Not decision-useful for all five audiences, because no progress is stated against either target and no base-year value appears in the period's documents
This review tests Nickel Industries' publicly available climate disclosure against CRI's Climate Disclosure Review Rules, which use the CRI Net Zero Standard as the reference for a credible claim together with AASB S2 Climate-related Disclosures. It reflects the information available at the review date, states what the evidence supports, what it does not, and what would resolve each open point, and says "cannot verify", not "no issue", where evidence is missing. It is general information, not legal, financial or investment advice, and not an audit or an assurance engagement. It does not allege illegality, misconduct, greenwashing or dishonesty. Organisations may contact CRI at robc@noco2.com.au to identify an error, provide relevant public information or request review of updated disclosures. See Important information at the end of this report.
| Company | Carbon / supply-chain accounting | Institutional investors | Consumer / retail investors | Consumers & public | Regulators |
|---|---|---|---|---|---|
Nickel Industries Limited (ASX: NIC) | 1 | 1 | 1 | 1 | 1 |
The same disclosure can be reliable for one reader and misleading for another, so we rate decision-usefulness separately for each audience on the three-point scale below. There is no single pass/fail verdict — decision-usefulness is a judgement about each audience, not the report as a whole.
The bar below adds the five audience ratings into an overall score out of 15. It is used only to rank reports against one another — it carries no band and no verdict label. Its colour simply reflects the mix of the five ratings: the more red, the more audiences the disclosure falls short for.
This review assesses whether the company's climate disclosure is *decision-useful*: whether a reader can actually rely on it for the decision they are making. Because a disclosure that is sound for one reader can mislead another, we score decision-usefulness separately for each of the main audiences that rely on climate disclosure. The audiences, and what each needs from the disclosure, are the same across all our reviews:
| Audience | What they rely on the disclosure for |
|---|---|
| Carbon / supply-chain emissions accounting | Lifting the company's emissions figures into their own inventory. They need complete category coverage (nothing material excluded), a single reconcilable footprint, and a disclosed, transparent method. Whether a figure is estimated or supplier-specific is a maturity question, not a fault; the fault is exclusion. |
| Institutional investors | Pricing climate risk (physical and transition) including target credibility and whether targets are being met with real reductions, the completeness of financed / portfolio exposure, and flow-through exposure inherited from investees or counterparties whose own emissions may be growing. They can usually reconstruct detail, so they are judged on whether the true position is derivable. |
| Consumer / retail investors | Understanding the company's climate position and target progress without expert reconstruction. They need the headline claims to match the evidence, the material sources to be targeted, and caveats to be easy to find. |
| Consumers & public | Knowing whether the company's public claims are true: that it is genuinely acting rather than greenwashing, and not fuelling climate change while presenting otherwise. Headline claims matter most to this audience, which is least able to read past a buried caveat. |
| Regulators | Whether the disclosure is compliant, consistent across sources and audiences (does the company say one thing to one audience and something else to another), and useful across the board. |
The overall score is simply the sum of the five audience ratings, out of 15. It has no band and no pass/fail label; we use it only to rank reports against one another; its colour bar reflects the mix of the five ratings (the more red, the more audiences the disclosure falls short for). §2.1 gives each audience's rating and the reason behind it; §1 covers scope and basis, §2.2–2.3 the evidence dashboard, §3 what the disclosure means for a reader (what's counted, financed-emissions detail, real-vs-accounting movement, trajectory), §4 the findings, §5 disclosure-risk, §6 how to fix it and §7 the conclusion; the working annexes show the rule-level derivation.
Two conventions apply throughout. A certification (including the Australian Government's Climate Active program) is treated as a claim to be tested, not as a strength in itself. Detailed disclosure and candour about a company's own gaps are the baseline expected of a credible discloser, not a credit.
| Document | Reviewed? | If missing, effect on this review |
|---|---|---|
| Re-issued AASB S2 Sustainability Report for the year ended 31 December 2025 (ASX release, 10 March 2026, 34 pages) | Yes: the primary statutory disclosure under review | |
| 2025 Annual Report (released 24 April 2026), incorporating the AASB S2 Sustainability Report, the Directors' Report, the audited Remuneration Report and the audited financial statements | Yes | |
| Independent Auditor's Review Report on specified sustainability disclosures (KPMG, 10 March 2026) | Yes | |
| 2025 Sustainability Report (voluntary; GRI and SASB referenced; assurance statement by PT Sejahtera Rambah Asia, 11 May 2026) | Yes | Carries the emissions-intensity metric and the fuel and energy data that the statutory report does not |
| 2024 Sustainability Report (year ended 31 December 2024) | Yes: prior period, as context | Source of the multi-period series and of the decarbonisation pathway |
| 2023 Sustainability Report (year ended 31 December 2023) | Yes: prior period, as context | Records the target announcement at COP28 |
| 2022 Sustainability Report (year ended 31 December 2022) | Yes: prior period, as context | Source of the target base-year intensity value |
| AASB S2 Sustainability Report as originally released on 23 February 2026 | Excluded: superseded by the 10 March 2026 re-issuance | Superseded by the 10 March 2026 re-issuance. The omission it contained, and its remedy, are disclosed in the re-issuance and in the auditor's Emphasis of Matter |
| GHG inventory methodology document or calculation workbook | Not provided | Emission factors are named at source-category level only, so factor-level reconciliation is limited and the product-carbon deduction cannot be sized |
| Standalone Net Zero Roadmap | Not published: as a standalone document; investor centre, company-reports page and sustainability page checked 3 September 2026 | Checked the company's investor centre, company-reports page and sustainability page on 3 September 2026. The pathway detail published in the 2024 report is not carried forward |
| Climate Active or other carbon-neutral certification documentation | Not applicable | No carbon-neutral, net-zero-achieved or renewable-electricity claim is made for the period |
The corpus is scoped to CY2025 and earlier. The half-year financial report released on 26 August 2026 covers a later period and was deliberately excluded.
| Standard / framework | Referenced by company? | How strongly | Sector module(s) applied |
|---|---|---|---|
| Corporations Act / Ch 2M | Yes | Binding: "prepared in accordance with the Corporations Act 2001", with a directors' declaration under sections 296C and 296D | Mining |
| AASB S2 | Yes | In accordance with: "prepared in accordance with the Australian Sustainability Reporting Standards", first mandatory year, with the paragraph C3 and C4(b) transition reliefs taken | Mining |
| ASIC RG 280 | No | Not referenced: applies as regulatory guidance on sustainability reporting and on forward-looking statements | Mining |
| GHG Protocol (Corporate / Scope 2 / Scope 3) | Yes | In accordance with: the Corporate Standard (2004) is named as the calculation basis; Scope 2 location-based only; the Scope 3 Standard is not engaged for the period | Mining |
| PCAF (financed emissions) | No | Not applicable: not a financial institution | Not applicable |
| SBTi | No | Not referenced: no science-based or Paris-aligned label is claimed. Both targets are expressly "not validated" | Not applicable |
| Climate Active / other carbon-neutral framework | No | Not referenced: no carbon-neutral claim is made | Not applicable |
| Certificates (GreenPower / LGC / ACCU / REC) | No | Not referenced: no certificates or credits are used: "Other forms of carbon reduction such as carbon credits are also being considered but are not currently being used" | Not applicable |
| Other (company-referenced) | Yes: GRI Universal Standards, SASB Metals and Mining, ISO 14064-1:2018 (in the prior period), AA1000AS v3 and AA1000AP (2018) for the voluntary report's assurance, IPCC 2019 Refinement for emission factors, IPCC SSPs and NGFS scenarios | With reference to: referenced, and tested only where a figure or claim rests on them | Mining |
This is a standard review of Nickel Industries' first mandatory climate disclosure, run against the reviewed period's statutory report and the voluntary and audited documents published alongside it, with the four preceding Sustainability Reports used as context for the multi-period picture. The inventory methodology workbook was not provided, so emission factors could be tested only at the source-category level and the product-carbon deduction applied to Scope 1 could not be sized. Assurance over the statutory disclosures is limited in level and narrow in scope: it covers the governance disclosures, three strategy subparagraphs and the Scope 1 and Scope 2 figures, and does not extend to the targets, the quantified financial effects or the scenario analysis. Two of the report's own quantified physical-risk hazards are expressly not quantified by the company, and no market-based Scope 2 position exists for any year. Where the company's figures could not be reconciled from the documents reviewed, the review records "cannot verify" and says what would resolve it; it does not assess the scientific quality of the company's climate modelling.
What the company should fix first: publish the 2022 base-year intensity and the current-year intensity side by side in the statutory report, with the movement stated plainly and the boundary change named, so that both targets become measurable.
| Dimension | Rating | Justification |
|---|---|---|
| Headline claim ↔ evidence match | 1/5 | The two headline commitments carry no baseline figure, no current figure and no progress statement in the statutory report |
| Disclosure quality | 5 / 15 overall | Strong on risk narrative and scenario inputs; the metrics section is four rows and two target tables with several cells reading "Nil" |
| Inventory completeness (Scope 1/2/3) | 1/5 | Scope 1 and location-based Scope 2 only; no market-based basis; Scope 3 absent under the first-year relief; the 44% investee excluded |
| Financed-emissions completeness (if FI) | N/A | Not a financial institution |
| Target credibility | 1/5 | Intensity target with no interim milestone, no published baseline value and no monitoring metric for the absolute target; neither validated; the pathway withdrawn |
| Real reduction vs accounting movement | 1/5 | Reported emissions rose 18.3% while non-electric energy was flat and electricity fell 18.9%; the split is not disclosed |
| Offset / certificate / renewable integrity | N/A | No credits, certificates or renewable-electricity claim for the period |
| Assurance coverage vs claim | 2/5 | Limited assurance over Scope 1, Scope 2, governance and three strategy subparagraphs; targets and quantified financial effects are outside scope |
| Standards / compliance confidence | 2/5 | Reliefs lawfully taken and declared; performance against target is required and not given; the directors' declaration was omitted from the first release and added by re-issuance |
| Comparability (like-for-like only) | 1/5 | Calculation standard, factor source, fuel taxonomy and boundary all changed against the prior published inventory, with no restatement |
| Reader accessibility | 2/5 | Risk tables are legible and quantified; the emissions and target sections require three other documents to interpret |
| Evidence limitations | 2/5 | No methodology workbook; no intensity denominator stated; excluded sources neither named nor bounded |
| Area | Rating | Basis |
|---|---|---|
| Corporations Act / Ch 2M | Appears broadly compliant: minor limitations | Directors' declaration given under sections 296C and 296D in the re-issued report. It was omitted from the release of 23 February 2026 and added on 10 March 2026, which required a superseding auditor's report and is disclosed in an Emphasis of Matter |
| AASB S2 | Potential compliance concern | Paragraph 35 requires information about performance against each climate-related target and an analysis of trends or changes in performance. No performance or trend information is given for either target, and the target disclosures sit outside the assured scope. The paragraph C3 and C4(b) reliefs are lawfully taken and are not the basis of this rating |
| ASIC RG 280 | Cannot verify: material evidence missing | Forward-looking statements (the 2035 and 2050 targets, the quantified 2030 to 2050 financial effects) are published without a disclosed basis for the target pathway; the reasonable-grounds record was not provided |
| GHG Protocol / Scope 2 / Scope 3 | Potential compliance concern | The Corporate Standard (2004) is named. Scope 2 is reported location-based only, with no market-based figure and no statement that no contractual instruments are held. Scope 3 is not engaged for the period under the relief |
| PCAF / financed emissions | Not applicable for the period | Not a financial institution |
| Carbon-neutral / net-zero framework | Not applicable for the period | No carbon-neutral or net-zero-achieved claim is made; the 2050 net-zero target is a forward commitment |
| Certificates / credits | No apparent issue | No certificates or credits are used, and the report says so plainly |
| Other company-referenced framework | Cannot verify: evidence not provided | GRI and SASB indices are published and the voluntary report carries a moderate-level AA1000 assurance statement, whose scope excludes forward-looking statements and financial data. ISO 14064-1:2018, named as a calculation basis in the prior period, is not carried forward and the change is not explained |
Basis: the year ended 31 December 2025, on the equity-share organisational boundary the company names as its primary boundary, as published in the re-issued AASB S2 Sustainability Report (folio 61). Scope 1 and Scope 2 are each disclosed in two rows, for consolidated entities and for equity accounted investees; the figures below combine those rows and the combination reconciles to 7,862,123 tCO₂e in total. The company's performance highlights state the same total as 7,849,014 tCO₂e; the difference is unreconciled and is finding F-9. Scope 3 is not disclosed for the period: the company applied the AASB S2 paragraph C4(b) first-year relief, which is a permitted election and is not treated here as a compliance failure, but every Scope 3 line below is therefore absent from the figures a reader has. Materiality in the fourth column is a judgement about the category, drawn from the company's own description of its business and its disclosed fuel, purchase and investment activity, not a measurement.
| Scope / category | Status | Quantified (tCO₂e) | Material? | Note |
|---|---|---|---|---|
| Scope 1: combustion / fugitive / fleet | Reported | 4,098,940 | Yes | 4,055,322 consolidated entities plus 43,618 equity accounted investees. Not broken down by source; the prior period split it into stationary combustion, mobile combustion and a negative carbon-fraction-in-product line. A deduction for carbon held in nickel pig iron is retained in the method table but not sized, so gross Scope 1 is not recoverable |
| Scope 2: electricity (location-based) | Reported | 3,763,183 | Yes | 3,743,827 consolidated plus 19,356 equity accounted investees, on 4,354 GWh of purchased electricity from the coal-heavy Sulawesi and IMIP grids. Implied grid factor about 0.86 kgCO₂e/kWh |
| Scope 2: electricity (market-based) | Not disclosed | Not disclosed | Yes | No market-based figure is published for any year, and the report does not state whether any contractual instruments are held. The two Scope 2 bases are not additive; only the location-based figure enters the total |
| Scope 3 C1 Purchased goods & services | Excluded | Not disclosed | Yes | Not disclosed for the period under the first-year relief. The company consumed about 1.59 million tonnes of coal, 285 million cubic metres of coking oven gas and 10,465 tonnes of electrode paste in the year, all purchased |
| Scope 3 C2 Capital goods | Excluded | Not disclosed | Yes | Not disclosed under the relief. US$1,012.0 million was invested in the Excelsior Nickel Cobalt project during the period |
| Scope 3 C3 Fuel- & energy-related | Excluded | Not disclosed | Yes | Not disclosed under the relief. Upstream of 1.59 million tonnes of coal and 4,354 GWh of purchased electricity |
| Scope 3 C4 Upstream transport & distribution | Excluded | Not disclosed | Yes | Not disclosed under the relief. Bulk coal and ore movement into the Indonesia Morowali Industrial Park |
| Scope 3 C5 Waste | Excluded | Not disclosed | Cannot verify | Not disclosed under the relief. The IMIP tailings facility is not owned or operated by the company |
| Scope 3 C6 Business travel | Excluded | Not disclosed | No | Not disclosed under the relief; immaterial beside a 7.86 million tonne footprint |
| Scope 3 C7 Employee commuting | Excluded | Not disclosed | No | Not disclosed under the relief; 4,699 employees at co-located industrial-park sites |
| Scope 3 C8 Upstream leased assets | Excluded | Not disclosed | Cannot verify | Not disclosed under the relief; leasing arrangements within the industrial park are not described |
| Scope 3 C9 Downstream transport & distribution | Excluded | Not disclosed | Yes | Not disclosed under the relief. Product is shipped to a buyer market concentrated in China |
| Scope 3 C10 Processing of sold products | Excluded | Not disclosed | Yes: probably the largest single category | Not disclosed under the relief. Nickel pig iron is sold for processing into stainless steel by large mills, which the company identifies as its customer base. This is the category a customer or a supply-chain accountant most needs, and it is absent |
| Scope 3 C11 Use of sold products | Not relevant | Not applicable | No | Nickel in stainless steel and in battery precursors has no use-phase combustion emissions of its own |
| Scope 3 C12 End-of-life of sold products | Not relevant | Not applicable | No | Nickel is recovered in the stainless and battery recycling loops rather than disposed of |
| Scope 3 C13 Downstream leased assets | Not relevant | Not applicable | No | No downstream leasing described |
| Scope 3 C14 Franchises | Not relevant | Not applicable | No | No franchising |
| Scope 3 C15 Investments / financed & facilitated | Reported within Scope 1 and Scope 2 | Included in the Scope 1 and Scope 2 figures above (62,974 for Huayue Nickel Cobalt at 10% equity) | Yes | Under the equity-share boundary an investee's emissions enter Scope 1 and Scope 2 at the equity share rather than Category 15, so Huayue Nickel Cobalt is counted and is not a separate addition. Excelsior Nickel Cobalt, at 44% and US$1,012.0 million, is excluded on the basis that assets not in the operational phase are not included, so no emissions are reported for it and none are estimated |
N/A: not a financial institution.
The reviewed period's emissions rose while the energy behind them did not. Scope 1 and Scope 2 are decomposed separately below, and the year-on-year comparison uses the company's own published prior-period figures. The comparison is itself affected by the changes it identifies: the calculation standard, the emission-factor source and the fuel taxonomy all changed between the two published inventories and no restatement was issued, which is why several drivers below are recorded as not derivable rather than quantified.
| Reported change | Driver | Real-world reduction? |
|---|---|---|
| Scope 1 and 2 combined, CY2024 to CY2025: 6,644,501 to 7,862,123 tCO₂e, up 18.3% | Cannot verify: split not derivable. Non-electric energy was flat (38,297,248 to 38,369,207 GJ, up 0.2%) and purchased electricity fell 18.9%, so the increase does not track energy use. Candidate drivers, none quantified by the company: the factor source moved from the GHG Protocol stationary-combustion tool to the 2019 Refinement of the 2006 IPCC Guidelines; the fuel taxonomy was re-cut; and Huayue Nickel Cobalt was added to the boundary (62,974 tCO₂e, 0.9 percentage points of the rise) | No: the movement is not shown to be physical, and the company does not attempt the split |
| Scope 1: 2,934,253 to 4,055,322 tCO₂e, up 38.2% | Cannot verify: non-electric energy up 0.2%, so implied emissions per gigajoule rose from 76.6 to 105.7 kg, up 37.9%. Coking oven gas, anthracite coal, sub-bituminous coal and land-use deforestation and reforestation appear as source categories in the method table for the first time. Not explained | No: an increase, and its cause is not disclosed |
| Scope 2 location-based: 3,710,248 to 3,743,827 tCO₂e, up 0.9% | Mixed: purchased electricity fell from 5,367.8 to 4,354.1 GWh, down 18.9%, while the implied grid factor rose from 0.691 to 0.860 kgCO₂e/kWh, up 24.4%. The volume fall is real; the flat reported outcome is a factor effect that cancels it | Partly: consumption fell in the real world, and the reported figure does not show it |
| Scope 2 market-based | Not applicable: not disclosed for any year. No contractual instruments are reported, so no market-based movement can be assessed | Cannot verify: no market-based figure is published |
| Emissions intensity: 65 to 72 tCO₂e per tonne of nickel, up about 11% | Cannot verify: the CY2025 figure includes Huayue Nickel Cobalt for the first time. That operation is far less emissions-intensive than the company's rotary kiln electric furnace plants, so its inclusion lowers the blended figure. On the boundary used for CY2022 to CY2024 the CY2025 figure derives to 78.0 | No: movement is away from the target on either basis, and the boundary addition flatters the published number |
| Scope 1 and 2 against the CY2022 target base year: 3,584,263 to 7,862,123 tCO₂e, up 119.3% | Activity: largely capacity growth. Angel Nickel and Oracle Nickel reached full operation after CY2022 and equity nickel output rose from 56,063 to 108,476 tonnes, up 93.5%. The residual is factor, method and boundary change. This growth is the reason the flagship target is expressed as an intensity | Increase: growth-driven, and fairly so. It matters because the 2050 target is an absolute one with no interim milestone |
| Purchased electricity: 5,367.8 to 4,354.1 GWh, down 18.9% | Real abatement: a lower purchased volume. Nickel production fell only 1.8%, so volume alone does not explain it, and the cause is not disclosed. Candidates the company describes elsewhere include the switch to coking oven gas and process optimisation | Yes: on volume, though the emissions benefit is offset by the factor movement above |
| Biodiesel energy: 488,945 to 453,311 GJ, down 7.3% | Real abatement: fleet electrification. The electric haul-truck fleet at Hengjaya Mine went from 8 to 37 units and electric loaders, excavators and a forklift replaced diesel units at the processing plants. The blend also moved from B30 to B35 | Yes: it is evidenced. Mobile fuel was 17,985 tCO₂e in the prior period, about 0.3% of the footprint, so the effect on the total is small |
Four reporting periods and three report types are available, and together they show a company whose reported emissions and reported intensity have both risen since the base year its targets are measured from. Absolute Scope 1 and 2 have grown 119% since CY2022, which tracks the commissioning of new processing capacity and is the reason the near-term target is expressed as an intensity. The intensity has risen too: from 63.93 tonnes of CO₂e per tonne of nickel in CY2022 to 72 in CY2025, and to a derived 78.0 on the boundary the earlier years were measured on, against a target that requires about 32 by 2035. None of that movement is stated in the reviewed period's disclosure, and the figure the target is measured in appears only in the voluntary report, as a single number with nothing beside it. The company's disclosure has also thinned in the year the numbers turned: the three-year emissions comparative table, the split of Scope 1 by source, the nickel production volume, the emissions-per-revenue metric and the quantified decarbonisation pathway were all published in the CY2024 report and none appears in the CY2025 suite. Against that, the risk disclosure has clearly deepened: the physical and transition hazards are now individually priced by decade, which the earlier reports did not do. The direction of travel in the underlying figures is real growth in output and, so far as the disclosure allows anyone to tell, accounting and factor movement layered on top of it, with the split not derivable (see §3.3).
Metrics over time
| Metric | CY2022 | CY2023 | CY2024 | CY2025 | Movement | Driver | Note |
|---|---|---|---|---|---|---|---|
| Scope 1 (tCO₂e) | 1,770,086 | 3,193,569 | 2,934,253 | 4,098,940 | Up: 132% since CY2022 | Mixed: growth to CY2023, then a 38% rise in CY2025 on flat non-electric energy, not derivable | CY2025 adds equity accounted investees; earlier years cover the mine and four processing plants only. Source-level split dropped in CY2025 |
| Scope 2 location-based (tCO₂e) | 1,814,177 | 3,440,250 | 3,710,248 | 3,763,183 | Up: 107% since CY2022, flat in CY2025 | Grid factor: the CY2025 movement is a factor effect; consumption fell 18.9% | Implied grid factor moved from 0.691 to 0.860 kgCO₂e/kWh with no restatement or explanation |
| Scope 2 market-based (tCO₂e) | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable | No contractual instruments reported |
| Scope 3 total (tCO₂e) | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable | Never disclosed. The GRI index has referenced disclosure 305-3 since CY2024 without a figure behind it; the first-year relief applies to CY2025. By category in Annex K |
| Emissions intensity (tCO₂e per tonne of nickel) | 63.93 | 65 | 65 | 72 | Up: about 13% against the base year, and away from the target | Cannot verify: the boundary addition flatters the latest figure; on the earlier boundary it derives to 78.0 | Three-year comparative table published in CY2024, dropped in CY2025. Denominator never stated |
| Renewable electricity (% of consumption) | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not disclosed: no group-level series | Not applicable | At CY2025, solar supplies about 20% of one mine site's electricity: real at the site level. The 262 MWp solar and 80 MWh battery project reached financial close on 23 January 2026 to supply the Excelsior Nickel Cobalt project, on a 25-year fixed-tariff agreement; capacity was stated as 255 MWp in CY2024 |
| Certificates and offsets retired (tCO₂e) | 0 | 0 | 0 | 0 | Flat: no credits used in any period | Not applicable | Published as nil. "Other forms of carbon reduction such as carbon credits are also being considered but are not currently being used" |
Targets and claims over time
| Target or claim | As first stated (period) | As stated for CY2025 | Change | Explained? | Note |
|---|---|---|---|---|---|
| 50% carbon intensity reduction by 2035 (Scope 1 and 2, base year 2022) | Announced at COP28, December 2023: 50% intensity reduction by 2035, base year 2022, Scope 1 and 2 (CY2023) | Restated unchanged, with no milestones and no pathway | Unchanged: in wording, less supported in substance | Not applicable | The CY2024 report carried a quantified pathway: 37 of the 50 percentage points from HPAL acquisitions, 13 from low-carbon power, 3 from production changes and 3 from carbon and energy management. The pathway chart and the Net Zero Roadmap section are not in the CY2025 suite. Target 1a's stated period is 2025 to 2035 against a 2022 base period |
| Net zero by 2050 (Scope 1 and 2, base year 2022) | Announced at COP28, December 2023: net zero by 2050, base year 2022, Scope 1 and 2 (CY2023) | Restated unchanged, with no milestones, no monitoring metric for the absolute target and no pathway | Unchanged: in wording, less supported in substance | Not applicable | Neither target is validated by a third party, which the company states |
| Carbon-neutral / net-zero achieved claim | No achieved claim (CY2022) | No achieved claim; net zero is a 2050 commitment | Unchanged | Not applicable | No achieved claim in any period reviewed |
The disclosure's largest exposure is not what it says but what it leaves unsaid on a metric the company itself chose. Nickel Industries has publicly committed, since COP28, to halving its carbon intensity by 2035 against a 2022 baseline, and it restates that commitment in a statutory report signed under a directors' declaration. On the company's own published figures that intensity has risen every year since the baseline, and this year's disclosure carries neither the baseline value, the current value, nor any statement of movement, while the quantified pathway published a year earlier has been removed from the suite. The single biggest driver of exposure is therefore the combination of a live, board-approved, publicly repeated forward claim with the withdrawal of the information a reader would use to test it, in the period the underlying figure moved the wrong way. Beside that sits a narrower but sharper regulatory point: performance against each target and an analysis of trends is a disclosure the standard requires, and it is absent for both targets, in a section of the report the assurance does not reach.
| Lens | Exposure | Confidence | What drives it | What would reduce it |
|---|---|---|---|---|
| Legal (misleading-conduct / disclosure / director-duty) | Elevated | Medium to high | A commitment repeated in a director-declared statutory report, with the base-year value, the current value and the movement all absent, while the company's own earlier reports show the metric rising about 13% and the supporting pathway has been withdrawn (findings F-4, F-5, F-8). A second, narrower exposure is a governance statement that the same annual report contradicts (F-12) | Publishing the movement against the baseline in the statutory report, and correcting the review-cadence statement |
| Regulatory (ASIC / ACCC / Clean Energy Regulator / AASB S2) | Elevated | High | Performance against each target and a trend analysis is required and is not given for either target, in a section outside the assured scope (§2.3, F-4). The directors' declaration was omitted from the release of 23 February 2026 and added by re-issuance on 10 March 2026, requiring a superseding auditor's report and an Emphasis of Matter. Forward-looking quantifications from US$283 million to US$411 million are published without a disclosed basis (F-26) | Adding the target-performance and trend disclosure, and documenting the reasonable-grounds basis for the quantified effects and the target pathway |
| Technology (dependence on unproven abatement) | Elevated | High | Over half the 2035 target rested on a single HPAL project that has slipped a year, the pathway showing that has been withdrawn, and the mitigations named against the largest quantified exposure are three investigations and a laboratory-stage phytomining concept described as producing "carbon-negative nickel" (F-8, F-11, F-18). Coal reductant and process heat, which dominate Scope 1, have no disclosed pathway | A wedge-by-wedge pathway with sized, dated and costed measures, and a separate Scope 1 pathway for reductant and process heat |
| Physical (physical-risk disclosure consistency) | Moderate | Medium | The physical-risk disclosure is the most fully quantified part of the report, but its figures are unassured, two hazards are unquantified, and none of it reaches the financial statements, which contain no reference to climate at all against a self-identified 35% of total assets exposed (F-15, F-1's qualification) | Carrying the physical-risk assumptions into the financial statements' key estimates, and quantifying or bounding the two open hazards |
| Other: market and commercial access | Moderate to elevated | Medium | The company names the risk itself: European border-adjustment and battery-passport rules that price embodied emissions "could reduce the demand from Nickel Industries products", against a buyer market concentrated in China. Its own intensity is rising, its Scope 3 is unpublished, and its product-level carbon figures are not disclosed at the level such rules require | A verified product-level carbon footprint per tonne of nickel by product route, and a disclosed Scope 3 position for downstream processing |
| Claim / metric | To the regulator | To investors / public | Consistent after normalising boundary? |
|---|---|---|---|
| Scope 1 and Scope 2 total, CY2025 | Four rows summing to 7,862,123 tCO₂e in the director-declared, KPMG-reviewed statutory report | 7,849,014 tCO₂e in the performance highlights of the voluntary report, which reproduces the statutory table later in the same document | No: a 13,109 tCO₂e difference that the disclosed components do not reproduce, in one document |
| Carbon intensity, the metric the 2035 target is written in | Not disclosed in the statutory report | 72 tCO₂e per tonne of nickel, as a single figure in the voluntary report's highlights, with no comparative and no denominator | Not testable: the statutory report does not carry the figure at all, and the baseline appears in neither document |
| Review cadence for the net-zero target | "Reviewed quarterly by the Risk Management and Sustainability Committee" in the statutory report; the Directors' Report in the same annual report records two meetings held against a charter requiring at least four | Same statement, same document | No: the two statements are in the same annual report and cannot both hold |
| Connectivity with the financial statements | Asserted: the report "makes connections with other reports, including the financial statements, to present a cohesive view" | The audited financial statements and their notes contain no reference to climate | No: the connection asserted is not present in the statements referred to |
| Nickel production volume | Disclosed in the audited Review of Operations: 124,966 tonnes | Not disclosed in the sustainability suite, where it was published for three years to CY2024 and is the denominator of the target metric | Yes: reconcilable, but only by moving between documents and applying equity shares the company does not state |
| Emission-source completeness | "No new Scope 1 or Scope 2 emission sources were identified or added to the emissions inventory during the reporting period" | The methodology table lists coking oven gas, anthracite coal, sub-bituminous coal and land-use deforestation and reforestation, none of which appears in the prior year's published inventory taxonomy, and the company's own narrative records coking oven gas being extended to two further plants in the fourth quarter | Cannot verify: the statement may be read as referring only to changes within the period, and the company does not say which |
| NGER statutory reporting | Not a controlling corporation on the register: operations are wholly Indonesian | Emissions reported are wholly Indonesian, consistent with the register position | Yes: absence from the register is not evidence of zero emissions and is immaterial here |
| Finding | Review finding (why it matters) | NoCO2 mechanism | Document / clause | Required evidence | Likely NoCO2 outcome |
|---|---|---|---|---|---|
| F-4 / D6-01: no progress or base-year value published for either target | The two commitments the disclosure leads with cannot be tested by any reader from the disclosure itself | Reduction-obligation progress reporting: a published progress series against a fixed base year, with the metric and its denominator stated | 5.1.11 Reduction Obligation Progress; 5.1.10 Emissions Tracking (Tables 6 and 7); 4.9.2 Metrics & Targets (base-year consistency) | The CY2022 base-year inventory and intensity, the CY2025 equivalent on the same boundary, and the progress calculation | Critical non-conformance until the progress series is published; resolvable at 6.2.2 |
| F-5 / D6-02: intensity risen about 13% since the base year, undisclosed, with a boundary addition flattering the current figure | A live public commitment is restated while its own metric moves away from it, and the reader is given neither the movement nor the boundary change | Base-year consistency with mandatory recalculation on a structural boundary change, and emissions tracking that shows the series | 4.9.2 Metrics & Targets; 4.3 Initial Year & Reporting Period; 5.1.10 Emissions Tracking | Recalculated CY2022 to CY2024 on the current boundary, or CY2025 presented on both, with the equity shares applied | Non-conformance on base-year consistency until recalculated |
| F-6 / D6-03: absolute emissions up 119% against an absolute 2050 target with no milestone and no monitoring metric | An absolute net-zero commitment over a footprint that has more than doubled, with nothing for a reader to judge it against | A dated reduction trajectory with interim obligations, and net-zero status conditions that must be met before the claim is used | 4.7 Reduction Obligations; 4.7.4 Accelerated Reduction Timeline; 4.7.5.1 Net Zero Committed | The trajectory, the interim milestones, the monitoring metric and the governance approval | Net Zero Committed status unavailable until a trajectory with interim obligations exists |
| F-7 / D2-03, D3-02: undisclosed method, factor and boundary change behind an 18.3% increase on flat energy | A reader cannot separate what the company emitted from what it recounted, on the figure everything rests on | Restatement transparency in the emissions-tracking series, with the methodology and factor basis declared | 5.1.10 Emissions Tracking; 4.5.5 Methodology; 4.6.3 Financial and data reconciliation | The prior year restated on the current method and factor set, and a component split of the movement | Non-conformance on restatement disclosure until published |
| F-8 / D6-04, D6-05: pathway withdrawn in the year its largest wedge slipped a year | The only published account of how the 2035 target would be met has gone, and the deferral is unquantified | Required Interventions scheduled with dates, so the pathway is an obligation rather than a chart, plus progress reporting against it | 4.7.1 Required Interventions (RIS); 4.7 Reduction Obligations; 5.1.11 Reduction Obligation Progress; Annex A illustrative examples | The wedge-by-wedge pathway with each measure sized, dated and costed, restated for the deferral | Critical non-conformance while the reduction obligations are undated and unscheduled |
| F-9 / D2-01, D2-02: two totals for one footprint, and a unit header wrong by a factor of one million | Anyone lifting the figure must choose between two published totals with nothing to choose on | A single inventory table presentation with the components summing to the declared total, tested at conformance | 5.1.8 GHG Inventory Table; 6.2.1 Conformance assessment; 4.5.4 Quantification | One total with its components, and the corrected unit | Non-conformance on inventory presentation; the kind of defect the conformance assessment exists to catch pre-publication |
| F-10 / D4-01, D4-02, D8-06: Scope 3 wholly absent and both targets Scope 1 and 2 only | The processing of the company's own product, its largest likely category, sits outside every figure and every commitment | Mandatory category coverage against a declared materiality threshold, with net-zero attribution settled by category | 4.5.3 GHG Emission Categories (Table 3); 4.5 GHG Inventories; Annex B Net Zero Attribution of GHG Protocol Categories; 5.1.14 Data Quality & Scope 3 Improvement | A category-by-category assessment with a bounding estimate for each material category, starting with processing of sold products | Non-conformance on inventory completeness until the categories are quantified or bounded |
| F-11 / D4-03, D8-09: the 44% pre-operational project outside every figure and both targets while carrying most of the target | A reader is asked to accept a 37 percentage point contribution with no emissions figure for its source at any stage | Investment and non-attributable treatment, and acquisition treatment on boundary growth | 4.5.5.8 Investments; 4.5.6 Influence Based Inventory Categories; 4.7.3 Business Acquisitions; 5.1.9 Influence Based Disclosure; Annex B | A design-capacity emissions and intensity estimate at the equity share, and the boundary-growth treatment on commissioning | Non-conformance on investment completeness and on acquisition treatment |
| F-12 / D7-01: quarterly target review asserted against two committee meetings held | The governance wrapper that makes a target credible does not hold together within one annual report | Accountability and decision-making requirements, with claim accuracy governing what may be said about them | 4.9.3 Roles & Responsibilities; 4.9 Governance & Decision Making; 4.9.1 Use of Claims and Statements; 1.1.3 Use of Claims and Representations | The committee's terms, its meeting record and the review evidence for the period | Non-conformance on governance and on claim accuracy |
| F-13 / D7-03: no emissions metric in executive incentives, presented as sustainability conditions | What is rewarded is a third-party rating and an equipment programme, not the emissions outcomes committed to | Metrics and targets governance, including the internal cost of carbon and target integrity, and accountability | 4.9.2 Metrics & Targets; 4.9.3 Roles & Responsibilities | The incentive plan rules, the metric weightings and the threshold, target and stretch levels | Standard review item: the clause requires target integrity and accountability, not a specific pay linkage |
| F-14 / D2-05, D5-03, D8-05: four rows, no source split, no market-based Scope 2, an unsized product-carbon deduction | A reader cannot see whether reductant, process heat, mobile fuel or purchased electricity is moving, and cannot recover gross Scope 1 | Inventory table presentation at category and source level, with the quantification hierarchy and the electricity method declared | 5.1.8 GHG Inventory Table; 4.5.1 Emission Scopes; 4.5.4 Quantification; 4.5.5 Methodology (market versus location-based) | The source-level inventory, both Scope 2 bases, and the deduction as a separate line beneath gross Scope 1 | Non-conformance on inventory presentation |
| F-15 / D7-05: climate absent from the financial statements against an asserted connectivity | An investor invited to a cohesive view finds the two halves of the annual report do not meet | Public reporting and disclosure obligations, with the financial reconciliation of the inventory | 4.9.4 Public Reporting & Disclosure; 4.6.3 Financial reconciliation; 5.1 Public Disclosure Statement | The reconciliation between the inventory and the financial statements, and the climate assumptions used in impairment and asset lives | Non-conformance on disclosure completeness |
| F-16 / D5-02: the 2050 target labelled both absolute and net, with the credit role unbounded | Whether the target requires abatement or may be met by credits is the largest determinant of what it commits the company to | Abatement-before-offset sequencing, credit eligibility, and net-zero claim conditions | 4.8.1 Abatement Principles; 4.8.2 CDR Criteria (Table 4); 4.8.3 Permanence Risk Mitigation; 4.7.5 Net Zero Status Requirements; 4.9.1.2 Net Zero Claims | The residual definition, the maximum credited share, the credit type and the abatement sequence | Net-zero claim unavailable until the residual and credit conditions are met |
| F-17 / D6-07: gas coverage enumerated with sources that are not the company's, and two of the seven gases absent | The row that tells a reader which gases the target binds describes a national inventory instead | Emission-scope and category definitions applied to the entity's own sources | 4.5.1 Emission Scopes; 4.5.3 GHG Emission Categories; 5.1.7 Boundary Description | The gases actually emitted, by source, with the inapplicable ones marked | Non-conformance on boundary and category description |
| F-18 / D6-08, D8-07: mitigations against a US$283 million exposure are three investigations and a research concept | A reader cannot distinguish a plan from a list of possibilities, and a laboratory-stage concept is offered against a nine-figure annual exposure | Clean Alternative Assessment before any credit use, and Required Interventions with dates | 4.7.2 Clean Alternative Assessment; 4.7.1 Required Interventions; 4.8.1 Abatement Principles | The costed option set, the assessment against clean alternatives, and the decision record | Critical non-conformance while the abatement plan is a list of investigations |
| F-1 / D9-01: physical risk priced hazard by hazard and tied to the balance sheet | The exposure is sized and attached to identified assets, which is beyond the usual treatment | Assurance over the disclosed figures, and boundary description of the assets covered | 6.1 Assurance Requirements; 5.1.7 Boundary Description | The modelling assumptions, the hazard methodology and the asset register | Supports conformance; extending assurance to it would strengthen reliance |
| F-2 / D9-01, E-19: carbon pricing quantified at US$283 million a year by 2030 under a named scenario | An investor gets the number that makes the intensity target financially legible | Internal cost of carbon under the metrics-and-targets governance clause | 4.9.2 Metrics & Targets (internal cost of carbon) | The carbon-price trajectory used, the scenario mapping and the internal price applied in investment decisions | Supports conformance if carried into capital allocation |
| F-3 / D8-02: fleet and equipment electrification delivered and visible in the fuel data | Executed change with figures behind it, not intention | Required Interventions, where fleet electrification is a prescribed intervention with dates | 4.7.1 Required Interventions; Annex A Illustrative Examples of Reduction Obligations | Fleet inventory, sites covered, capex and expected abatement | Supports conformance and would convert a case study into a scheduled obligation |
| F-19 to F-26 (Annex H) | Eight open items, each traceable to a specific missing disclosure | Data quality ranking and improvement, with non-conformance disclosure where an item cannot be closed | 4.6 Data Quality; 4.6.1 Ranking; 4.6.2 Improvement; 5.1.15 Non-Conformance Disclosure | See Annex H per item | Items open until the evidence is provided; the standard requires the gaps to be disclosed rather than left implicit |
Nickel Industries' first mandatory climate report quantifies its risks and says almost nothing about its performance: it prices its physical hazards by decade and puts a US$283 million-a-year carbon cost on itself by 2030, and then says nothing about how its two headline climate commitments are actually going. On the company's own published figures the metric its flagship target is written in has moved away from that target every year since the baseline, absolute emissions have more than doubled, and the pathway that explained how the target would be met has been removed from the suite in the year its largest component slipped. None of that is stated, so no audience can use this disclosure for the decision it needs to make, and the same absence is what carries the legal and regulatory exposure in section 5.
The first fix is small and it unlocks most of the others: publish the 2022 base-year intensity and the CY2025 intensity side by side in the statutory report, with the movement, the denominator and the boundary change named. That single table would make both targets measurable, would satisfy the performance-and-trend disclosure the standard requires, and would let the company put its own explanation on a number that a reader can otherwise only construct from four documents and three reporting periods. Next, restate the prior year onto the current method so the 18.3% increase can be split into what the company emitted and what it recounted; republish the pathway with each wedge sized, dated and costed, restated for the deferral; and resolve the two competing totals, the unit header and the review-cadence statement before the CY2026 report, where the Scope 3 relief will no longer be available and the processing of sold products will have to be faced.
This diagnosis is general information, published to support transparency, accountability and public debate on corporate climate disclosure. It sets out CRI's assessment of the publicly available climate disclosures of the organisation named above, for the reporting period stated, based on third-party information available at the review date. The assessment is made against CRI's Climate Disclosure Review Rules (version stated above), which use the CRI Net Zero Standard as the reference for a credible claim together with AASB S2 Climate-related Disclosures, and it gives reasons for each finding.
It assesses the disclosure, not the organisation's underlying climate performance or intent, and it does not allege illegality, misconduct, greenwashing or dishonesty. It is not tailored advice, nor legal, financial or investment advice, and it is not an audit, an assurance engagement or a certification. CRI does not accept liability for any error or omission in this analysis, or for any loss arising from use of or reliance on it.
AI tools help locate, extract and organise material from the source documents against a fixed rule set. Every rating and conclusion is reviewed and confirmed by CRI analysts; the rules, not the model, determine the outcome.
Organisations may contact CRI at robc@noco2.com.au to identify an error, provide relevant public information or request review of updated disclosures. Where a correction affects a finding, the diagnosis is updated and the change is noted. Further information about the review method is at noco2.com.au.
© Carbon Reduction Institute Pty Ltd, ABN 26 122 969 233. This report is protected by copyright. It reproduces third-party material for the purpose of criticism and review; any reproduction of this report not permitted under the Copyright Act 1968 (Cth) requires CRI's consent.
These annexes are the detailed working layer behind the findings in the body: the evidence base, rule application and traceability. Much of it is review working, retained for transparency and of interest to both the internal review team and external readers who want to see how each finding was reached.
| Document | Status | Criticality | Notes |
|---|---|---|---|
Re-issuance of AASB S2 Sustainability Report, ASX release 10 March 2026, 34 pages (re-issuance-of-aasb-s2-sustainability-report-3326083.pdf) | Reviewed | Critical | The statutory disclosure under review. Folios 36 to 68 of the 2025 Annual Report pagination. Contains the basis of preparation, governance, strategy, risk management, metrics and targets, the Directors' Declaration, the KPMG review report and the lead auditor's independence declaration |
2025 Annual Report, released 24 April 2026 (NIC-2025-Annual-Report.pdf) | Reviewed | Critical | The audited statutory source and the A-01B primary anchor. Review of Operations (production, earnings, project status), Directors' Report (committee meetings, ESG milestone narrative), audited Remuneration Report (incentive conditions), audited financial statements |
2025 Sustainability Report, voluntary (NIC-2025-Sustainability-Report.pdf) | Reviewed | Critical | Carries the emissions-intensity metric (folio 5), the fuel and energy table (folio 76), the GRI and SASB indices and the SRAI assurance statement (folios 97 to 100). Reproduces the AASB S2 report at folios 72 to 75 |
| Independent Auditor's Review Report, KPMG, Adam Twemlow, Brisbane, 10 March 2026 | Reviewed | Critical | Limited assurance under ASSA 5000 and ASSA 5010 over governance paragraph 6, strategy subparagraphs 9(a), 10(a) and 10(b), and Scope 1 and Scope 2. Unmodified, with an Emphasis of Matter on the Directors' Declaration re-issuance |
| Independent Assurance Statement, PT Sejahtera Rambah Asia, 11 May 2026, number 14/000-758/V/2026/SRAI | Reviewed | Material but not critical | Type 1, moderate level, against AA1000AS v3 and AA1000AP (2018), over the voluntary report's material topics including Energy and Emissions. Expressly excludes financial data and forward-looking statements |
2024 Sustainability Report (NIC-2024-Sustainability-Report.pdf) | Reviewed: prior period, context only | Critical for the year-over-year module | Source of the CY2024, CY2023 and CY2022 emissions, intensity, energy and production series, the Net Zero Roadmap section and the decarbonisation pathway waterfall |
2023 Sustainability Report (NIC-2023-Sustainability-Report.pdf) | Reviewed: prior period, context only | Material but not critical | Records the COP28 target announcement and the recalculation of the emissions forecast to include equity shares in recent acquisitions |
2022 Sustainability Report (NIC-2022-Sustainability-Report.pdf) | Reviewed: prior period, context only | Critical for the baseline | Source of the CY2022 base-year intensity of 63.93 tCO₂e per tonne of nickel equivalent, the CY2021 and CY2020 series, and the footnote that the intensity is computed on a 100% production basis |
| AASB S2 Sustainability Report as first released, ASX 23 February 2026 | Not reviewed: superseded | Not critical | Superseded on 10 March 2026. The omission of the Directors' Declaration and its remedy are disclosed in the re-issuance announcement and in the auditor's Emphasis of Matter, so the fact is established without the document |
| GHG inventory methodology document or calculation workbook | Not reviewed: document not provided | Critical | Factors are named at source-category level with uncertainty bands but no values. Dependent areas are cannot-verify: F-19, F-20, F-22. This is a limit on the review, not a finding against the company |
| Standalone Net Zero Roadmap | Not published as a standalone document | Material but not critical | Checked nickelindustries.com investor centre, company-reports page and sustainability page on 3 September 2026. Roadmap content exists only inside the CY2024 Sustainability Report and is not carried into the CY2025 suite |
| ESG data pack or performance data workbook | Not published | Material but not critical | No separate data pack is published; the GRI-indexed tables inside the Sustainability Report serve that function |
| Climate Active or other carbon-neutral certification documentation | Not applicable | Not applicable | No such claim is made for any period reviewed |
| NGER register row | Checked: no match | Not applicable | Not a controlling corporation for FY2024-25. Operations are wholly Indonesian. Absence is not evidence of zero emissions and is immaterial to this footprint |
| Half Year Financial Report, released 26 August 2026 | Deliberately excluded | Not applicable | Covers a later period than CY2025. Out of scope under the reviewed-period rule |
Scoping note. The corpus runs from the earliest available period up to and ending at CY2025. The only reach past the reviewed period is the dated confirmation that no standalone roadmap or further CY2025 climate document has been published, which cites the search and not a document.
| Evidence ID | Source (doc · page/table) | What it shows | Linked claim / finding | Rule IDs | Status |
|---|---|---|---|---|---|
| E-01 | AASB S2 report, folio 37, Basis of Preparation | Reporting entity is the group plus entities held through equity accounted interests; authorised for issue 10 March 2026; currency US$ | Scope, §1.1 | L-01, S2-01, A-01A | Confirmed |
| E-02 | AASB S2 report, folio 37, Statement of Compliance and Transition Reliefs | Prepared in accordance with AASB S2 and the Corporations Act; paragraph C3 (no comparatives) and C4(b) (no Scope 3) reliefs applied for the first annual reporting period | §2.3, F-10, G1 | S2-01, S2-45, C3, C4(b) | Confirmed |
| E-03 | AASB S2 report, folio 60, GHG inventory basis | Equity share elected as the primary organisational boundary; inventory covers operated mining and RKEF lines plus HPAL via the equity-based approach; assets not in the operational phase excluded; Scope 2 location-based | §3.1, F-11, F-14, A3 | G-01, G-04, G-05, G-07, S2-28 | Confirmed |
| E-04 | AASB S2 report, folio 61, disaggregated Scope 1 and Scope 2 table | Scope 1 consolidated 4,055,322; Scope 2 consolidated 3,743,827; Scope 1 invested 43,618; Scope 2 invested 19,356 tCO₂e. Sum 7,862,123. Header reads "million metric tonnes of CO2-e" | §3.1, F-9, F-14, A2, A4 | G-06, S2-26, S2-28, GHG-STD-08 | Confirmed |
| E-05 | 2025 Sustainability Report, folio 5, performance highlights | Scope 1 and 2 stated as 7,849,014 tCO₂e; emission intensity 72 tCO₂e per tonne of Ni, tagged GRI 305-4 | F-5, F-9, F-20, A2, G2 | A-01B, DR-02, GHG-STD-08 | Confirmed: competing total |
| E-06 | 2025 Sustainability Report, folio 76, energy consumption (equity-based) | Coal bituminous 1,057,043,557 kg; semi-coke 90,591,787 kg; sub-bituminous 237,745,318 kg; anthracite 199,703,685 kg; electrode paste 10,464,987 kg; electricity 4,354,119,109 kWh; petrol 1,893 L; biodiesel 13,069,906 L; coke oven gas 284,558,414 m³; LPG 13,565 kg. Total 54,044,036 GJ; energy intensity 498.59 GJ per tonne of Ni | §3.3, F-7, F-19, F-20 | G-06, A-19, G-BAU, SEC-MIN-09 | Confirmed |
| E-07 | 2024 Sustainability Report, folio 39, GHG emissions table | CY2024, CY2023, CY2022: Scope 1 2,934,253 / 3,193,569 / 1,770,086 (stationary, mobile and a negative carbon-fraction-in-NPI line of -87,166 / -80,386 / -41,076); Scope 2 3,710,248 / 3,440,250 / 1,814,177; totals 6,644,501 / 6,633,819 / 3,584,263; intensity 65 / 65 / 64 | §3.3, §3.4, F-5, F-6, F-7, F-14, F-22 | YOY-02, YOY-04, YOY-05, SEC-SF-11 | Confirmed |
| E-08 | 2024 Sustainability Report, folio 40, energy and energy intensity | Total energy 57,621,456 / 59,345,846 / 32,875,172 GJ; nickel metal production 127,263 / 128,259 / 70,079 tonnes of nickel equivalent; energy intensity 452.78 / 462.70 / 469.12 GJ per tonne; conversion factors from the GHG Protocol stationary-combustion tool v4.1 (WRI 2015) | §3.3, F-7, F-19, F-20 | G-10, GHG-STD-08, YOY-04 | Confirmed |
| E-09 | 2022 Sustainability Report, folios 42 and 43 | CY2022 / CY2021 / CY2020: Scope 1 1,770,086 / 940,808 / 1,207,426; Scope 2 1,814,177 / 1,086,944 / 975,078; intensity 63.93 / 64.99 / 63.60 tCO₂e per tonne Ni eq; Scope 2 factor 0.864; footnote that the figures are counted on a 100% production basis for intensity purposes only | §3.4, F-5, F-21 | T-BASE-01, YOY-02, G-10 | Confirmed: base-year value |
| E-10 | 2024 Sustainability Report, folios 34 and 35, Net Zero Roadmap and 2050 Decarbonisation Roadmap | Pathway wedges to the 2035 target: RKEF production changes 3%, HPAL acquisitions 37%, carbon and energy management 3%, low-carbon power, solar, LNG and hydro 13%, summing to the 50% target; then renewable power, smelter process heating 19% and smelter decarbonisation 21% to 100%. "The ENC HPAL expansion is anticipated to lower the Group's emissions intensity by 37%" | F-8, F-11, I2, SEC-MIN-05 | T-01, T-DEP-04, SEC-MIN-05, SEC-MIN-11, YOY-05 | Confirmed |
| E-11 | 2024 Sustainability Report, folio 38, Metrics and Targets | "the full impact on absolute and intensity metrics reduction is expected to materialise from 2025 onward. The expected commissioning of the ENC HPAL project in the second half of 2025 is expected to deliver material reductions in carbon emissions intensity" | F-8, I3, YOY-06 | YOY-05, YOY-06, A-21 | Confirmed: prior-period forward statement, testable now |
| E-12 | AASB S2 report, folio 51, transition plan and decarbonisation targets | "The commissioning of the ENC HPAL project in 2026 is expected to deliver material reductions in carbon emissions intensity. At 31 December 2025 the Group had acquired 44% interest for $1,012.0 million" | F-8, F-11, F-23 | T-DEP-04, SEC-INV-LT-17, T-INV-01 | Confirmed: one-year deferral |
| E-13 | AASB S2 report, folios 62 and 63, target table 1a | 50% intensity reduction by 2035, base period 2022, metric tCO₂e/tNi, period 2025 to 2035, milestones and interim targets "Nil", not validated, monitoring metric "Measure of tCO₂-e/tNi (annually)", gross, Scope 1 and 2, no sectoral decarbonisation approach; GHG coverage listed as CO₂, CH₄, N₂O, HFCs, PFCs with national-inventory source descriptions | F-4, F-17, I2, R2 | S2-38, S2-39, T-01, T-14, T-BASE-01 | Confirmed |
| E-14 | AASB S2 report, folios 63 and 64, target table 1b | Net zero by 2050, base period 2022, period 2022 to 2050, milestones "Nil", metrics for monitoring progress "Nil", target type "Absolute quantitative target", gross or net "Net target", credits "a limited and supportive role", not validated, "reviewed quarterly by the Risk Management and Sustainability Committee" | F-4, F-6, F-12, F-16 | S2-38, S2-40, T-01, T-08, G-11, E-08 | Confirmed |
| E-15 | AASB S2 report, folio 39, governance | RMSC charter requires at least four meetings a year; "In 2025 there were only two formal meetings held"; membership is executive directors Seckold, Werner and Shepherd plus non-executive Shangjaya, with three associate members | F-12, P1, G2 | GOV-01, GOV-02, A-11 | Confirmed |
| E-16 | 2025 Annual Report, folio 19, Directors' meetings table (audited Directors' Report) | Risk Management and Sustainability Committee: 2 held, 2 attended by each of the four members. Remuneration Committee: 2 held. Audit Committee: 2 held. Board: 5 held | F-12, P1, G2 | GOV-01, DR-02, A-01B | Confirmed: contradicts the quarterly-review statement |
| E-17 | 2025 Annual Report, Remuneration Report (audited), performance rights and STI | Performance rights issued 30 June 2025: relative TSR 30%, EPS 30%, strategic objectives 40% (customer diversification, charitable foundation, increased RKAB sales quota, transition to EV trucks). STI metrics: adjusted EBITDA, Hengjaya production volume, strategic growth, "ESG, including MSCI rating, society and governance", safety on actual LTIR, individual KPIs. 58% of fixed remuneration awarded to two executive directors | F-13 | GOV-08, GOV-09, A-11 | Confirmed: no emissions metric |
| E-18 | AASB S2 report, folio 48, impact in the reporting year | About 870 mm of rainfall in March 2025 including 96.5 mm in nine hours overflowed the IMIP tailings storage, which the group does not own or operate; the Oracle Nickel refinery stopped for two days; about US$5.8 million in lost production and repairs. "No impact to the carrying amount of assets and liabilities reported in the related financial statements" | F-1, F-15, I1 | N-01, N-02, S2-16, S2-22 | Confirmed |
| E-19 | AASB S2 report, folios 48 to 50, anticipated financial effects and cumulative risk table | Physical: temperature 11.7 / 20.0 / 26.2; sea level 5.1 / 5.8 / 6.5; rainfall and flooding 8.3 / 9.4 / 10.5; extreme weather 1.3 / 1.4 / 1.6; landslide and downstream value chain not quantified; totals 26.4 / 36.6 / 44.8 US$m for 2030 / 2040 / 2050. Transition: carbon pricing 283 / 341 / 411; energy costs 32 / (43) / (61.4); totals 315 / 298 / 349.6. Total risk 341.4 / 334.6 / 394.5 | F-1, F-2, I1, R3 | S2-19, S2-20, S2-21, N-03 | Confirmed: 2050 total sums to 394.4 against 394.5 stated |
| E-20 | AASB S2 report, folio 50, assets vulnerable table | Property, plant and equipment US$1,484m, 35% of total assets; exploration and evaluation US$77.4m, 2%; investment in equity accounted investee US$1,248.6m, 29%, at 31 December 2025 | F-1, F-15 | S2-20, S2-22 | Confirmed: internally consistent on total assets of about US$4,240m |
| E-21 | AASB S2 report, folios 47 and 48, transition risk table | Carbon pricing mitigations: "Continue development of the Net Zero roadmap"; "Investigate to deploy captive renewable power source"; "Investigate opportunity to adopt waste heat recovery"; "Explore opportunities of phytomining and bio-leaching technology ... which allows for production of 'carbon-negative nickel'" | F-18, I2 | SEC-MIN-11, T-01, S2-14 | Confirmed |
| E-22 | AASB S2 report, folios 45 to 48, risk register | Each risk carries a time horizon, a status of "Increasing", a potential impact and named mitigations. Downstream value-chain risk is tied to a buyer market concentrated in China; EU battery passports and border-adjustment mechanisms named as potentially reducing demand | R3, §5.2 other lens | S2-10, S2-11, DR-05 | Confirmed |
| E-23 | AASB S2 report, folios 53 and 54, scenario inputs | Physical: IPCC SSP1-1.9, SSP2-4.5, SSP5-8.5. Transition: NGFS Net Zero 2050, Fragmented World, Current Policies, NDCs. Fragmented World best estimate 2.4 °C against a "very likely range" of 3.3 to 4.5+; NDCs best estimate 2.3 with no range | R3 note, figure-fidelity C-04 | S2-22, S2-23, S2-24 | Confirmed: internal inconsistency in the scenario table |
| E-24 | AASB S2 report, folio 52, implications for business model | "At the reporting date, these implications have not resulted in changes to Nickel Industries' strategy or business model" | I2, F-15 | S2-13, S2-14 | Confirmed |
| E-25 | AASB S2 report, folio 62, challenges for the measurement of emissions | "No new Scope 1 or Scope 2 emission sources were identified or added to the emissions inventory during the reporting period. Emissions sources considered immaterial to the Group's overall emissions profile are not included in the reported figures" | F-14, F-23, G2 | G-02, G-03, G-09, A-05 | Confirmed |
| E-26 | AASB S2 report, folios 61 and 62, methodology table | Source categories: semi-coking coal, sub-bituminous coal, bituminous smelting coal, anthracite coal, biodiesel B35 stationary and mobile, land-use deforestation, land-use reforestation, coking oven gas, electrode paste, carbon fraction in NPI, and Scope 2 electricity at grid average. Factors from the 2019 Refinement to the 2006 IPCC Guidelines. Uncertainties stated at plus or minus 5% to 20% | F-7, F-14, A3, F-22 | G-10, GHG-STD-04, GHG-STD-08 | Confirmed |
| E-27 | KPMG Independent Auditor's Review Report, folios 65 to 68 | Limited assurance under ASSA 5000 and ASSA 5010 over: governance disclosures (paragraph 6, pages 39 to 43); strategy risk and opportunity disclosures (subparagraphs 9(a), 10(a), 10(b), the table on pages 45 to 48); Scope 1 and Scope 2 GHG emissions (page 61 and the methodology on pages 61 and 62). Unmodified conclusion. Emphasis of Matter on the Directors' Declaration issued 10 March 2026 after its omission from the 23 February 2026 report, superseding the earlier review report | §2.3, F-4, G1, F-26 | GOV-12, GOV-13, A-11 | Confirmed: targets, financial effects and scenario analysis outside scope |
| E-28 | 2025 Annual Report, Review of Operations, folios 4 to 8 | Total RKEF nickel production 124,966 tonnes (CY2024: 127,261), below CY2024 "due to a lower grade of nickel ore feed"; RKEF adjusted EBITDA US$150.1m (CY2024: US$187.2m); HNC produced 85,031 tonnes of nickel and 8,023 tonnes of cobalt in MHP, 42% above nameplate; attributable HNC adjusted EBITDA at 10% US$41.3m; mine adjusted EBITDA US$91.6m | §3.3, F-20, F-2, intensity derivation | A-01B, G-06 | Confirmed |
| E-29 | 2025 Annual Report, Review of Operations, folio 11 | ENC described as a "global showcase for sustainable, high quality, low carbon nickel production" | F-11, P2, SEC-MIN-06 | OUT-TB-02, OUT-TB-15, SEC-MIN-06, SEC-MIN-08 | Confirmed |
| E-30 | 2025 Annual Report, financial statements and notes, folios 66 onward | No reference to climate anywhere in the financial statements or the notes, including in key estimates and judgements, impairment assumptions or asset lives | F-15, G2 | S2-15, S2-22, DR-02, A-01B | Confirmed by full-text search of the audited statements |
| E-31 | AASB S2 report, folio 37, Connectivity | "This report makes connections with other reports, including the financial statements, to present a cohesive view of how relevant climate related risks and opportunities could impact the Group's financial position, performance and cash flows over the short, medium and long term" | F-15, G2 | S2-15, DR-02 | Confirmed |
| E-32 | AASB S2 report, folio 51, transition plan actions | Electric truck fleet at Hengjaya Mine from 8 units in 2024 to 37; RKEF deployed 20 loaders, 4 excavators and 1 forklift; solar supplies about 20% of the mine's electricity; Oracle Nickel transitioned to recycled furnace gas; the IMIP solar project of 262 MWp and 80 MWh BESS reached financial close on 23 January 2026 with a 25-year fixed-tariff PPA; "Other forms of carbon reduction such as carbon credits are also being considered but are not currently being used" | F-3, §3.3, F-24, F-25 | SEC-MIN-02, SEC-MIN-12, E-08, A-18 | Confirmed |
| E-33 | 2025 Sustainability Report, Chairman's message, folio 8 | Oracle Nickel began using coking oven gas at the end of 2024, followed by Ranger Nickel and Hengjaya Nickel in the fourth quarter of 2025; "Nickel Industries remains committed to its targets of reducing carbon intensity by 50% by 2035 and achieving net zero emissions by 2050" | F-7, P2, E-25 cross-check | OUT-TB-02, A-19 | Confirmed |
| E-34 | 2025 Sustainability Report, folios 97 to 100, SRAI assurance statement | Type 1, moderate level, AA1000AS v3, over material topics including Energy and Emissions, for 1 January to 31 December 2025; excludes financial data and forward-looking statements; issued Jakarta 11 May 2026 | §2.3, A4 | GOV-12, GOV-14 | Confirmed |
| E-35 | Search of nickelindustries.com investor centre, company-reports page and sustainability page, 3 September 2026 | Sustainability Reports for 2021 to 2025 and Annual Reports for 2018 to 2025 are published. No standalone Net Zero Roadmap, no ESG data pack, no TCFD report after the 2022 edition, and no further CY2025 climate document | §1.1, Annex A | A-01A, E-21 form | Confirmed: search cited, not a document |
| E-36 | NGER register lookup, reference/ngers-register-2024-25.csv, 3 September 2026 | No match for Nickel Industries. Not a controlling corporation for FY2024-25 | Annex J.2 | A-01C, DR-02 | Confirmed |
| E-37 | Derivation from E-04, E-07, E-08, E-09 and E-28 | The published intensity reproduces as equity emissions over equity nickel in every year published: CY2022 63.93, CY2023 64.65, CY2024 65.27, CY2025 72.48. On the CY2022 to CY2024 boundary the CY2025 figure is 78.01. The 2035 end-point is 31.97 | F-5, F-20, F-21, §3.3, §3.4 | T-BASE-01, T-14, A-19, FIGURE-FIDELITY | Derived: method confirmed against the published base-year value |
| E-38 | Derivation from E-06 and E-08 | Non-electric energy 38,297,248 to 38,369,207 GJ, up 0.2%; electricity 5,367.8 to 4,354.1 GWh, down 18.9%; implied Scope 1 factor 76.62 to 105.69 kg per GJ, up 37.9%; implied Scope 2 factor 0.6912 to 0.8598 kg per kWh, up 24.4% | F-7, §3.3, F-19 | A-19, G-BAU, G-10, SEC-MIN-09 | Derived: the split of causes remains cannot-verify |
| Claim ID | Wording / paraphrase | Claim object | Claim source & basis (OUT-TB-15) | Doc & location | Strength | Audience | Evidence req/found/missing | Triggered scans | Rule IDs | Status |
|---|---|---|---|---|---|---|---|---|---|---|
| C-01 | "The Group has committed to a 50% reduction in carbon intensity by 2035 and net-zero emissions by 2050, using 2022 as a baseline" | Scope 1 and Scope 2 emissions intensity in tCO₂e per tonne of nickel, across the portfolio within the reporting entity | Self-declared, board-approved, announced at COP28 in December 2023. Expressly "not validated" by any third party and "not aligned with any jurisdictional commitment" | AASB S2 report, folio 40 and folios 62 to 64; restated in the 2025 Sustainability Report Chairman's message | Strong: a quantified, dated, publicly repeated commitment in a director-declared statutory report | All five audiences | Required: base-year value, current value, progress, pathway. Found: none in the reviewed period's suite. Missing: all four. The base-year value is in the CY2022 and CY2024 reports; the current value is in the CY2025 voluntary report only | Target boundary, baseline, progress calculation, method changes, milestones, remuneration link, multi-period series | S2-38, S2-39, T-01, T-14, T-BASE-01, A-17, OUT-TB-02 | Decision-usefulness concern, high confidence. Unmeasurable from the reviewed disclosure; on the company's own series the metric has moved away from the target |
| C-02 | "Achieve net-zero emissions by 2050" and "Portfolio-wide emissions ... reduction to net zero for Scope 1 and 2 emissions by 2050 measured in CO2-e" | Absolute Scope 1 and Scope 2 emissions of the reporting entity | Self-declared, not validated, no jurisdictional alignment | AASB S2 report, folios 63 and 64 | Strong on its face, unsupported in the disclosure: milestones "Nil", monitoring metrics "Nil" | Institutional and retail investors, public, regulators | Required: interim milestones, monitoring metric, credit cap, residual definition. Found: none. Missing: all | Net-zero trigger: target boundary, transition plan, gross versus net, residual emissions, offsets, assurance scope, reader-burden caveats | S2-40, T-01, T-08, G-11, E-08, A-17 | Decision-usefulness concern, high confidence. Labelled "Absolute quantitative target" and "Net target" in the same table; credits described as "limited and supportive" with no bound |
| C-03 | "Reduce carbon intensity by 50% by 2035 based on a 2022 baseline measured in tCO2-e/tNi", period "2025-2035" | The intensity metric only. Gross target, Scope 1 and 2 | Self-declared | AASB S2 report, folio 62 | Strong | All five | Required: reconciliation of a 2022 base period to a 2025 target start. Found: none | Baseline, coverage, target period, milestones | T-BASE-01, S2-38 | Decision-usefulness concern, high confidence |
| C-04 | Emission intensity "72 tCO₂e/tonne of Ni" | The group's CY2025 emissions intensity | Self-declared, GRI 305-4 tagged, inside the voluntary report whose assurance is moderate-level AA1000 | 2025 Sustainability Report, folio 5 | Moderate: a bare figure in a highlights panel | Carbon accounting, investors | Required: denominator, basis, comparative. Found: none stated; all derivable from other documents. Missing: all as published | Coverage percentage without a denominator; multi-period series | T-COV-02, G-06, A-05 | Cannot verify as published, medium to high confidence on the derivation |
| C-05 | Scope 1 and 2 emissions "7,849,014 Tonnes CO2eq" | The group's CY2025 Scope 1 and Scope 2 total | Self-declared, in the highlights of the document that also reproduces the assured statutory table | 2025 Sustainability Report, folio 5 | Moderate | Carbon accounting, regulators | Required: reconciliation to the 7,862,123 that the statutory table's four rows sum to. Found: none. Missing: the reconciliation | Cross-source consistency matrix | DR-02, A-01B, GHG-STD-08 | Decision-usefulness concern, high confidence: competing totals |
| C-06 | "This target is reviewed quarterly by the Risk Management and Sustainability Committee" | The governance cadence applied to the 2050 net-zero target | Self-declared in the statutory report, within the assured governance section | AASB S2 report, folio 64 | Strong: a factual assertion about the period | Public, retail investors, regulators | Required: evidence of four reviews. Found: the same annual report records two committee meetings held, against a charter requiring at least four | Governance, controls, assurance scope, cross-source consistency | GOV-01, GOV-02, A-11, DR-02, OUT-EXT-04 | Potential compliance concern, high confidence. Not accurate as printed |
| C-07 | The incentive program "included specific sustainability related performance conditions ... metrics such as the establishment of a charitable foundation, transitioning to electricity vehicle hauling trucks, safety based on actual LTIR performance, ESG based on the Group's MSCI rating" | Executive short-term and long-term incentive conditions | Self-declared, cross-referable to the audited Remuneration Report | AASB S2 report, folio 39; 2025 Annual Report Remuneration Report | Moderate | Investors, public | Required: whether any emissions or intensity metric is included, and its weighting. Found: none is; the climate item shares an undisclosed weighting inside a 40% basket with three non-climate objectives | Remuneration trigger: metric boundary, gross versus net, target progress, controls | GOV-08, GOV-09, A-11, T-PROC-05 | Decision-usefulness concern, medium to high confidence |
| C-08 | "This report makes connections with other reports, including the financial statements, to present a cohesive view of how relevant climate related risks and opportunities could impact the Group's financial position, performance and cash flows" | Connectivity between the climate report and the financial statements | Self-declared, in the basis of preparation | AASB S2 report, folio 37 | Moderate to strong | Investors, regulators | Required: the connection in the financial statements. Found: no reference to climate anywhere in the audited statements or notes | Cross-source consistency; financial effects | S2-15, S2-22, DR-02, A-01B | Decision-usefulness concern, high confidence |
| C-09 | "No new Scope 1 or Scope 2 emission sources were identified or added to the emissions inventory during the reporting period" | Completeness and stability of the inventory's source set | Self-declared, adjacent to the assured Scope 1 and 2 figures | AASB S2 report, folio 62 | Moderate | Carbon accounting, regulators | Required: reconciliation to a method table that lists coking oven gas, anthracite, sub-bituminous coal and land-use categories absent from the prior year's taxonomy, and to the company's own account of extending coking oven gas to two plants in Q4. Found: none | Method and boundary change; time-series comparability | G-02, G-03, G-10, A-05 | Cannot verify, medium confidence. The wording may be read as period-internal; the company does not say which |
| C-10 | ENC as a "global showcase for sustainable, high quality, low carbon nickel production" | The Excelsior Nickel Cobalt project | Self-declared, in the audited annual report's Review of Operations, about a project not yet in the operational phase and outside the inventory | 2025 Annual Report, folio 11 | Moderate | Public, retail investors | Required: an emissions or intensity figure for the project. Found: none, at any stage | Transition-materials narrative; look-through exposure | SEC-MIN-06, SEC-MIN-08, OUT-TB-02, OUT-TB-15, T-INV-01 | Decision-usefulness concern, medium to high confidence. Enablement framing, not emissions evidence |
| C-11 | HPAL technology "implemented to process nickel ores with lower emissions and energy requirements" and expected to "deliver material reductions in carbon emissions intensity"; the waste-heat boiler "can provide up to 40% of power needs" | The HPAL processing route | Self-declared, partly supported: the equity-accounted HPAL operation's disclosed emissions imply about 7.4 tCO₂e per tonne of nickel against a group figure of 72 | AASB S2 report, folios 40 and 51 | Moderate | Investors, public | Required: the project's own intensity, its expected contribution and its timing. Found: a directional claim and a deferral from 2H 2025 to 2026, with the quantified 37% wedge withdrawn from the suite | Technology pilot versus scaled pathway; externally dependent target | SEC-MIN-11, T-DEP-04, T-01 | Partly substantiated on direction, cannot verify on magnitude |
| C-12 | Solar at Hengjaya Mine "now supplying approximately 20% of the site's electricity needs" | One mine site's electricity, not the group's | Self-declared; a 396 kWp system with 250 kWh storage per the CY2024 report | AASB S2 report, folio 40 | Moderate, and bounded on its face to the site | Public, retail investors | Required: the site's share of group electricity. Found: not stated; group electricity is 4,354 GWh, so a 396 kWp array is immaterial to it | Renewable-electricity trigger: location versus market basis, certificate fate, residual mix | E-24, OUT-TB-21, S2-28 | No apparent issue on the claim as worded: it names its own boundary. Immaterial to the group position |
| C-13 | "Other forms of carbon reduction such as carbon credits are also being considered but are not currently being used" | Use of carbon credits in the period | Self-declared | AASB S2 report, folio 51 | Moderate | All | Required: none; the statement is a disclosure of non-use | Offsets and net claims | E-08, E-12, A-18, A-16 | No apparent issue: baseline, not credited. It sits against the 2050 target's "limited and supportive role" for credits, which is unbounded |
| C-14 | "production of 'carbon-negative nickel'" via phytomining and bio-leaching | A prospective product characteristic | Self-declared, framed as an opportunity to "explore", with no disclosed activity, timing, scale or cost | AASB S2 report, folio 47 | Weak as a claim, but printed as a mitigation against a US$283 million exposure | Public, investors | Required: any activity, pilot, cost or timeline. Found: none | Technology pilots versus scaled pathways | SEC-MIN-11, OUT-TB-02, AI-20 | Decision-usefulness concern, medium confidence. Recorded as a claim-quality issue, not an allegation |
| C-15 | "prepared in accordance with the Corporations Act 2001 and AASB S2 Climate-related Disclosures", with a directors' declaration of compliance under sections 296C and 296D | Compliance of the statutory report | Self-declared by the directors; supported by an unmodified limited-assurance conclusion over four specified areas only | AASB S2 report, folios 37 and 64; KPMG report folios 65 to 68 | Strong | Regulators | Required: the paragraph 35 target-performance and trend disclosure. Found: absent for both targets, in a section outside the assured scope. The declaration itself was omitted from the first release and added on re-issuance | Applicability gate; assurance scope | S2-01, S2-45, L-01, GOV-12 | Potential compliance concern, medium to high confidence. Stated as risk, not breach |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D1-01 | Group 1 entity, first mandatory annual reporting period being the year beginning 1 January 2025 and ending 31 December 2025. Meets the Chapter 2M thresholds on assets (about US$4,240m), revenue and employees (4,699). AASB S2 applied with the paragraph C3 and C4(b) reliefs, both declared. E-01, E-02 | Appears broadly compliant on the gate: the entity is in scope, the period is correctly identified, and the reliefs are available and declared | No apparent issue: the reliefs are stated at the front of the report in plain terms | No apparent issue: baseline (not credited) · High | A reader knows which reliefs were taken | Nothing |
| D1-02 | AASB S2 paragraph 35 requires "information about its performance against each climate-related target and an analysis of trends or changes in the entity's performance". No performance figure, movement or trend analysis is given for either target. Paragraph 34(c)'s monitoring-metric cell reads "Measure of tCO₂-e/tNi (annually)" for the intensity target and "Nil" for the net-zero target. Neither C3 (comparatives) nor C4 (measurement method, Scope 3) relieves paragraph 35. The target disclosures are outside KPMG's assured scope. E-02, E-13, E-14, E-27 | Potential compliance concern: a required disclosure is absent, with no relief engaged. Stated as risk, not as a breach finding (AI-20) | Decision-usefulness concern: the two headline commitments cannot be tested from the reviewed disclosure, and the base-year value appears nowhere in it | Potential compliance concern · Medium to high | Every audience is left with a commitment and no measurement | The base-year and current-period intensity together, the movement, and a trend statement, in the statutory report |
| D1-03 | The Directors' Declaration required by section 296D was omitted from the AASB S2 Sustainability Report released on 23 February 2026 and supplied by re-issuance on 10 March 2026, which required a superseding auditor's review report and is the subject of an Emphasis of Matter. E-27 and the re-issuance announcement | Formal non-conformance in the original lodgement, self-identified, disclosed and cured within 15 days. The operative report carries the declaration | No apparent issue on the remedy: the re-issuance announcement states exactly what was missing and what changed, which is the transparent handling | Minor limitation · High | A reader of the first release had an incomplete statutory report for 15 days | Nothing further: recorded for the record and as context to severity at D1-02, not as the basis of any criterion verdict |
| D1-04 | Governance disclosure is extensive and is the one area with full assurance coverage, but the Risk Management and Sustainability Committee met twice against a charter requiring at least four meetings, and its membership is three executive directors plus one non-executive director, with the executive composition offered as the mitigant. E-15, E-16 | Potential compliance concern on the entity's own charter, disclosed by the entity. AASB S2 paragraph 6 governance disclosure itself is made | Decision-usefulness concern: the disclosure of the shortfall is candid, which is baseline and not credited, but it is contradicted two pages later by the assertion of quarterly target review | Decision-usefulness concern · High | The governance wrapper that makes a target credible does not hold together within one document | Hold the reviews the charter requires, or describe the cadence that occurred; explain the committee's composition against its charter |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D2-01 | Two totals for one footprint. 7,849,014 tCO₂e in the CY2025 performance highlights against four rows summing to 7,862,123 in the same document's reproduction of the statutory table; a 13,109 tCO₂e difference that no combination of the disclosed rows reproduces. E-04, E-05 | Potential compliance concern on comparability and fair presentation: an entity's reported total should be single and reconcilable | Decision-usefulness concern: anyone lifting the figure must choose between two published totals with nothing to choose on | Decision-usefulness concern · High | Defeats A2 and feeds G2 | Publish one total, with the components summing to it |
| D2-02 | The emissions table header reads "GHG Emissions (million metric tonnes of CO2-e)" over a Unit column reading tCO₂e and figures in tonnes: a unit statement wrong by a factor of one million, carried in both the statutory release and the voluntary report. E-04 | Potential compliance concern on presentation | Decision-usefulness concern: invites a reader to take 7.86 million tonnes for 7.86 million million | Minor limitation · High | Feeds A2 | Correct the header |
| D2-03 | Undisclosed method and factor change. The calculation basis moved from ISO 14064-1:2018 plus the GHG Protocol (CY2024) to the GHG Protocol Corporate Standard 2004 alone (CY2025), and the factor source from the GHG Protocol stationary-combustion tool v4.1 to the 2019 Refinement of the 2006 IPCC Guidelines. No restatement, no comparability note, no restated base year. E-08, E-26, E-38 | Potential compliance concern: comparability and restatement transparency. Mitigated in part by the C3 relief, which excuses comparatives but not the base-year integrity of a live target | Decision-usefulness concern: the reader cannot separate what was emitted from what was recounted, and the target's 2022 baseline sits on the superseded basis | Decision-usefulness concern · High | Defeats A3; drives F-7 and F-19 | The prior year restated on the current method and factor set, and a restated base year |
| D2-04 | Undisclosed boundary expansion. The CY2025 inventory adds Huayue Nickel Cobalt at 10% equity (62,974 tCO₂e across Scope 1 and 2); the CY2022 to CY2024 inventories covered the mine and four RKEF plants only. The addition lowers the blended intensity because HPAL is far less intensive, and no baseline recalculation is disclosed. E-03, E-07, E-37 | Potential compliance concern: base-year recalculation on a structural boundary change | Decision-usefulness concern: the published intensity of 72 is not on the basis of the 63.93 it is implicitly compared with; on the earlier basis it is 78.01 | Decision-usefulness concern · Medium to high | Drives F-5, F-21 | Restate CY2022 to CY2024 on the current boundary, or present CY2025 on both |
| D2-05 | Scope 1 is published as a single figure with no source decomposition, and the product-carbon deduction is retained in the method table but no longer sized. The prior period split Scope 1 into stationary combustion, mobile combustion and a negative carbon-fraction-in-NPI line of -87,166 tCO₂e, about 3% of Scope 1. Gross Scope 1 is not recoverable for CY2025. E-04, E-07, E-26 | Minor limitation on minimum compliance: paragraph 29(a) requires the scope totals, not a source split | Decision-usefulness concern, and the mining module requires more: source-level detail is what lets a reader see whether coal reductant, process heat or mobile fuel is moving | Decision-usefulness concern · High | Defeats A4 in part; drives F-14 | Restore the source split and disclose the deduction as its own line beneath a gross figure |
| D2-06 | New source categories appear in the method table (coking oven gas, anthracite coal, sub-bituminous coal, land-use deforestation, land-use reforestation) beside a statement that no new Scope 1 or Scope 2 sources were identified or added in the period, and beside the company's own account of extending coking oven gas to two further plants in Q4 2025. E-25, E-26, E-33 | Cannot verify: the wording may be read as period-internal | Decision-usefulness concern: a completeness statement that a reader cannot square with the method table beside it | Cannot verify: material evidence missing · Medium | Feeds A3 and F-19 | State which sources are new and what they contributed |
| D2-07 | The inventory reconciles to the published activity data. Scope 1 rebuilt from the CY2025 fuel table and IPCC-class factors comes to about 4.1 Mt against 4,055,322 reported, and Scope 2 divided by disclosed kWh gives 0.8598 kgCO₂e per kWh, consistent with the 0.864 grid factor named in the CY2022 report. E-04, E-06, E-09 | No apparent issue | No apparent issue: baseline (not credited). Accurate accounting that reconciles to its own activity data is the expected standard, not a positive (A-16) | No apparent issue: baseline (not credited) · High | Supports reliance on the figures as published | Nothing |
| D2-08 | Sources "considered immaterial to the Group's overall emissions profile are not included in the reported figures", neither named nor bounded, and no materiality threshold is stated. E-25 | Minor limitation | Decision-usefulness concern: an unnamed, unbounded exclusion cannot be sized by a reader | Cannot verify: evidence not provided · Medium | Feeds A1 and F-23 | Name the excluded sources, state the threshold, and bound each |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D3-01 | Scope 2 is reported location-based only, for every period, with no market-based figure and no statement that no contractual instruments are held. The GHG Protocol Scope 2 Guidance requires dual reporting where contractual instruments exist; whether any exist is not disclosed. E-03, E-04 | Potential compliance concern on the Scope 2 Guidance, unresolvable without knowing whether instruments are held | Decision-usefulness concern: a reader cannot tell whether the location-based figure is the whole story or whether any procurement sits behind it | Cannot verify: material evidence missing · Medium to high | Drives F-24, feeds A1 and A4 | Publish the market-based position, or state expressly that no contractual instruments were held |
| D3-02 | Reported Scope 2 was flat (up 0.9%) while purchased electricity fell 18.9%, from 5,367.8 to 4,354.1 GWh, because the implied grid factor rose 24.4%, from 0.691 to 0.860 kgCO₂e per kWh. The factor movement is not disclosed or explained, and the consumption fall is not stated either. E-06, E-08, E-38 | Potential compliance concern on comparability and on the explanation of movement | Decision-usefulness concern: a real 18.9% fall in electricity purchased is invisible in the reported figure, and the offsetting factor change is undisclosed. Business-as-usual and own-action movement cannot be separated | Decision-usefulness concern · High | Drives F-7 and §3.3; feeds I3 | Disclose the factor applied each year, and split the Scope 2 movement into volume and factor components |
| D3-03 | Site-level solar supplies about 20% of one mine's electricity from a 396 kWp array with 250 kWh of storage. The claim names its own boundary ("the site's electricity needs") and is not presented as a group position. Group electricity is 4,354 GWh, so the array is immaterial to the group figure. E-06, E-32, C-12 | No apparent issue | No apparent issue on the claim as worded: it is bounded on its face and does not invite a whole-of-group reading. Real action at the site, recorded at F-3 rather than here | No apparent issue · High | None adverse | Nothing. Stating the site's share of group electricity would remove any residual ambiguity |
| D3-04 | The 262 MWp solar and 80 MWh battery project reached financial close on 23 January 2026 with a 25-year fixed-tariff power purchase agreement to supply the HPAL project. Capacity was stated as 255 MWp in the CY2024 report. The offtake share attributable to the company's 44% interest, the treatment of environmental attributes and the intended Scope 2 accounting are not stated. E-32, figure-fidelity C-08 | Not yet applicable: the agreement post-dates the period and supports no CY2025 figure | Decision-usefulness concern in prospect: the accounting treatment and attribute fate will determine whether any future renewable claim is supportable | Cannot verify: evidence not provided · Medium | Drives F-25 | Disclose the offtake structure, the attributable share and the intended treatment before any renewable claim attaches |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D4-01 | Scope 3 is not disclosed for the period. The AASB S2 paragraph C4(b) first-year relief is expressly applied and is available to the entity. E-02 | No non-conformance. The election is lawful, declared, and within the standard's own transition provisions. This is recorded as a fairness control: the relief is not scored as a shortfall and does not mark the regulator row down (Annex L, ruling L-01) | Decision-usefulness concern, on a different question: a carbon accountant cannot lift the footprint and cannot confirm that nothing material is excluded. The OUT-STK-13 rebuttal, a bounding estimate per category or a full category breakdown, is not made | Decision-usefulness concern · High | Defeats A1 on usability, never on permission. Counted once per audience, not once per rule | A bounding estimate for the material categories, and a date for bringing Scope 3 into the inventory and the targets |
| D4-02 | Processing of sold products (Category 10) is the likely dominant category and is entirely absent. Nickel pig iron is sold for smelting into stainless steel by mills the company names as its customer base; the downstream chain is described as outside its ownership but expressly considered in its risk assessment. No estimate, bound or methodology is given, and no Scope 3 target exists. E-22, and the business description at E-01 | Not applicable for the period under the relief | Decision-usefulness concern, and the mining module treats this as central: where downstream processing dominates, it should drive the Scope 3 assessment, and a high rating is not available while it is unresolved | Decision-usefulness concern · High | Drives F-10; feeds A1, R2, I2 | A Category 10 estimate by product route, with methodology and assumptions, and an influence pathway |
| D4-03 | The Excelsior Nickel Cobalt project, 44% held for US$1,012.0 million, is excluded from the inventory on the basis that assets not in the operational phase are not included, and no forward emissions estimate is given. Under the equity-share boundary it will enter Scope 1 and Scope 2 rather than Category 15 once operating. E-03, E-12 | Acceptable for the period: a pre-operational asset has no operating emissions to report, and the exclusion is disclosed. This is a boundary-reach question, not an exclusion from within the boundary | Decision-usefulness concern: the project carries 37 of the 50 percentage points of the 2035 target on the company's own withdrawn pathway, and a reader is given no emissions or intensity figure for it at any stage | Decision-usefulness concern · Medium to high | Drives F-11 and I5; feeds F-23 | A design-capacity emissions and intensity profile at the equity share, and its effect on the group's pathway |
| D4-04 | Category 15 treatment is coherent but asymmetric on its face: Huayue Nickel Cobalt at 10% is inside Scope 1 and Scope 2 at equity share (62,974 tCO₂e), while Excelsior Nickel Cobalt at 44% is outside on operational-phase grounds. The basis for each is stated; the two are not reconciled side by side. E-03, E-04, E-12 | No apparent issue: both treatments follow the declared equity-share approach and its operational-phase qualification | Minor limitation: a reader meets two investee treatments in the same table with the reason for the difference stated elsewhere | Minor limitation · Medium | Feeds A3 | A single note reconciling the treatment of each investee interest |
| D4-05 | The GRI index has referenced disclosure 305-3 (other indirect Scope 3 emissions) since the CY2024 report without a figure behind it, and 305-3 is indexed again in CY2025. E-07 and the CY2025 GRI index | Not applicable: GRI indexing is voluntary | Minor limitation: an index entry pointing to a page with no Scope 3 figure suggests coverage that is not there | Minor limitation · Medium | Feeds R4 | Mark the disclosure as not reported, with the reason |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D5-01 | No carbon credits, offsets or certificates were used in the period, in any scope, and the report says so: "Other forms of carbon reduction such as carbon credits are also being considered but are not currently being used". No net claim is made for the period. E-32, C-13 | No apparent issue | No apparent issue: baseline (not credited). Not using credits is not a positive, and considering them is neither a fault nor a credit (A-18, A-21) | No apparent issue: baseline (not credited) · High | Nothing to verify on retirement, vintage or additionality for the period | Nothing |
| D5-02 | The 2050 net-zero target is labelled "Absolute quantitative target" under target type and "Net target" under gross-or-net, two rows apart in the same table, and the credits row says credits will play "a limited and supportive role" with no cap, no percentage, no residual definition and no abatement-first sequence. E-14, C-02 | Potential compliance concern: paragraph 36's gross-versus-net requirement and the planned use of carbon credits are stated inconsistently and without the extent | Decision-usefulness concern: whether a 2050 net-zero target must be met by abatement or may substantially be met by credits is the largest determinant of what it commits the company to, and the disclosure says both | Decision-usefulness concern · High | Drives F-16; feeds R4 and I2 | Resolve the labelling and state the maximum share of the target that credits may cover, with a defined residual and an abatement-first sequence |
| D5-03 | A negative line for carbon retained in nickel pig iron is applied within Scope 1 on a mass-balance basis (input carbon less stack), verified by assay. In the prior period it was -87,166 tCO₂e. It is a product-carbon accounting adjustment, not an offset, and it is not disclosed as a separate line in CY2025. E-07, E-26 | Minor limitation: the treatment is a recognised mass-balance approach and is described in the method table | Decision-usefulness concern: a subtraction from gross Scope 1 whose size the reader cannot see, in a report that no longer publishes the source split | Decision-usefulness concern · Medium to high | Drives F-22; feeds A4 and F-14 | Disclose the deduction as its own line beneath a gross Scope 1 figure |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D6-01 | No progress against either target, and no base-year value, is published in the reviewed period's suite. The intensity target's monitoring metric is stated ("Measure of tCO₂-e/tNi (annually)") and the measurement is not published in the statutory report; the net-zero target's monitoring metrics cell reads "Nil". Both milestone cells read "Nil". Neither target is validated. E-13, E-14, C-01, C-02 | Potential compliance concern: paragraph 35 (see D1-02) | Decision-usefulness concern: the flagship claims of the disclosure cannot be tested by any audience from the disclosure itself | Potential compliance concern · Medium to high | Drives F-4; defeats I3, R1, R2 and feeds I2 | Publish the base-year and current values with the movement and the remaining reduction required |
| D6-02 | On the company's own published series the intensity has risen every year since the base year: 63.93 (CY2022), 65 (CY2023), 65 (CY2024), 72 (CY2025), against a 2035 end-point of about 32. The derivation is confirmed: the metric reproduces as equity emissions over equity nickel in all four years, matching the published CY2022 value to two decimal places. On the CY2022 to CY2024 boundary the CY2025 figure is 78.01, about 22% above the baseline. E-07, E-09, E-28, E-37 | Potential compliance concern on the paragraph 35 trend analysis, which would have to state this | Decision-usefulness concern, escalating to claim-quality: a live, board-approved, publicly repeated commitment is restated without disclosing that its own metric has moved 13% the wrong way, and the year's figure is flattered by a boundary addition | Decision-usefulness concern · High | Drives F-5; escalation chain to A-17 (headline ceiling) and to P2 | State the movement, disclose the denominator, and put the boundary change beside the figure |
| D6-03 | Absolute Scope 1 and 2 have risen 119.3% since the CY2022 base year, from 3,584,263 to 7,862,123 tCO₂e, against an absolute 2050 net-zero target on that base year with no interim milestone and no monitoring metric. Equity nickel output rose 93.5% over the same period, so most of the growth is capacity, not intensity. E-07, E-09, E-28, E-37 | Minor limitation on minimum compliance: the standard does not require an interim milestone | Decision-usefulness concern: an absolute target with no milestone and no monitoring metric, over a footprint that has more than doubled, gives a reader nothing to judge | Decision-usefulness concern · High | Drives F-6; feeds I2, R2 | At least one interim absolute milestone with a monitoring metric, and the absolute position stated against the base year each period |
| D6-04 | The quantified pathway to the 2035 target has been withdrawn. The CY2024 report published a wedge chart: HPAL acquisitions 37 percentage points, low-carbon power 13, production changes 3, carbon and energy management 3, summing to the 50% target. The CY2025 suite carries no pathway; only two mitigation lines reading "Continue development of the Net Zero roadmap" survive. E-10, E-21, and the absence confirmed by full-text search of the CY2025 suite | Minor limitation: a pathway is not itself a required disclosure in these terms, though paragraph 14's transition-plan information is materially incomplete without it | Decision-usefulness concern, and a year-over-year dropped-disclosure finding: the only published account of how the target would be met disappeared in the year its largest wedge slipped and its metric moved adversely | Decision-usefulness concern · High | Drives F-8; feeds I2 and P2 | Republish the pathway with each wedge sized, dated and costed, restated for the deferral |
| D6-05 | The wedge carrying 37 of the 50 percentage points has slipped a year. The CY2024 report expected the Excelsior Nickel Cobalt HPAL project to commission "in the second half of 2025" and intensity reductions to "materialise from 2025 onward"; the CY2025 report dates commissioning to 2026. No restatement of the pathway, no quantification of the deferral's effect on the 2035 end-point, and no fallback. E-10, E-11, E-12 | Minor limitation | Decision-usefulness concern: a point-in-time target is blind to a deferral. The report neither says the target is unaffected nor quantifies the effect, so a reader cannot price the slip | Decision-usefulness concern · Medium to high | Drives F-8; feeds I2. This is the externally dependent, single-project dependency the mining module is written for | Quantify the deferral's effect on the 2035 end-point and disclose the fallback if commissioning slips further |
| D6-06 | The intensity target's stated period is "2025-2035" against a base period of "2022", so the stated target window opens three years after the baseline it is measured from, and the three intervening years, in which the metric rose, fall outside the stated period. E-13, C-03 | Minor limitation: paragraphs 34(a) and 34(b) require the period and the base period, and both are given, but they are not reconciled | Decision-usefulness concern: a reader cannot tell whether the 50% is measured from 2022 or from 2025, which changes the required reduction materially | Decision-usefulness concern · Medium | Drives F-4 | State the target period as running from the base period, or explain the offset |
| D6-07 | The gases covered by both targets are enumerated as CO₂, CH₄, N₂O, HFCs and PFCs, with source descriptions that are not the company's: methane from "coal mining, oil & gas, agriculture (livestock, rice), waste"; nitrous oxide from "fertilisers"; PFCs from "aluminium production, semiconductor manufacturing". SF₆ and NF₃ are absent without a statement that they are not applicable. E-13, E-14 | Minor limitation: paragraph 36(a) requires which gases are covered, and five are named | Decision-usefulness concern: the row describes a national inventory rather than this company's sources, so it implies target reach over sources the company does not have while silently omitting two of the seven gases | Decision-usefulness concern · Medium to high | Drives F-17; feeds R4. Enumerated sets must be complete or expressly bounded | Enumerate the gases actually emitted with the company's own sources beside each, and mark the others not applicable |
| D6-08 | Mitigations against the largest quantified exposure are three investigations and a research concept: "continue development of the Net Zero roadmap", "investigate" captive solar, "investigate" waste-heat recovery, and "explore opportunities of phytomining and bio-leaching technology ... which allows for production of 'carbon-negative nickel'". E-21, C-14 | Minor limitation | Decision-usefulness concern: a reader cannot distinguish committed, funded measures from options under consideration, and a laboratory-stage concept is presented against a US$283 million a year exposure. Recorded as claim quality, not as an allegation | Decision-usefulness concern · Medium | Drives F-18; feeds I2 | Separate committed measures, each with source, abatement, timing and cost, from options under investigation |
| D6-09 | The stated intention to continue developing the roadmap, and the described intention to extend renewable capacity, are forward disclosures. On the CY2024 to CY2025 evidence the roadmap intention has now been restated across two periods while the published pathway has been withdrawn rather than developed. E-10, E-11, E-21 | Not a compliance matter | Forward candour is neither a fault nor a credit on a single statement. Across two periods, with the pathway withdrawn in the second, the pattern is the finding: the intention has been restated and the supporting disclosure has gone backwards | Decision-usefulness concern · Medium | Feeds D6-04 and I2. Recorded as a pattern finding on multi-period evidence, not as evidence that the present treatment is wrong | Deliver the roadmap, or state what has changed and when it will be published |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D7-01 | The net-zero target "is reviewed quarterly by the Risk Management and Sustainability Committee". The same report states the charter requires at least four meetings a year and that "in 2025 there were only two formal meetings held"; the audited Directors' Report records two held and two attended. E-14, E-15, E-16, C-06 | Potential compliance concern: a statement in a director-declared statutory report that the same annual report contradicts | Claim-quality concern: the governance cadence asserted for the target did not occur as described, and the contradiction is internal to one annual report | Potential compliance concern · High | Drives F-12; defeats P1 and feeds G2 | Hold the reviews, or describe the cadence that occurred |
| D7-02 | The Risk Management and Sustainability Committee comprises three executive directors and one non-executive director, with three associate members drawn from management, and the report offers the executive composition as the reason oversight is nonetheless effective. The Audit and Remuneration Committees are staffed by the two independent non-executive directors. E-15, E-16 | Minor limitation: committee composition is a governance-code matter rather than an AASB S2 requirement, and it is disclosed | Decision-usefulness concern: the body that approves the climate targets and reviews progress is majority-executive, which bears on how much independent challenge the targets receive | Decision-usefulness concern · Medium | Feeds D7-01 and I2 | Add independent membership, or explain the composition against the charter's objectives |
| D7-03 | Executive incentives carry no emissions or intensity metric. Performance rights: relative TSR 30%, EPS 30%, a 40% basket of strategic objectives bundling customer diversification, a charitable foundation, an increased sales quota and the transition to electric trucks, with no weighting inside the basket. Short-term incentive: six metrics including "ESG, including MSCI rating, society and governance", weightings not disclosed; 58% of fixed remuneration awarded to two executive directors. The climate report describes these as "specific sustainability related performance conditions". E-17, C-07 | Minor limitation: paragraph 29(g) asks whether and how climate considerations are factored into remuneration, and the entity does describe them | Decision-usefulness concern: what is rewarded is a third-party rating and an equipment programme, not the emissions outcomes the company has committed to. A process and input metric is not a performance metric, and the undisclosed weighting inside a mixed basket means the climate share cannot be sized | Decision-usefulness concern · Medium to high | Drives F-13 | Link a disclosed share of incentive pay to the intensity or absolute target, with threshold, target and stretch levels |
| D7-04 | Assurance is limited in level and narrow in scope: governance paragraph 6, strategy subparagraphs 9(a), 10(a) and 10(b), and Scope 1 and Scope 2 with the accompanying methodology. The targets, the quantified financial effects, the scenario analysis and the risk-management section are outside scope. The conclusion is unmodified, with an Emphasis of Matter on the Directors' Declaration re-issuance. A separate moderate-level AA1000 statement covers the voluntary report's material topics and expressly excludes forward-looking statements and financial data. E-27, E-34 | No apparent issue: the statutory assurance minimum for a first year is phased and the precise minimum is not established from the sources held, so the scope is neither credited as exceeding it nor marked as falling short | Decision-usefulness concern: the two disclosures carrying the largest numbers, the target pathway and the US$283 million to US$411 million transition estimates, are the ones no assurance reaches. Holding assurance is baseline and is not credited | Decision-usefulness concern · High | Feeds A4, I2, G1 and F-26 | Extend assurance to the targets, the intensity metric and the quantified financial effects |
| D7-05 | Climate appears nowhere in the audited financial statements or their notes, against a connectivity statement asserting a cohesive view with them, a self-identified 35% of total assets exposed, and a US$283 million a year carbon-price estimate by 2030. The climate report records "No impact to the carrying amount of assets and liabilities reported in the related financial statements". E-19, E-20, E-24, E-30, E-31, C-08 | Potential compliance concern: paragraph 15's connected-information requirement and the financial-effects requirements are asserted rather than evidenced | Decision-usefulness concern: an investor invited to a cohesive view finds the two halves of the annual report do not meet, and cannot tell whether the exposure was considered and dismissed or not considered | Decision-usefulness concern · High | Drives F-15; feeds G2 and the legal lens | Carry the climate assumptions into the key estimates and impairment disclosures, or explain why an exposure of this size bears on no carrying amount |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D8-01 | Mining hard-abatement pathway. Scope 1 is dominated by coal used as a reductant and for smelting heat: about 1.59 million tonnes of coal across four grades, 32.55 million GJ, plus 285 million cubic metres of coking oven gas and 10,465 tonnes of electrode paste. No site-level or source-level abatement pathway is disclosed for any of it. The disclosed actions address mobile fuel and site electricity, which together are a small fraction of the footprint. E-04, E-06, E-32 | Minor limitation | Decision-usefulness concern: cleaner electricity and fleet electrification are positive but are not a mining decarbonisation plan while the reductant and process heat remain material and unaddressed. Transparency about the technology difficulty would not cure the absence of a pathway, and none is offered either | Decision-usefulness concern · High | Feeds I2, R2, F-8 | A source-level pathway for coal reductant and process heat, with technology, timing, expected reduction and residual treatment |
| D8-02 | Electrification case study versus transition pathway. The electric fleet went from 8 to 37 haul trucks at one mine, with 20 loaders, 4 excavators and 1 forklift at the plants. Fleet share, capital cost, site coverage and expected abatement are not disclosed. Mobile fuel combustion was 17,985 tCO₂e in the prior period, about 0.3% of the footprint. E-07, E-32 | Not applicable | Qualified positive on delivery (F-3), and expressly not a transition plan: the case study is not linked to a quantified pathway for the material sources | Positive (above baseline), qualified · High | Recorded at §4.1 item 3, with the scale qualification | Rollout potential, sites covered, fleet share, capex, timelines and expected reduction |
| D8-03 | Industrial process emissions pathway. Where Scope 1 is dominated by process and reductant emissions, a specific hard-abatement pathway is required rather than renewable electricity procurement. The disclosure names candidate technologies (organic Rankine cycle waste-heat recovery, direct-to-sulfate refining, dry-stack tailings, phytomining) as items to investigate, without source, abatement, timing or cost for any of them. E-21 | Minor limitation | Decision-usefulness concern: the dominant Scope 1 source has no identified abatement technology with implementation timing, expected reduction or residual treatment | Decision-usefulness concern · High | Feeds I2, F-18 | Identify the process-emissions source, the abatement technology, the timing, the expected reduction and the residual treatment |
| D8-04 | Transition-commodity narrative versus emissions performance. The strategy is framed on nickel for the electric-vehicle supply chain, HPAL producing mixed hydroxide precipitate, "lower carbon nickel units", and ENC as a "global showcase for sustainable, high quality, low carbon nickel production". Over the same period reported emissions rose 18.3%, intensity rose about 11%, and no product-level carbon figure is published. E-12, E-29, C-10, C-11 | Not applicable | Claim-quality concern: supplying transition inputs is a strategic opportunity claim, not evidence of emissions reduction. Where the narrative is used as a headline while absolute and downstream emissions remain high or rising, it is classified as potentially overstated. Restated plainly: the company may be supplying inputs used in the transition, and that does not show its own activities are decarbonising | Decision-usefulness concern · Medium to high | Feeds P2, F-11 | Publish a product-level carbon footprint per tonne of nickel by route, and the downstream emissions the product creates when processed |
| D8-05 | Gross Scope 1 and Scope 2 separation by source. Scope 1 and Scope 2 are reported separately, which the module requires, but neither is broken down: no split of Scope 1 by reductant, smelting fuel, mobile fuel or land use; no market-based Scope 2; no separation of process emissions from energy emissions; and the prior year's stationary-versus-mobile split has been dropped. A reader cannot see whether fleet or stationary electrification is occurring in the numbers. E-04, E-07, E-26 | Minor limitation on the standard's minimum | Decision-usefulness concern, and the module treats insufficient source-level detail as serious where operational emissions are material: the pathway for fleet, stationary energy, process emissions and purchased electricity cannot be seen separately | Decision-usefulness concern · High | Drives F-14; defeats A4 in part | Restore and extend the source-level breakdown, and publish both Scope 2 bases |
| D8-06 | Downstream processing of sold products. Nickel pig iron is sold for stainless-steel smelting; Category 10 is not disclosed, not estimated, not bounded, not in any target, and no influence pathway is described. The company identifies its customer concentration and the regulatory risk attaching to embodied emissions, and does not size the emissions themselves. E-22, D4-02 | Not applicable for the period under the relief | Decision-usefulness concern: where downstream processing dominates it should drive the Scope 3 assessment, and a high overall rating is not available while it is unresolved even though operational emissions are reported | Decision-usefulness concern · High | Drives F-10; defeats A1 and R2 | A Category 10 estimate by product route with methodology, and a disclosed influence pathway |
| D8-07 | Technology pilots are not scaled pathways. The 2035 target rested on HPAL acquisition, now deferred to 2026; the mitigations named against carbon pricing are investigations; and phytomining and bio-leaching, described as enabling "carbon-negative nickel", is a laboratory-stage concept with no disclosed scale, timing, cost or fallback. E-12, E-21, C-14 | Not applicable | Decision-usefulness concern: innovation activity is not delivered decarbonisation, and full transition-plan credit is not available without scale, timing, expected abatement, investment, deployment pathway and commercial readiness. A delivery-risk caveat applies | Decision-usefulness concern · Medium to high | Drives F-18; feeds the technology risk lens | For each named technology: commercial readiness, the source addressed, expected abatement, timing, capex and a fallback |
| D8-08 | Renewable electricity must not obscure Scope 1. Scope 2 is 48% of the footprint and Scope 1 is 52%, and within Scope 1 the reductant and smelting coal dominate. The renewable measures disclosed are a 396 kWp site array and a post-period HPAL supply agreement; no separate Scope 1 decarbonisation pathway is disclosed, and Scope 1 rose 38.2% in the period. E-04, E-06, E-32 | Not applicable | Decision-usefulness concern: full operational transition credit is not available where Scope 1 is material, rising and insufficiently explained, whatever the electricity story | Decision-usefulness concern · High | Feeds I2, I3, F-7 | A separate, quantified Scope 1 decarbonisation pathway |
| D8-09 | Inherited exposure through equity interests. The company holds 44% of a pre-operational HPAL project (US$1,012.0 million) and 10% of an operating one, and equity accounted investees are 29% of total assets. The operating investee's disclosed emissions imply about 7.4 tCO₂e per tonne of nickel, well below the group's 72, so the interests are not inherently growth-exposed on intensity; but the absolute emissions the 44% interest will add are not estimated and are not reconciled against either target. E-03, E-04, E-12, E-20, E-28 | Not applicable: not a financial institution and no financed-emissions obligation arises | Decision-usefulness concern: the look-through exposure is disclosed as a holding and not quantified as emissions. No number is manufactured here; the magnitude is cannot-verify | Decision-usefulness concern · Medium | Drives F-11 and I5; feeds F-23 | A design-capacity emissions estimate at the equity share, reconciled against the group's own targets |
Financed-emissions target headroom & benchmark (SEC-FI-TGT-04): *N/A: not a financial institution.*
| Sector target | Latest reported | Target value | % change permitted | Flat-line benchmark | Fossil-fuel override? | Ruling |
|---|---|---|---|---|---|---|
| N/A | N/A | N/A | N/A | N/A | N/A | Not applicable: not a financial institution and no financed or facilitated emissions target exists |
| ID | Finding & evidence chain | Min-compliance | Decision-usefulness / claim-quality | Severity · Confidence | Consequence | What would fix it |
|---|---|---|---|---|---|---|
| D9-01 | Physical risk is disclosed hazard by hazard with a single-year cost estimate at 2030, 2040 and 2050, a status of "Increasing" for each, named mitigations, an asset-exposure table by carrying value and share of total assets, three IPCC SSP scenarios, and a realised in-period event costed at about US$5.8 million with the two-day outage named. The cumulative rows sum correctly. E-18, E-19, E-20, E-22, E-23 | No apparent issue: paragraphs 10, 20 and 22 are addressed with quantification | Positive (above baseline): the exposure is sized, tied to identified assets and tested against a realised event, which is materially more than a qualitative account of exposure | Positive (above baseline) · High | Recorded at §4.1 item 1. Passes I1 and supports R3 | Nothing on the disclosure. Extending assurance to it would strengthen reliance |
| D9-02 | Two hazards are expressly not quantified: landslide associated with steep terrain, heavy rainfall and deforestation, and downstream value-chain extreme weather. The second is attached to a buyer market the company describes as concentrated in China, and the report says it "has the potential to materially affect revenues and asset values" | No apparent issue: the standard permits non-quantification where the information is not available without undue cost or effort, and reasons are given | Minor limitation: the two open hazards include the one with the largest stated potential effect on revenue, so the quantified total understates the assessed exposure by an unstated amount | Minor limitation · Medium | Qualifies §4.1 item 1; feeds F-26 | A bounding estimate or a stated range for each, or the specific data limitation that prevents one |
| D9-03 | Nature and biodiversity are disclosed in the voluntary report: 41 hectares rehabilitated at Hengjaya Mine in the period, 2,057 hectares since 2019, 2,258,500 trees planted, biodiversity monitoring evidencing ecosystem recovery in 7 to 8 year reclamation areas, and a Green PROPER rating. Land-use deforestation and reforestation appear as emission source categories in the CY2025 method table for the first time, without figures | No apparent issue | No apparent issue: baseline (not credited) on the rehabilitation disclosure. The new land-use emission categories are unquantified, which feeds the completeness question at D2-06 rather than the nature module | No apparent issue: baseline (not credited) · Medium | Feeds D2-06 | Quantify the land-use emission and removal categories now that they are in the method table |
| D9-04 | The realised event of the period originated in a tailings facility the group does not own or operate but which sits inside the same industrial park as its assets. The report states that impacts beyond the group's own assets "fall outside of the Groups obligations", and lists mitigations that depend on the park operator. E-18, E-22 | No apparent issue: the facility is outside the group's boundary, and a source outside the boundary requires no quantification by the group | Decision-usefulness concern, narrow: the group's exposure to a third-party facility is real and was realised at about US$5.8 million, and the mitigations for it are described as things to be done with the operator rather than commitments the group controls | Minor limitation · Medium | Feeds the physical risk lens | State what the group can require of the park operator, and what its residual exposure is if the operator does not act |
| Base issue | Chains to | Rule + evidence IDs | Escalated severity |
|---|---|---|---|
| No progress or base-year value published for either target (D6-01) | The headline-claim ceiling. The two claims the disclosure leads with are unmeasurable from it, so no audience can test them, and the ceiling governs the overall position rather than the operational and risk disclosure holding it up | A-17, S2-38, S2-39, T-01; E-13, E-14, E-05 | Decision-usefulness concern escalated to the governing constraint on all five audience scores |
| Intensity risen 13% against the base year, undisclosed (D6-02) | The reader-impression test on the restated commitment. A reader of the CY2025 suite meets commitment and progress language with the adverse movement absent, so the composite impression is of a company reducing its intensity | OUT-TB-02, A-17, A-19; E-07, E-09, E-33, E-37 | Escalated to a misleading-impression risk at P2, stated as risk and not as an allegation |
| Undisclosed factor, method and boundary change (D2-03, D2-04, D3-02) | Target integrity and the real-versus-accounting test. The base year sits on a superseded basis, so the target's own arithmetic is not like-for-like, and the year's movement cannot be attributed | G-10, T-BASE-01, A-19, G-BAU; E-08, E-26, E-38 | Escalated: defeats A3 and feeds I3, because the same change that moved the reported figure also moved the yardstick |
| Pathway withdrawn in the year the largest wedge slipped (D6-04, D6-05) | Target confidence and technology delivery risk. The dependency is a single project, the deferral is unquantified, and the account of how the target is met is no longer published | T-DEP-04, SEC-MIN-05, SEC-MIN-11, YOY-05, YOY-06; E-10, E-11, E-12 | Escalated: defeats I2 and drives the technology risk lens |
| Quarterly review asserted, two meetings held (D7-01) | Literal truth of a public statement, and cross-source consistency. The contradiction is internal to one director-declared annual report | OUT-EXT-04, A-17, GOV-01, DR-02; E-14, E-15, E-16 | Escalated: defeats P1 and feeds G2 |
| Competing footprint totals and a mis-stated unit (D2-01, D2-02) | Liftability and audience consistency. A carbon accountant must choose between two published totals, and the statutory and voluntary presentations of one figure disagree | GHG-STD-08, A-01B, DR-02; E-04, E-05 | Escalated: defeats A2 and feeds G2 |
| Scope 3 wholly absent, and both targets Scope 1 and 2 only (D4-01, D4-02, D8-06) | Target coverage and confirmable completeness. The category that dominates the value chain is neither counted nor targeted, and the rebuttal test is not met | OUT-STK-13, S3-25, SEC-MIN-10, T-01; E-02, E-22 | Escalated: defeats A1 on usability and R2 on coverage. Expressly not escalated to G1, because the election is lawful (Annex L, L-01) |
| Assurance stops short of the targets and the quantified effects (D7-04) | Reliance on the two largest disclosures in the report. The pathway and the US$283 million to US$411 million estimates carry no assurance | GOV-12, A-11, A-05; E-27, E-19 | Escalated: feeds A4, I2, G1 and F-26 |
| Climate absent from the financial statements against an asserted connectivity (D7-05) | Financial-effects integrity and the legal lens. The disclosure asserts a cohesive view that the statements referred to do not contain | S2-15, S2-22, DR-02; E-30, E-31, E-24 | Escalated: drives F-15 and the legal exposure at §5.2 |
| No emissions metric in executive incentives, presented as sustainability conditions (D7-03) | Claim quality on the incentive description, and target credibility. Pay is tied to a third-party rating and an equipment programme, not to the emissions commitments | GOV-08, GOV-09, T-PROC-05; E-17 | Escalated modestly: feeds I2 and R4; does not on its own defeat a criterion |
| Screen | Output | Basis |
|---|---|---|
| Required Interventions Schedule | Potentially applicable; evidence required | Coal used as a reductant and for smelting heat, coking oven gas, an on-site captive coal-fired power supply through the industrial-park grid, and a diesel and biodiesel mobile fleet are all sources for which the standard's Required Interventions Schedule prescribes interventions and dates. The measures currently disclosed are framed as investigations rather than scheduled obligations. Evidence required: the equipment inventory, the fuel and energy contracts, the park power-supply arrangements and the capital plan |
| Clean Alternative Assessment | Potentially applicable; evidence required | Waste-heat recovery through organic Rankine cycle systems, captive solar with storage, coking oven gas substitution and electrification of mobile and stationary equipment are all named by the company as options and none is assessed against a clean alternative on a documented basis. A Clean Alternative Assessment would be required before any credit use under the standard, and the 2050 target already contemplates credits in "a limited and supportive role". Evidence required: the option set, the costed assessment and the decision record |
| Prohibited Activities Schedule | Not apparently applicable | Nickel mining, rotary kiln electric furnace processing and high pressure acid leach processing are not activities on the Prohibited Activities Schedule. Coal is consumed as an industrial reductant and fuel rather than extracted or traded, and no thermal coal, oil and gas extraction, native forest logging or equivalent prohibited activity is disclosed. Recorded as a screen only, on the reviewed materials |
| Rule family | Applied? | Result |
|---|---|---|
| Applicability gate (L / S2-01..06) | Yes | In scope. Group 1 entity, first mandatory annual reporting period ended 31 December 2025. Paragraph C3 and C4(b) reliefs available and declared. Paragraph 35 target-performance disclosure absent: potential compliance concern (D1-02) |
| GHG inventory foundation (G / GHG-STD) | Yes | Equity share boundary declared. Competing totals (G-06, GHG-STD-08), undisclosed method, factor and boundary change (G-10), unnamed immaterial exclusions (G-02, G-03). Findings D2-01 to D2-08 |
| Scope 1 (G-06 / S2-26) | Yes | Reported at 4,098,940 tCO₂e with no source decomposition and an unsized product-carbon deduction; rose 38.2% on flat non-electric energy. Findings D2-05, D2-07, D8-05 |
| Scope 2 & renewables (E / S2-28) | Yes | Location-based only, for every period; no market-based figure and no statement on contractual instruments. Reported flat while consumption fell 18.9% and the implied factor rose 24.4%. Findings D3-01 to D3-04. E-24 and OUT-TB-21 applied to the site solar claim, which is bounded on its face |
| Scope 3 (S3 / S3A / G-15) | Yes | Not disclosed under the paragraph C4(b) relief. Assessed on usability, not permission: no bounding estimate, no category breakdown, so the OUT-STK-13 rebuttal is not met. G-20's which-scope test applied to the third-party tailings facility and to the downstream chain: the tailings facility is outside Scope 1 and 2 on the consolidation approach, while downstream processing is squarely Scope 3 and the consolidation approach does not reach it. Findings D4-01 to D4-05 |
| Offsets / net claims (E-08..22 / G-11) | Yes | No credits used in the period, disclosed and not credited (A-18, A-16). The 2050 target's absolute-versus-net contradiction and the unbounded credit role are live. Findings D5-01 to D5-03 |
| Targets & transition (T / S2-14/15/40) | Yes | Intensity-only near-term target (T-14) with no milestone, no published baseline value and no progress; absolute 2050 target with no monitoring metric; base-year comparability broken by an undisclosed boundary and method change (T-BASE-01); single-project dependency deferred (T-DEP-04); pathway withdrawn. Findings D6-01 to D6-09 |
| Governance / remuneration / assurance (GOV / A-11) | Yes | Quarterly review asserted against two meetings held; majority-executive committee; no emissions metric in incentives; assurance narrow and not reaching the targets or the quantified effects; climate absent from the financial statements. Findings D7-01 to D7-05 |
| Sector (SEC-*) | Yes: mining | SEC-MIN-01, -02, -03, -06, -08, -09, -10, -11 and -12 all fired. Findings D8-01 to D8-09 |
| SEC-FI-TGT-04 | Not applied | Not a financial institution |
| SEC-FI-05A | Not applied | Not a financial institution |
| SEC-SF / SEC-INV-LT | Partly | SEC-SF-11 applied: prior-period reports are context, not current disclosure, and the rating derives from CY2025. SEC-INV-LT-17 and T-INV-01 applied by analogy to the equity interests: exposure raised, magnitude left cannot-verify, no number manufactured. Finding D8-09 |
| NOCO2-MAP-01/02 | Yes | Every material finding mapped to a specific clause in §6.1; §6.1 clause column drawn from the clause map |
| Nature / physical risk (N) | Yes | N-01 to N-03 applied. The physical-risk disclosure is the report's genuine positive; N-04 relevance-and-transparency scope stated, modelling quality not assessed. Findings D9-01 to D9-04 |
| Disclosure risk (DR-01..07 / A-01C) | Yes | Cross-source matrix built; NGER lookup returned no match (not a controlling corporation, absence not zero). Six divergences survive normalisation. Annex J |
| Year-over-year (YOY-01..08) | Yes | Four periods and three report types. Restatement without disclosure (YOY-04), five dropped disclosures (YOY-05), target support weakened while wording unchanged (YOY-06), cross-report-type divergence widening (YOY-07). Annex K |
| ID | Item | Pack | Evidence requested | Status |
|---|---|---|---|---|
| F-19 | The split of the CY2024 to CY2025 emissions increase between physical change, emission-factor change, fuel-taxonomy change and boundary addition | Target progress and inventory restatement | The CY2024 inventory restated on the CY2025 method and factor set; the factor values applied in each year by source; and a component split of the 18.3% movement into activity, factor, method and boundary | Open: cannot verify, material evidence missing |
| F-20 | The denominator of the published emissions-intensity metric | Target progress | The tonnes of nickel used in the CY2025 calculation, the equity shares applied, the entities included, and the same for each prior year published | Open: cannot verify as published. Derivable and derived at E-37; the derivation is not a substitute for disclosure |
| F-21 | Whether the CY2022 base-year intensity is on the same boundary as the CY2025 figure | Target progress | A restated CY2022 inventory and intensity on the current boundary, or the CY2025 figure on the CY2022 boundary, with the reconciliation | Open: cannot verify, material evidence missing |
| F-22 | The magnitude of the nickel pig iron product-carbon deduction in CY2025, and therefore gross Scope 1 | Scope 1 inventory | The deduction for the period, the mass-balance calculation, the assay basis and gross Scope 1 before the deduction | Open: cannot verify, evidence not provided |
| F-23 | The emissions of the Excelsior Nickel Cobalt project once operating, and of the sources excluded as immaterial | Inventory completeness and look-through exposure | A design-capacity emissions and intensity estimate at the 44% equity share; and a named list of the sources excluded as immaterial with a bounding estimate and the threshold applied | Open: cannot verify, material evidence missing |
| F-24 | The market-based Scope 2 position, and whether any contractual instruments are held | Renewable electricity and Scope 2 | The market-based Scope 2 figure for the period, or a written statement that no renewable energy certificates, power purchase agreements or equivalent instruments were held; and the residual mix if any were | Open: cannot verify, material evidence missing |
| F-25 | How the 262 MWp solar project's output and environmental attributes will be accounted for | Renewable electricity | The offtake structure, the share attributable to the company's equity interest, the treatment of environmental attributes, and the intended Scope 2 accounting basis | Open: cannot verify, evidence not provided. Post-period, and relevant to CY2026 |
| F-26 | The reasonable-grounds basis for the quantified 2030 to 2050 financial effects and for the 2035 target pathway | Assurance and financial effects | The hazard-modelling assumptions and methodology, the carbon-price trajectory and scenario mapping used for the US$283 million to US$411 million estimates, the discount basis, and the pathway arithmetic behind the 2035 end-point | Open: cannot verify, material evidence missing |
| CV9 | The GHG inventory methodology document or calculation workbook | Inventory foundation | The methodology document, the factor register with values and vintages, and the calculation workbook for CY2025 | Open: document not provided. This is a limit on the review, not a finding against the company |
Every request above asks for a factual source. None asks the company to make a compliance judgement.
| Chain ID | Trigger | Follow-up scans run | Evidence IDs | Final label |
|---|---|---|---|---|
| M-01 | Net-zero claim detected: "achieve net-zero emissions by 2050" | Target boundary; transition plan; Scope 1, 2 and 3 coverage; gross versus net; residual emissions; offsets and credits; assurance scope; prior claims; reader-burden caveats | E-02, E-13, E-14, E-27, E-32, C-02, C-13 | Decision-usefulness concern: absolute target with no interim milestone, no monitoring metric, contradictory absolute-versus-net labelling and an unbounded credit role |
| M-02 | Target achievement and on-track language: "remains committed to its targets of reducing carbon intensity by 50% by 2035" | Boundary; baseline; current-year figure; progress calculation; gross versus net; Scope 3 coverage; method changes; acquisitions; restatements; assurance; remuneration links | E-05, E-07, E-08, E-09, E-13, E-17, E-28, E-37, C-01 | Decision-usefulness concern escalating to the headline ceiling: no progress stated, no baseline value published in the reviewed suite, and the metric has moved away from the target |
| M-03 | Intensity target detected | Absolute trend co-located; T-14 test; absolute cap; headroom derivability | E-07, E-09, E-37, D6-03 | Decision-usefulness concern: intensity-only near-term architecture with absolute emissions up 119.3% since the base year, co-located at §3.3 and §3.4 |
| M-04 | Coverage and completeness language: "No new Scope 1 or Scope 2 emission sources were identified or added"; "sources considered immaterial ... are not included" | Numerator and denominator; excluded categories; materiality threshold; method-table reconciliation | E-25, E-26, E-33 | Cannot verify, medium confidence: the statement cannot be squared with the adjacent method table, and the excluded sources are neither named nor bounded |
| M-05 | Methodology, boundary, factor and base-year change detected | Time-series comparability; baseline recalculation; target progress; real versus accounting movement; acquisitions; peer comparability | E-03, E-08, E-26, E-37, E-38 | Decision-usefulness concern, high confidence: three undisclosed changes with no restatement, breaking the target's own baseline comparability |
| M-06 | Combined "Scope 1 and 2" figure and target detected | Mandatory decomposition into Scope 1 and Scope 2, and Scope 2 into location and market basis; per-source split; driver attribution | E-04, E-06, E-07, E-38 | Decision-usefulness concern: decomposed at §3.1, §3.3 and §3.4. Scope 1 rose 38.2% while Scope 2 was flat, and the two move for different reasons. No market-based basis exists |
| M-07 | Any reduction or progress claim: business-as-usual counterfactual test | Scope 2 grid factor versus consumption trend versus instruments; Scope 1 factor versus activity; disclosed split | E-06, E-08, E-38 | Cannot verify on the split (A-05), with the observable facts stated: consumption fell 18.9% and the implied factor rose 24.4%. No number manufactured (ruling L-05) |
| M-08 | Multi-period corpus available: four periods, three report types | Full multi-period series; restatement and rebasing detection; dropped and added disclosures; target weakening or retirement; cross-report-type divergence over time; certification continuity | E-07, E-08, E-09, E-10, E-11, Annex K | Decision-usefulness concern: five dropped disclosures, one undisclosed restatement, target support weakened while wording is unchanged |
| M-09 | Mining sector module triggered | Hard-abatement pathway; electrification case study versus pathway; process-emissions pathway; transition-commodity narrative; gross scope separation by source; downstream processing of sold products; technology pilots; renewable electricity obscuring Scope 1 | E-04, E-06, E-12, E-21, E-22, E-29, E-32 | Decision-usefulness concern across nine module findings (D8-01 to D8-09), with one qualified positive on delivered electrification |
| M-10 | Scope 3 omission detected | Category coverage; business-model-obvious categories; exclusions; data quality; target boundary; consistency; OUT-STK-13 rebuttal test; G-20 which-scope test | E-02, E-22, D4-01 to D4-05, ruling L-01, ruling L-07 | Decision-usefulness concern on usability; expressly no compliance finding, the election being lawful |
| M-11 | Assurance statement detected, twice | Subject matter; level; assured metrics; exclusions; qualifications; whether nearby claims imply broader assurance | E-27, E-34 | Decision-usefulness concern: the targets, the pathway and the quantified financial effects, which carry the report's largest numbers, are outside both assurance scopes |
| M-12 | Climate-linked remuneration detected | Metric boundary; gross versus net; Scope 3 inclusion; offsets and certificates; target progress; controls; process-versus-performance test | E-17, C-07 | Decision-usefulness concern: no emissions or intensity metric, a third-party rating and an equipment programme instead, and no disclosed weighting for the climate item |
| M-13 | Material equity and investment holdings detected: 44% and 10% interests, 29% of total assets | Look-through exposure; indicative quantification where weights and data permit; reconciliation against the entity's own target; no manufactured number | E-03, E-04, E-12, E-20, E-28 | Decision-usefulness concern with the magnitude cannot-verify: the 44% interest is outside every figure and both targets while carrying most of the target |
| M-14 | Australian entity, and metrics appearing in more than one document | NGER register lookup; cross-source consistency matrix; boundary and period normalisation before flagging divergence | E-05, E-16, E-28, E-30, E-31, E-36, Annex J.1 | Decision-usefulness concern: six divergences survive normalisation. Not an NGER controlling corporation, so no statutory anchor exists |
| M-15 | Completeness word beside a named quantity: solar "supplying approximately 20% of the site's electricity needs" | OUT-TB-21 bounded-claim test; coverage reality; boundary disclosure; reasonable-reader impression | E-06, E-32, C-12 | No apparent issue: the claim is bounded on its face to the site and is not presented as a group position. Immaterial to the group figure |
| M-16 | Disclosed intention to review, extend or improve detected | A-21 test; independent assessment of the present treatment; multi-period pattern test | E-11, E-21, E-10, ruling L-08 | Neutral on the single statement; decision-usefulness concern on the two-period pattern, where the pathway was withdrawn rather than developed |
| M-17 | Source described as operated by another party: the IMIP tailings facility | G-20 which-scope test; consolidation approach; boundary testability; residual exposure | E-18, E-22, ruling L-07 | Out of boundary, not excluded: no quantification required and no material-exclusion finding. The group's residual exposure is recorded at D9-04 |
| M-18 | Transition-materials narrative detected: nickel for the electric-vehicle supply chain, "low carbon nickel units", ENC as a "global showcase" | SEC-MIN-06 and SEC-MIN-08: product role versus own emissions; production emissions quantified; downstream emissions quantified; absolute pathway beside product-growth claims | E-12, E-29, C-10, C-11 | Decision-usefulness concern: enablement framing, not emissions evidence, against rising reported emissions and no published product-level carbon figure |
O.1 Cross-source consistency matrix (DR-02)
| Claim / metric | Annual / financial report | Sustainability / ESG | Marketing / website | Climate Active PDS | CDP | Investor presentations | NGER / CER / Safeguard | Boundary/period normalisation | Divergence? |
|---|---|---|---|---|---|---|---|---|---|
| Scope 1 and 2 total, CY2025 | 7,862,123 tCO₂e as four rows in the AASB S2 report within the annual report, director-declared and KPMG-reviewed | 7,849,014 tCO₂e in the performance highlights; the same four rows reproduced later in the same document | Not stated separately | Not applicable | Not filed | Not reviewed for the period | Not a controlling corporation | Same period, same boundary, same document family; no normalisation needed | Yes: 13,109 tCO₂e, unreconciled and not reproducible from the disclosed components |
| Emissions intensity, CY2025 | Not disclosed | 72 tCO₂e per tonne of Ni, single figure, no comparative, no denominator | Not stated | Not applicable | Not filed | Not reviewed | Not applicable | Same period; the denominator basis is unstated and had to be derived | Yes, by omission: the metric the flagship target is written in is absent from the statutory report that makes the target |
| Target base-year value | Not disclosed | Not disclosed in the CY2025 report; 63.93 in the CY2022 report and 64 in the CY2024 report | "reducing carbon intensity by 50% by 2035" stated with no baseline value | Not applicable | Not filed | Not reviewed | Not applicable | The base-year value is a target parameter, not a comparative, so the C3 relief does not explain its absence | Yes, by omission: absent from both reviewed-period documents |
| Review cadence for the 2050 target | Directors' Report: Risk Management and Sustainability Committee, 2 meetings held, 2 attended; charter requires at least four | AASB S2 report in the same annual report: "reviewed quarterly by the Risk Management and Sustainability Committee" | Not stated | Not applicable | Not filed | Not reviewed | Not applicable | Same period, same document; no normalisation available | Yes: two statements in one annual report that cannot both hold |
| Connectivity with the financial statements | Financial statements and notes contain no reference to climate, in any key estimate, impairment assumption or asset life | AASB S2 report: the report "makes connections with other reports, including the financial statements, to present a cohesive view" | Not stated | Not applicable | Not filed | Not reviewed | Not applicable | Same period, same document | Yes: the connection asserted is not present in the statements referred to |
| Nickel production volume | 124,966 tonnes for CY2025, in the audited Review of Operations | Not disclosed in the CY2025 sustainability suite; disclosed for CY2022 to CY2024 in the CY2024 report | Not stated | Not applicable | Not filed | Not reviewed | Not applicable | The sustainability series used a 100% basis while the intensity uses an equity basis; normalisation requires applying undisclosed equity shares | Yes, by omission: the denominator of the target metric was published for three years and is now only in the financial narrative, on a different basis |
| Emission-source completeness | Not addressed | "No new Scope 1 or Scope 2 emission sources were identified or added ... during the reporting period", beside a method table listing coking oven gas, anthracite, sub-bituminous coal and land-use categories absent from the prior taxonomy, and a Chairman's account of extending coking oven gas to two plants in Q4 | Not stated | Not applicable | Not filed | Not reviewed | Not applicable | The wording may be read as period-internal; the company does not say which | Cannot verify: not recorded as a divergence, because an undisclosed reading is not a contradiction |
| Calculation standard | Not addressed | GHG Protocol Corporate Standard 2004 (CY2025); ISO 14064-1:2018 plus the GHG Protocol (CY2024) | Not stated | Not applicable | Not filed | Not reviewed | Not applicable | Different periods; the change is real and is not disclosed as one | Yes across periods: recorded at Annex K.2 rather than as a within-period divergence |
| Solar project capacity | Not addressed | 262 MWp and 80 MWh (CY2025); 255 MWp and 80 MWh (CY2024) | Not stated | Not applicable | Not filed | Not reviewed | Not applicable | Different periods; a project specification may legitimately change | No: recorded as a restatement at Annex K.2, immaterial to any figure relied on |
O.2 NGER statutory reconciliation (A-01C): *N/A: not an NGER controlling corporation for the period. Recorded, not left blank; absence from the register is not evidence of zero emissions.*
| Metric | Disclosed (report) | NGER register (year · as-at) | Boundary difference (op-control / AU-only / method / period) | Reconciled? | Label |
|---|---|---|---|---|---|
| Scope 1 | 4,098,940 tCO₂e (equity share, wholly Indonesian operations) | No row. Lookup run against reference/ngers-register-2024-25.csv on 3 September 2026 | Total: the register covers Australian facilities under operational control, and the group operates none | Not applicable | Not a controlling corporation for FY2024-25 |
| Scope 2 (location-based) | 3,763,183 tCO₂e (Indonesian grids: PLN and IMIP) | No row | Total, as above | Not applicable | Not a controlling corporation for FY2024-25 |
| Net energy (GJ) | 54,044,036 GJ (equity basis) | No row | Total, as above | Not applicable | Not a controlling corporation for FY2024-25 |
O.3 Disclosure-risk register (DR-01 / DR-03..DR-07)
| # | Lens | Exposure & confidence | Driver (finding / evidence IDs) | Cross-source link (DR-02) | What would reduce it |
|---|---|---|---|---|---|
| O-01 | Legal: misleading conduct and disclosure | Elevated; medium to high confidence | A quantified, dated commitment repeated in a director-declared statutory report, with the base-year value, the current value and the movement all absent, while the company's own earlier reports show the metric rising about 13% and the supporting pathway has been withdrawn. F-4, F-5, F-8; E-13, E-33, E-37 | The base-year value and the intensity metric rows of O.1 | Publishing the movement against the baseline in the statutory report, with the boundary change named |
| O-02 | Legal: director duty and statement accuracy | Moderate to elevated; high confidence | A statement in the statutory report about the period ("reviewed quarterly") that the audited Directors' Report in the same annual report contradicts. F-12; E-14, E-15, E-16 | The review-cadence row of O.1 | Correcting the statement, and holding the reviews the charter requires |
| O-03 | Regulatory: AASB S2 | Elevated; high confidence | Paragraph 35 requires performance against each target and a trend analysis, and none is given for either target, on a section outside the assured scope. No relief reaches paragraph 35. D1-02, D6-01; E-13, E-14, E-27 | The intensity metric and base-year rows of O.1 | Adding the target-performance and trend disclosure |
| O-04 | Regulatory: Corporations Act Chapter 2M | Low to moderate; high confidence | The section 296D Directors' Declaration was omitted from the release of 23 February 2026 and supplied by re-issuance on 10 March 2026, requiring a superseding auditor's report and an Emphasis of Matter. D1-03; E-27 | Not a cross-source divergence: self-identified and cured | Already remediated. A pre-lodgement completeness control would prevent recurrence |
| O-05 | Regulatory: ASIC RG 280 and forward-looking statements | Moderate to elevated; medium confidence | Quantified forward effects from US$283 million to US$411 million, and a 50% target end-point, published with no disclosed basis, no assumptions and no assurance. F-26; E-19, E-21 | Not a divergence: an absence of basis | Documenting and disclosing the modelling assumptions, the carbon-price trajectory and the pathway arithmetic |
| O-06 | Technology: dependence on unproven or deferred abatement | Elevated; high confidence | Over half the 2035 target rested on one project that has slipped a year; the pathway showing that has been withdrawn; the named mitigations against the largest exposure are three investigations and a laboratory-stage phytomining concept described as producing "carbon-negative nickel"; and the dominant Scope 1 sources have no pathway. F-8, F-18, D8-01, D8-03, D8-07; E-10, E-12, E-21 | Not a divergence: a delivery-risk exposure | A wedge-by-wedge pathway with sized, dated and costed measures, and a separate Scope 1 pathway |
| O-07 | Physical: disclosure consistency | Moderate; medium confidence | The physical-risk disclosure is the most fully quantified element of the report, but its figures are unassured, two hazards including the one with the largest stated revenue effect are unquantified, and none of it reaches the financial statements, which contain no reference to climate against a self-identified 35% of total assets exposed. F-15, D9-02; E-19, E-20, E-30, E-31 | The connectivity row of O.1 | Carrying the assumptions into the key estimates and impairment disclosures, and bounding the two open hazards |
| O-08 | Market and commercial access | Moderate to elevated; medium confidence | The company names the exposure itself: European border-adjustment mechanisms and battery passports that price embodied emissions "could reduce the demand from Nickel Industries products", against a buyer market it describes as concentrated in China, while its own intensity rises, its Scope 3 is unpublished and no product-level carbon figure exists. D8-04; E-22, E-29 | The intensity metric row of O.1 | A verified product-level carbon footprint per tonne of nickel by route, and a disclosed downstream Scope 3 position |
| O-09 | Reputational and financing | Moderate; medium confidence | The report itself states that "reputational impacts and tighter ESG expectations from investors, lenders and insurers may also affect revenue, cost of capital and access to financing if transition plans are not perceived as credible", and the transition plan is the part of this disclosure that a reader cannot test. E-19, D6-04 | Not a divergence | Republishing a testable pathway and stating progress each period |
P.1 Multi-period headline series (YOY-02): *value as stated, with the source it came from, per period.*
| Metric / claim | Period → | CY2022 | CY2023 | CY2024 | CY2025 | Source(s) per cell | Boundary/method normalisation |
|---|---|---|---|---|---|---|---|
| Scope 1 | 1,770,086 | 3,193,569 | 2,934,253 | 4,098,940 | CY2022 report folio 42 (CY2022); CY2024 report folio 39 (CY2023, CY2024); AASB S2 report folio 61 (CY2025) | CY2022 to CY2024: mine plus four RKEF plants, ISO 14064-1:2018 and GHG Protocol, GHG Protocol tool factors. CY2025: adds Huayue Nickel Cobalt at 10% equity (43,618 of the Scope 1 figure), GHG Protocol Corporate Standard 2004, IPCC 2019 factors. Not like-for-like, and not disclosed as restated | |
| Scope 2 (location) | 1,814,177 | 3,440,250 | 3,710,248 | 3,763,183 | As above | As above; CY2025 includes 19,356 for the investee. Implied grid factor 0.864 (CY2022), 0.691 (CY2024), 0.860 (CY2025) | |
| Scope 2 (market) | Not disclosed | Not disclosed | Not disclosed | Not disclosed | All periods | No contractual instruments reported in any period | |
| Scope 3 by category | Not disclosed | Not disclosed | Not disclosed | Not disclosed | All periods; GRI disclosure 305-3 indexed from CY2024 with no figure | Paragraph C4(b) relief applies to CY2025 only; the earlier omissions were voluntary | |
| Total | 3,584,263 | 6,633,819 | 6,644,501 | 7,862,123 | CY2024 report folio 39 for the first three (printed "6.644.501" for CY2024); derived from the four CY2025 rows | Up 119.3% across the series. The CY2025 performance highlights state 7,849,014 for the same quantity | |
| Intensity metric | 63.93 (also stated as 64) | 65 | 65 | 72 | CY2022 report folio 43; CY2024 report folio 39; CY2025 report folio 5 | Reproduces as equity emissions over equity nickel in every year. CY2025 includes the less intensive HPAL operation for the first time; on the CY2022 to CY2024 boundary it derives to 78.01 | |
| Energy total (GJ) | 32,875,172 | 59,345,846 | 57,621,456 | 54,044,036 | CY2024 report folio 40; CY2025 report folio 76 (printed "57.621.456" for CY2024) | CY2025 table is expressly labelled equity-based; the earlier table is not labelled. Fuel taxonomy re-cut in CY2025 (anthracite, sub-bituminous and coking oven gas appear; diesel and acetylene drop out) | |
| Energy intensity (GJ/tNi) | 469.12 | 462.70 | 452.78 | 498.59 | As above | Denominator basis changed: CY2024 uses 100% production (57,621,456 / 127,263), CY2025 uses equity nickel (54,044,036 / 108,393). On the CY2024 convention the CY2025 figure would be about 432.5, a fall of 4.5% rather than the 10.1% rise as published | |
| Nickel production (t Ni eq, 100%) | 70,079 | 128,259 | 127,263 | 124,966 | CY2024 report folio 40; CY2025 Annual Report Review of Operations for CY2025 | The CY2025 figure is RKEF production from the audited annual report; the sustainability suite no longer publishes it | |
| Renewable electricity % | Not disclosed | Not disclosed | Not disclosed | Not disclosed | All periods | Site-level only: solar at about 20% of one mine's electricity from CY2022 onward | |
| Offset / certificate volume | Nil | Nil | Nil | Nil | All periods | Stated expressly in CY2025 | |
| Emissions intensity per revenue | Not disclosed | Not disclosed | Disclosed (tCO₂e per US$) | Not disclosed | CY2024 report folio 3 highlights | Published once and dropped |
P.2 Silent restatement & baseline-rebasing log (YOY-04)
| # | Figure / baseline | As stated in report of the period | As restated in a later report | Disclosed & like-for-like? | Effect on an on-track / pay / financing claim | Label (concern / acceptable / cannot-verify) |
|---|---|---|---|---|---|---|
| P2-01 | Calculation standard | CY2024: "in accordance with ISO 14064-1:2018 and the Greenhouse Gas Protocol Standard" | CY2025: GHG Protocol Corporate Standard (2004) alone | No: the change is not disclosed as a change, and no comparability note is given | The target's 2022 base year sits on the superseded basis, so the 50% arithmetic is not like-for-like | Concern |
| P2-02 | Emission-factor source | CY2024: energy conversion factors "from the GHG Protocol tool for stationary combustion, Version 4.1 of the World Resources Institute (2015)" | CY2025: "the 2019 Refinement to the 2006 IPCC Guidelines for National Greenhouse Gas Inventories" | No: not disclosed as a change. The implied Scope 2 factor moved from 0.691 to 0.860 kgCO₂e per kWh, up 24.4%, and the implied Scope 1 factor per non-electric GJ from 76.6 to 105.7 kg, up 37.9% | Reported Scope 2 was flat while consumption fell 18.9%; reported Scope 1 rose 38.2% on flat energy. Both feed the progress picture the targets are judged on | Concern |
| P2-03 | Inventory boundary | CY2022 to CY2024: "covering operations at Hengjaya Mine and its RKEF facilities: Hengjaya Nickel, Ranger Nickel, Angel Nickel, and Oracle Nickel" | CY2025: adds HPAL via the equity-based approach (Huayue Nickel Cobalt at 10%), 62,974 tCO₂e | No baseline recalculation disclosed. The addition lowers the blended intensity by about 6 points because HPAL is far less intensive | The published intensity of 72 is not on the basis of the 63.93 it is implicitly measured against; on the earlier basis it is 78.01 | Concern |
| P2-04 | Energy-intensity denominator | CY2024: 452.78 GJ per tonne on 100% production of 127,263 tonnes | CY2025: 498.59 GJ per tonne on an equity denominator of about 108,393 tonnes | No: the basis change is not stated. On the CY2024 convention the CY2025 figure would be about 432.5 | The published 10.1% rise in energy intensity is an artefact of the denominator change; on a consistent basis energy intensity fell about 4.5% | Concern, and it runs in the company's own disfavour |
| P2-05 | CY2022 intensity value | CY2022 report: 63.93 tCO₂e per tonne Ni eq | CY2024 report: 64 | Yes: rounding only, and the CY2022 report's footnote explains the 100% production basis used for intensity | None | Acceptable |
| P2-06 | Solar project capacity | CY2024: "a 255 MWp photovoltaic and 80 MWh Battery Energy System Storage (BESS) solar project in Morowali" | CY2025: "262MWp photovoltaic and 80MWh battery energy storage system (BESS)" | Not disclosed as a change, but a project specification may legitimately change before financial close | None: no figure relied on | Acceptable |
| P2-07 | Scope 1 source composition | CY2024: stationary combustion, mobile combustion and a carbon-fraction-in-NPI deduction of -87,166 | CY2025: no decomposition; the deduction category is retained in the method table with no figure | No: the withdrawal is not explained | Gross Scope 1 for CY2025 cannot be recovered, so the year-on-year Scope 1 comparison cannot be made on a gross basis | Cannot-verify |
P.3 Dropped / added disclosure log (YOY-05)
| # | Item (metric / category / target / claim / limitation) | Present in | Absent/added in | Explained? | Label |
|---|---|---|---|---|---|
| P3-01 | Multi-year GHG comparative table (three periods, with a Total Emissions row and a three-year intensity row) | CY2022, CY2023 and CY2024 reports | Dropped in CY2025: one year, four rows, and a single intensity figure with no comparative | No | Concern. The paragraph C3 relief excuses comparatives in the statutory report; it does not explain the withdrawal from the voluntary report that had carried them for three years |
| P3-02 | Scope 1 decomposition (stationary, mobile, product-carbon deduction) | CY2022 to CY2024 reports | Dropped in CY2025 | No | Concern. Drives F-14 and the A4 gap |
| P3-03 | Nickel production volume, the denominator of the target metric | CY2022 to CY2024 reports (70,079 / 128,259 / 127,263) | Dropped from the CY2025 sustainability suite; available only in the audited annual report on a different basis | No | Concern. Drives F-20 |
| P3-04 | Emissions intensity per generated revenue (tCO₂e per US$) | CY2024 report highlights | Dropped in CY2025 | No | Concern, minor: a second intensity denominator that would have shown the movement independently of production |
| P3-05 | Net Zero Roadmap section and the 2050 Decarbonisation Roadmap and Net Zero Pathway charts, including the 37 percentage point HPAL wedge | CY2024 report folios 34 and 35 | Dropped in CY2025: two passing references to "continue development of the Net Zero roadmap" survive | No | Concern, and the most consequential of the five. Drives F-8 and the I2 defeat |
| P3-06 | Land-use deforestation and reforestation emission categories | Added to the CY2025 method table | Absent from the CY2024 taxonomy | No, and their addition sits beside a statement that no new sources were added | Cannot-verify. Feeds D2-06 and F-19 |
| P3-07 | Coking oven gas, anthracite coal and sub-bituminous coal as fuel and source categories | Added in CY2025 | Absent from the CY2024 taxonomy (coking oven gas use began at one plant at the end of CY2024 and extended to two more in Q4 CY2025) | Partly: the operational change is narrated; the inventory-taxonomy change is not | Cannot-verify on the completeness statement; the operational change itself is disclosed |
| P3-08 | AASB S2 transition reliefs, scenario inputs, quantified hazard costs, asset-exposure table | Added in CY2025 | Absent from earlier periods | Yes: the first mandatory year | Acceptable, and the added risk disclosure is credited at §4.1 items 1 and 2 |
P.4 Target-trajectory log (YOY-06 / YOY-08)
| # | Target / claim | Base yr | Target yr | Coverage / scope | Change across periods (weakened / extended / rebased / re-scoped / retired / replaced) | On-track survives series? | Label |
|---|---|---|---|---|---|---|---|
| P4-01 | 50% reduction in carbon intensity | 2022 | 2035 | Scope 1 and 2, portfolio-wide, tCO₂e per tonne of nickel | Wording unchanged across CY2023, CY2024 and CY2025. Support weakened: the quantified pathway was published in CY2024 and withdrawn in CY2025; the largest wedge slipped from 2H 2025 to 2026; the milestone cell has always read "Nil"; and the base year's comparability was broken by an undisclosed method and boundary change. The stated target period is 2025 to 2035 against a 2022 base | No. The metric has moved from 63.93 to 72 across the series, and to 78.01 on the base-year boundary, against an end-point of about 32. No on-track claim is made, and none would survive | Concern: a target weakened in substance while unchanged in wording |
| P4-02 | Net zero emissions by 2050 | 2022 | 2050 | Scope 1 and 2, portfolio-wide, absolute | Wording unchanged. Labelled "Absolute quantitative target" and "Net target" in the same table in CY2025. Milestones "Nil" and monitoring metrics "Nil" in every period. Credits described as "limited and supportive" with no bound | No. Absolute Scope 1 and 2 have risen 119.3% since the base year. Most of that is capacity growth, which is why the near-term target is an intensity, but no milestone or monitoring metric exists against which to judge the absolute path | Concern |
| P4-03 | Intensity reductions "expected to materialise from 2025 onward" | Not applicable | 2025 | The group's emissions intensity | Stated in the CY2024 report; the reviewed period is the year it was expected to begin. Intensity rose from 65 to 72 in CY2025, and the statement is not revisited | No: the prior period's forward statement is testable now and was not met | Concern: a testable forward statement, unmet and unaddressed |
| P4-04 | ENC HPAL commissioning, carrying 37 of the 50 percentage points | Not applicable | "second half of 2025" (CY2024 report), then "2026" (CY2025 report) | The 2035 intensity target's largest single dependency | Deferred by about a year, with no restatement of the pathway, no quantification of the effect on the 2035 end-point and no fallback | Not applicable: no on-track claim is made for it | Concern: a point-in-time target is blind to a deferral, and the deferral is unquantified |
| P4-05 | Third-party validation of either target | Not applicable | Not applicable | Both targets | Consistently disclosed as not validated across periods, and stated expressly in CY2025 ("The target and methodology have not been validated by a third party"; "Not validated") | Not applicable | Acceptable: disclosed, and neither credited nor penalised. No science-based or Paris-aligned label is claimed |
| P4-06 | Carbon credits | Not applicable | Not applicable | Both targets | Not used in any period; "being considered but are not currently being used" in CY2025, against a 2050 target contemplating a "limited and supportive role" | Not applicable | Acceptable on non-use, which is baseline and not credited. The unbounded future role is a concern at F-16 |
P.5 Cross-report-type consistency over time (YOY-07 / DR-02)
| # | Claim / metric | Report types compared | Per-period divergence (after normalisation) | Trend in divergence | Audited-source preference applied (A-01B) | Label |
|---|---|---|---|---|---|---|
| P5-01 | Scope 1 and 2 total | Statutory AASB S2 report versus voluntary Sustainability Report highlights | CY2022 to CY2024: one report type only, no divergence available. CY2025: 7,862,123 against 7,849,014 in the same document | Appears in CY2025, the first year two report types exist | Yes: the director-declared and KPMG-reviewed table is preferred, and the discrepancy is recorded rather than smoothed | Concern |
| P5-02 | Emissions intensity | Statutory report versus voluntary report | CY2025: absent from the statutory report, present in the voluntary one. Earlier periods: voluntary only | Appears in CY2025: the statutory report makes the target and does not carry its metric | Not applicable: the audited source does not carry the figure | Concern |
| P5-03 | Nickel production volume | Audited Review of Operations versus voluntary Sustainability Report | CY2022 to CY2024: published in both, on a 100% basis. CY2025: audited annual report only | Widens in CY2025: the sustainability suite drops the figure the target metric depends on | Yes: the audited 124,966 tonnes is used for the derivation at E-37 | Concern |
| P5-04 | Committee meeting cadence | Audited Directors' Report versus the AASB S2 report in the same annual report | CY2025: two meetings held against "reviewed quarterly" | Appears in CY2025 | Yes: the audited Directors' Report governs, and the AASB S2 statement is recorded as not accurate as printed | Concern |
| P5-05 | Climate in the financial statements | Audited financial statements versus the AASB S2 report's connectivity claim | CY2025: no reference to climate in the statements against an asserted cohesive view | Appears in CY2025, the first year connectivity is asserted | Yes: the audited statements govern | Concern |
| P5-06 | Emissions figures across report types | Sustainability Report versus Annual Report, CY2022 to CY2024 | No divergence: the annual reports of those periods carried no emissions figures | No divergence to trend | Not applicable | Acceptable |
*Prepared under the Climate Disclosure Review Rules v15.23 (controlled AI-assisted review). The body (§1–§7) states the verdict and may be issued on its own; the annexes are the working layer. General information only: not legal, financial or investment advice, an audit, an assurance opinion, or a NoCO2 certification or conformance determination. © Carbon Reduction Institute Pty Ltd, ABN 26 122 969 233.*
Each audience score is built from a fixed set of load-bearing criteria, marked before the score is set. "Partial" means the criterion is satisfied only with reader effort that this audience can reasonably spend, not a soft failure. The count matters as well as the score: a score can reach its floor on two failed criteria, so two reports sharing a score may sit some distance apart on the detail below.
| # | Audience | Criterion | Verdict | Why |
|---|---|---|---|---|
| A1 | Carbon accounting | No material category excluded | Not met | Scope 3 is not disclosed at all, so a carbon accountant cannot lift the footprint or confirm that nothing material is excluded, and the OUT-STK-13 rebuttal (a bounding estimate per category or a full category breakdown) is not made. Processing of sold products, the likely dominant category for a nickel pig iron producer, is absent. Sources "considered immaterial" are neither named nor bounded, and the 44% pre-operational project is outside the inventory with no forward estimate. Conformance note: the paragraph C4(b) relief is lawful and expressly declared, and is not the basis of this verdict. A1 measures usability, never permission; the compliance track is at G1, which is assessed separately |
| A2 | Carbon accounting | Single reconcilable footprint | Not met | Two totals for the same footprint in one document: 7,849,014 tCO₂e in the performance highlights against four rows summing to 7,862,123, a 13,109 tCO₂e difference that no combination of the disclosed rows reproduces and that nothing in the suite reconciles. Independently, the table header states the unit as "million metric tonnes of CO2-e" over figures in tonnes. A reader lifting the figure must choose between two published totals with no basis for choosing |
| A3 | Carbon accounting | Method, boundary and version transparency | Not met | Three changes against the prior published inventory, none disclosed as a restatement and none accompanied by a comparability note: the calculation standard (ISO 14064-1:2018 plus GHG Protocol, to the GHG Protocol Corporate Standard 2004), the emission-factor source (GHG Protocol stationary-combustion tool v4.1, to the 2019 Refinement of the 2006 IPCC Guidelines, with the implied Scope 2 factor moving 24.4%), and the boundary (Huayue Nickel Cobalt added at equity share). The equity-versus-100% basis of the "consolidated entities" rows is not stated, nor is the intensity denominator. New source categories appear beside a statement that no new sources were added |
| A4 | Carbon accounting | Granularity and assurance sufficient to lift | partial (counts as a gap) | Action a reader can take: reconstruct aggregate Scope 1 from the fuel table at folio 76 of the 2025 Sustainability Report (fuel by type in native units) and the IPCC 2019 factor family named in the method table, which reproduces the reported figure to about 2%, and take the per-tonne intensity of 72 for a product-level allocation. Why it still counts as a gap: the reconstruction cannot recover gross Scope 1, because the product-carbon deduction is retained in the method table and no longer sized; there is no split by source, entity, site or gas; there is no market-based Scope 2; and the assured scope is the four rows as presented. A supply-chain accountant can approximate the total and cannot lift it by source |
| I1 | Institutional investors | Physical risk relevant and transparent (N-04) | Pass | Each hazard is priced as a single-year cost at 2030, 2040 and 2050, with a status and named mitigations; the cumulative rows sum correctly; the assets exposed are tabulated by carrying value and share of total assets (US$1,484m and 35% for property, plant and equipment); three IPCC SSP scenarios are named with their assumptions; and the realised March 2025 event is costed at about US$5.8 million with the outage stated. Two hazards are expressly unquantified with reasons, and the estimates are unassured, which qualifies the positive without defeating the criterion. Scope stated: relevance to the business model and methodology transparency, not the quality of the modelling |
| I2 | Institutional investors | Transition risk: derivable target headroom | Not met | Headroom is not derivable. The near-term target is intensity-only with no absolute cap and no interim milestone ("Nil"); the 2050 target has no monitoring metric ("Nil") and is labelled both absolute and net; no baseline value is published in the reviewed suite; the quantified pathway published a year earlier, in which one project carried 37 of the 50 percentage points, is absent; and that project has slipped from 2H 2025 to 2026 with no restatement and no fallback. The dominant Scope 1 sources have no disclosed pathway, and the mitigations named against a US$283 million a year exposure are three investigations and a research concept |
| I3 | Institutional investors | Target achievement: real reductions, honest progress | Not met | No progress is stated against either target. On the company's own published series the intensity has risen from 63.93 to 72 tCO₂e per tonne of nickel since the base year, and to a derived 78.0 on the base-year boundary, while absolute Scope 1 and 2 have risen 119.3%. The year's 18.3% increase in reported emissions came with non-electric energy flat and purchased electricity down 18.9%, so the reader cannot tell what was emitted from what was recounted, and the company does not attempt the split |
| I4 | Institutional investors | Portfolio / financed-emissions completeness | Pass | Not a financial institution: there is no lending, investment or underwriting portfolio, no financed or facilitated emissions obligation and no portfolio-emissions claim, so there is no portfolio whose completeness could fail. Not defeated, and not credited. The exposure that does exist is the group's equity interests in the two HPAL projects, which is the look-through question and is scored at I5, so it is counted once |
| I5 | Institutional investors | Flow-through / look-through exposure | Not met | The largest single investment, 44% of the Excelsior Nickel Cobalt project for US$1,012.0 million, sits outside every reported figure and both targets, with no design-capacity emissions or intensity estimate at any stage, while being the disclosed mechanism for 37 of the 50 percentage points of the 2035 target. Equity accounted investees are 29% of total assets. The exposure is raised and disclosed as a holding and is never quantified as emissions; no figure is manufactured here and the magnitude stays cannot-verify |
| I6 | Institutional investors | Reconstructability by a sophisticated reader | partial (workable, not counted) | Action a reader can take: take the base-year intensity of 63.93 from the CY2022 Sustainability Report (folio 43), the 64 / 65 / 65 series from the CY2024 report (folio 39), the CY2025 figure of 72 from the CY2025 report (folio 5), and nickel production of 124,966 tonnes and the HNC output of 85,031 tonnes from the audited Review of Operations, then apply the disclosed 80% and 10% equity shares. Data used: all of it is published by the company in documents an institutional reader holds. The reconstruction reproduces the published metric in all four years to two decimal places in the base year, which is what makes it workable rather than speculative. It takes four documents and three periods, which is effort a reader of this sophistication can spend. Not counted, so the same absence is not stacked on top of the I3 defeat it already drives |
| R1 | Retail investors | Headline matches evidence without cross-document work | Not met | Reading the statutory report alone, the 50%-by-2035 and net-zero-by-2050 commitments cannot be matched to any evidence: no baseline value, no current value, no movement, no pathway. The current figure is in the voluntary report and the baseline is in a report published three or four years earlier, so matching the headline to evidence requires assembling three documents. Under the caveat ladder there is no co-located correction to read the claim down against |
| R2 | Retail investors | Targets cover material sources; achievement honest | Not met | Both targets cover Scope 1 and Scope 2 only, and Scope 3 is not disclosed at all, so the processing of the company's own product, its purchased coal and its upstream fuel and energy sit outside every commitment. Achievement is not stated for either target, and on the company's own figures both metrics have moved away from them |
| R3 | Retail investors | Material risks legible | Pass | The risk tables are unusually legible for a non-specialist: each risk carries a time horizon, a status of "Increasing", a plain-language potential impact and named mitigations, and the cumulative table gives dollar figures by decade. The realised event of the year is described in plain terms with its cost. Two limitations are noted without defeating the criterion: the quantified exposures are given no earnings denominator, and the scenario table is internally inconsistent (a best estimate of 2.4 °C against a "very likely range" of 3.3 to 4.5+) |
| R4 | Retail investors | Caveats findable, understandable, fairly presented | partial (counts as a gap) | Action a reader can take: read the two target tables at folios 62 to 64, where the transition reliefs, the "Nil" milestone and monitoring cells, the non-validation and the credit role are all present and findable. Why it still counts as a gap: the two most consequential cells read "Nil" against "Milestones and interim targets" and "Metrics for monitoring progress", which a non-specialist would not recognise as meaning there is no way to track either commitment; the 2050 target is labelled "Absolute quantitative target" and "Net target" two rows apart with no reconciliation and no bound on credits; and the gas-coverage rows describe sources that are not the company's. The caveats are present and are not fairly presented as the limitations they are |
| P1 | Consumers & public | Claims literally true within their implied boundary | Not met | The statutory report states that the net-zero target "is reviewed quarterly by the Risk Management and Sustainability Committee". The same annual report states that the committee's charter requires at least four meetings a year, that "in 2025 there were only two formal meetings held", and records in the audited Directors' Report two meetings held and two attended. The statement is not accurate as printed, it concerns the governance that makes the target credible, and the contradiction sits inside one director-declared document. A second instance, the connectivity claim against financial statements containing no reference to climate, is recorded at G2 rather than counted here |
| P2 | Consumers & public | No greenwashing or misleading composite impression | Not met | A reader of the CY2025 suite meets a restated commitment to halve carbon intensity, a Chairman's account of "tangible progress" on emissions, a project described in the audited annual report as a "global showcase for sustainable, high quality, low carbon nickel production", and a single intensity figure of 72 with nothing to compare it to. On the company's own prior disclosures that intensity has risen about 13% above its baseline and absolute emissions have grown 119%, and the pathway that showed how the target would be met has been removed from the suite in the same year. The composite impression available to a reader is of a company reducing its carbon intensity. Recorded as a misleading-impression risk, not as an allegation |
| P3 | Consumers & public | Genuine climate action evidenced | Pass | Action is visible, executed and evidenced in the numbers: the electric haul-truck fleet went from 8 to 37 units, 20 electric loaders and 4 excavators replaced diesel units at the plants, biodiesel energy fell 7.3%, solar supplies about 20% of one mine site's electricity, coking oven gas replaced coal at three plants during and before the period, purchased electricity fell 18.9%, and no carbon credits are used. The growth in absolute emissions and the adverse intensity movement are counted at P2 and I3 and are not stacked again here |
| G1 | Regulators | Standards compliance / readiness | Not met | AASB S2 paragraph 35 requires information about performance against each climate-related target and an analysis of trends or changes in performance. None is given for either target, no transition relief reaches paragraph 35 (C3 addresses comparatives, C4 addresses the measurement method and Scope 3), and the target disclosures sit outside the assured scope, so no assurance comfort attaches. Contributing context, not the basis: the section 296D Directors' Declaration was omitted from the release of 23 February 2026 and supplied by re-issuance on 10 March 2026, requiring a superseding auditor's report and an Emphasis of Matter; and the quantified 2030 to 2050 financial effects are published with no disclosed basis. Conformance note: the paragraph C3 and C4(b) elections are lawful, expressly declared and are NOT the basis of this verdict |
| G2 | Regulators | Cross-source / audience consistency | Not met | Six divergences survive boundary and period normalisation: two totals for one footprint in one document; the target's own metric published only in the voluntary report and its baseline in neither reviewed-period document; a quarterly review asserted against a meetings table in the same annual report showing two; a connectivity claim to financial statements that contain no reference to climate; the nickel production volume disclosed in the audited annual report and withdrawn from the sustainability suite where it is the target metric's denominator; and a completeness statement that the adjacent method table cannot be squared with |