 3, including the joint-venture equity share, so no material disclosed source sits outside a target. The defeat is on the second limb. One of the three public targets: the 32% cut in Scope 1 and 2 emissions intensity: carries no baseline and no progress statement anywhere, while the company's own data tables show that measure rising to a five-year worst of 0.75 t/GEO. In the public-targets table the climate row states "2030 target remains the same" beside a baseline that has moved from 3.57 to 5.0 Mt, so the percentage is unchanged while the tonnage it implies has risen about a megatonne, and the absolute endpoint that would show it was withdrawn after 2022. Not workable: no reader action supplies progress against a baseline that has never been published, and none recovers an endpoint that is in no current document.
R3Retail investorsMaterial risks are legiblePartialWorkable: the retail reader takes the AR2025 climate-related risk factors, which state in plain terms that the targets are "aspirational and subject to change", that the coupon on a US$1bn note is linked to performance against them, that "a failure to meet our climate and sustainability targets will result in further expense", and that there may be "an insufficient supply of offsets" for the 2050 ambition; adds the SR2025 table identifying 44% of Scope 1 as subject to emissions-limiting regulation across six sites in three countries; and can see what the exposures are, if not their size. Residuals recorded and counted elsewhere: none of the filing's risk language appears in the Sustainability Report, which is the document this reader is likelier to open (R4); no physical risk carries a quantified financial effect and the risk tables were not provided (I1); and the delivery position on the three renewable projects the 2030 target depends on is presented as progress rather than as risk (R1).
R4Retail investorsCaveats findable, understandable and fairly presentedPartialWorkable: the qualifications a retail reader most needs are in the Sustainability Report itself and are in plain words. The targets are introduced at p.72 as "our 2030 aspirational greenhouse gas (GHG) reduction targets" and the 2050 position as an "ambition", not a commitment; the public-targets table at p.11 states the baselines were updated in the year and why; and the intensity qualifier sits at p.73 with the reduction claim it qualifies. The forward statements are hedged where they are made: "up to 70 percent", "over time", "aim to provide around 40 percent". Residuals recorded and counted elsewhere: the strongest disclaimer, that meeting the Scope 3 target "should not be projected or relied upon", appears only in the statutory filing (R3); the Boddington narrative omits that the incumbent supply contract runs to 2031 (R1, P2); and the renewable-share figure carries no compositional qualifier (R1).
P1Consumers & publicPublic claims literally true within their implied boundaryNot metTwo public statements are contradicted by the company's own data tables, and two more by its own governing documents. The test is literal truth within the implied boundary, and most of Newmont's claims survive it: "a 12 percent reduction from our 2018 baseline" is arithmetically correct, "22 percent of our total purchased grid electricity" states its own boundary in its own words, "carbon neutral by 2050" is labelled an ambition throughout, and the filing's "science-based" wording is a past-tense recount of the 2020 announcement that was accurate when made. Four do not survive. (i) "Our Scope 3 emissions decreased by 5 percent from 2024, driven by changes in product transportation and distribution and downstream processing of sold products": processing of sold products rose, 0.907 → 0.948 Mt. (ii) "Our Scope 1 and 2 absolute GHG emissions decreased by 4.7 percent compared to 2024, driven by reductions in diesel and electricity consumption": purchased grid electricity rose, 17.06 → 17.38 million GJ. (iii) The Scope 3 chart footnote states the trailing years remove Telfer "only" for a series that removes six sites. (iv) The rebaselining is said to "align with the process in our GHG Emissions Calculation Methodology" and to be caused in part by a greenfield project that the same methodology says does not trigger recalculation. Not workable: literal truth is not something a reader action restores.
P2Consumers & publicNo greenwashing or misleading composite impressionNot metThe composite is a company reducing its emissions, moving onto renewable power and heading for carbon neutrality; the numbers underneath run the other way. Against a "12 percent reduction" and "22 percent renewable": about 63% of the reduction is other people decarbonising the grids Newmont buys from, on purchased volumes that did not fall; production fell 14.2% and emissions per ounce are at a five-year high; no renewable electricity at all is recorded in Australia or Mexico, which produce 91% of market-based Scope 2; the largest single emitting site, Boddington at 905,944 t, buys its power from one named generator under a contract the Annual Report says "expires in 2031", a year past the 2030 target date, while the Sustainability Report presents a 2027 wind agreement as the site's future supply without mentioning the incumbent term; the largest Scope 3 category is a counterparty's emissions, rising, unassured, with the counterparty not named anywhere in the current report; and the roadmap, the cost curve, the internal carbon price, the absolute endpoints and the validation status were each published once and then withdrawn without explanation or replacement. This audience has the lowest caveat tolerance, and the corrections that exist sit in an Excel workbook and a 10-K risk-factor section. Stated as a claim-quality and misleading-risk concern; no allegation of misconduct is made.
P3Consumers & publicGenuine climate action visible versus inactionPartialThe finding against Newmont is not inaction, and three items are real, physical and disclosed. Workable: the public reader can see a signed long-term renewable power purchase agreement with a named counterparty, Collgar Wind Farm, for Boddington, the largest single emitting site, expressly contracting "electricity and green credits"; a delivered agreement at Yanacocha that takes that site's market-based Scope 2 to zero against 52,136 t location-based; and a fleet of 50-tonne battery electric haul trucks in service at Brucejack for several years in the largest Scope 1 activity, with the company evaluating expansion. Against that, and recorded as residuals: Boddington's new supply does not begin until 2027 and the incumbent contract runs to 2031; Yanacocha is about 2.5% of market-based Scope 2 and the certificate chain behind a reported zero is undisclosed; Brucejack's entire Scope 1 is 25,533 t, 1.1% of the group; Cadia's agreements are under review for "contractual issues … related to delays and project economics"; Tanami remains a study; the two off-grid heavy-fuel-oil sites, Lihir and Merian, carrying 30% of Scope 1, appear in no abatement description at all; and no tonnage, capital figure or delivery date attaches to any of it.
G1RegulatorsStandards compliance / readiness (AASB S2, Ch 2M, GHG Protocol, PCAF)PartialA year in which no mandatory climate-reporting obligation is engaged at all, and no standard the company claims is shown to be failed. Workable: the regulator reads a US-incorporated group that is not a Chapter 2M reporting entity, so AASB S2 and RG 280 do not apply to the parent for CY2025 and no compliance claim is made for the period, which is correct rather than creditable; an inventory stated to be prepared consistently with the GHG Protocol Corporate Standard, Scope 2 Guidance and Scope 3 Standard and Technical Guidance, named as the assurance criteria and assured against them under ISAE 3000 (Revised) and ISAE 3410; a published methodology carrying the boundary, the gases, the AR6 warming potentials, the 5% recalculation threshold and the emission-factor source for every site; GRI and SASB claimed in-accordance; and, decisively for this criterion, statutory filings that reconcile to the investor figures once the boundary and period are normalised: the two registered NGER controlling corporations report 630,365 t of Scope 1 and 1,316,264 t of location-based Scope 2 for FY2024-25 against 524,582 t and 1,264,803 t disclosed for calendar 2025, the difference explained by the July-to-June period and by Telfer, divested in December 2024, sitting inside the statutory year and outside the calendar one. PCAF is inapplicable. Residuals recorded as readiness or evidence rather than breach: the only climate-specific framework named is the retired 2017 version, with no successor referenced and the supporting index not provided (F-31, A-05); and the L-02 controlled-entity and NGER threshold limbs for the two Australian subsidiaries were not testable on the documents provided, so no obligation is asserted and no compliance finding made (D1-1b). Neither defeats the criterion, and the reason is stated: no obligation is engaged, no claimed standard is failed, and the regulator-facing numbers reconcile.
G2RegulatorsCross-source / audience consistencyNot metThe regulator-facing limb is clean, and this criterion falls on the entity's own documents disagreeing with each other. The clean part first: what Newmont reports to the Clean Energy Regulator reconciles to what it reports to investors on both Scope 1 and location-based Scope 2 once the period and the divested site are normalised, so there is no regulator-versus-investor divergence on the operational numbers. Against that, eight divergences survive normalisation, all internal to the company's own reporting suite. (i) The statutory filing carries the "science-based" descriptor; the sustainability report makes no such claim; the last supporting validation was disclosed in 2022, and the targets have been rebaselined twice since. (ii) The same filing makes those targets the performance condition of a US$1bn note and states they are "aspirational and subject to change" and that meeting the Scope 3 limb "should not be projected or relied upon": three characterisations of one set of targets, two of them in one document. (iii) The Scope 3 movement is attributed to a category that rose. (iv) The Scope 1 and 2 movement is attributed to an electricity consumption reduction that did not occur. (v) The Scope 3 chart footnote and the data-tables footnote state incompatible constant-portfolio bases for one identical series. (vi) The rebaselining reason given in the sustainability report is excluded by the company's own methodology in the sentence claiming alignment with it. (vii) Cadia is described as taking "approximately 40 percent of the site's energy needs" from a wind agreement while the data tables record 0 GJ of renewable purchased grid electricity for Australia. (viii) Two footnotes in one worksheet contradict each other on whether Lihir energy is sold off-site. Not workable: no reader action tells a regulator which of two of the company's own documents governs recalculation, which characterisation of the targets is operative, or which restatement basis the published series is on.