Improved to not decision-useful for retail investors and the public, because Scope 3 is now published by category, while a 12% reduction is reported in a year gross emissions rose

Reporting periodFY2026
Review date1 September 2026
ProtocolClimate Disclosure Review Rules v15.23
SectorTransport, Postal and Warehousing
9 / 15overall score · sum of the five audience ratings, for ranking
This review tests Qantas's publicly available climate disclosure against CRI's Climate Disclosure Review Rules, which use the CRI Net Zero Standard as the reference for a credible claim together with AASB S2 Climate-related Disclosures. It reflects the information available at the review date, states what the evidence supports, what it does not, and what would resolve each open point, and says "cannot verify", not "no issue", where evidence is missing. It is general information, not legal, financial or investment advice, and not an audit or an assurance engagement. It does not allege illegality, misconduct, greenwashing or dishonesty. Organisations may contact CRI at robc@noco2.com.au to identify an error, provide relevant public information or request review of updated disclosures. See Important information at the end of this report.

Decision-usefulness at a glance

CompanyCarbon / supply-chain accountingInstitutional investorsConsumer / retail investorsConsumers & publicRegulators
Qantas Airways Limited (ASX: QAN)
32112

How to read this report

How to read the ratings

Each audience gets its own rating.

The same disclosure can be reliable for one reader and misleading for another, so we rate decision-usefulness separately for each audience on the three-point scale below. There is no single pass/fail verdict — decision-usefulness is a judgement about each audience, not the report as a whole.

1
Not decision-usefulCannot be relied on in its current form for this reader's decision.
2
Mostly decision usefulUsable, with one material limitation the reader must work around.
3
Decision-usefulCan be relied on. A deliberately high bar.

The bar below adds the five audience ratings into an overall score out of 15. It is used only to rank reports against one another — it carries no band and no verdict label. Its colour simply reflects the mix of the five ratings: the more red, the more audiences the disclosure falls short for.

9 / 15
overall score · for ranking only

Each audience gets its own rating because the same disclosure serves them differently. A rating of 3 means the disclosure answers that reader's core question; 2 means it answers it with effort or with gaps that reader can work around; 1 means it does not.

The rating is not a verdict on the company's climate performance. It is a verdict on whether a reader of this disclosure can work out what is happening.


Two conventions apply throughout. A certification (including the Australian Government's Climate Active program) is treated as a claim to be tested, not as a strength in itself. Detailed disclosure and candour about a company's own gaps are the baseline expected of a credible discloser, not a credit.

1. Scope & basis

1.1 What we reviewed

DocumentReviewed?If missing, effect on this review
Qantas Group Sustainability Report 2026, containing the Climate Statements 2026 prepared under AASB S2, the Notes to the Climate Statements, the Directors' Declaration and the KPMG assurance reportYesPrimary source: this is the statutory sustainability report for the period
Qantas Annual Report 2026 (audited financial report, Directors' Report, Remuneration Report, auditor's opinion)YesPrimary audited source for the financial statements and the executive scorecard
Qantas Annual Reports FY2020–FY2025YesPrior-period context for the trajectory
Qantas Group Sustainability Reports FY2022–FY2025YesSource of the FY19–FY24 series and of the metrics the current report no longer carries
Sustainability Report Appendix FY25 (.xlsx)YesPrior-period content index and glossary
Climate Active Public Disclosure Statements FY2019-20 to FY2023-24YesThe historical customer offsetting certifications
Sustainability Report Appendix FY26Not providedNo effect identified: the FY26 climate content appears complete within the Climate Statements
Carbon credit registers for FY26 (volume, scheme, type, vintage, serial)Not providedCaps verification of the abatement line that produces the headline result; see §4.3
LGC procurement and retirement records for FY26Not providedCaps verification of the renewable-electricity claim; see §4.3
NGER register FY2024-25 (Clean Energy Regulator)YesStatutory anchor for the FY25 comparative; the FY2025-26 register is not published until February 2027

Documents covering periods after FY2026 were not used, and none was available at the review date. The multi-period series in §3.4 runs from FY19 up to and ending at FY26.

1.2 Standards the company is held to or references

Standard / frameworkReferenced by company?How stronglySector module(s) applied
Corporations Act / Ch 2MYesBinding: prepared in accordance with, for both the financial report and the sustainability reportNot applicable
AASB S2YesIn accordance with: first mandatory year. Climate Statements prepared in accordance with AASB S2; Directors' Declaration given under s296A(6)Aviation
ASIC RG 280No: not referencedNot referencedNot applicable
GHG Protocol (Corporate / Scope 2 / Scope 3)Yes: the Corporate Standard and the Corporate Value Chain categoriesIn accordance with: Scope 3 measured in accordance with the Corporate Standard and presented on the Corporate Value Chain categories; Scope 1 and 2 on NGER, CORSIA and NGA factorsAviation
PCAF (financed emissions)NoNot applicable: not a financial institutionNot applicable
SBTiNoNot referenced: no validated target; the pathway and targets "have not been validated by an external third party"Not applicable
Climate Active / other carbon-neutral frameworkNoNot referenced: no carbon-neutral claim and no reference to the program appears in the FY26 suiteAviation
Certificates (GreenPower / LGC / ACCU / REC)YesWith reference to: LGCs acquired and retired against Australian buildings; ACCUs surrendered for Safeguard Mechanism compliance; CORSIA-eligible units for international complianceAviation
ASSA 5010 (assurance)YesBinding: KPMG audit opinion over Scope 1 and Scope 2; review conclusion over governance, strategy and Scope 3Aviation
Compliance schemes: NGER, Safeguard Mechanism, CORSIAYesBinding: compliance obligations described as metAviation
Other (company-referenced)Yes: ICAO long-term aspirational goal, IATA Fly Net Zero, Australian Government Aviation White Paper, ISCC and RSB (for SAF)MentionedAviation

1.3 Review basis & limitations

This is a standard review of the FY26 disclosure. FY26 is Qantas's first mandatory reporting year under AASB S2, so the anchor document is the Climate Statements 2026, which carry a Directors' Declaration and sit inside the Sustainability Report, with the Annual Report as the audited financial source. Because eight reporting periods are available, the review also tracks the position across periods rather than reading FY26 alone.

Three limitations bound the conclusions. First, the report discloses no carbon credit volumes for the year and does not split the single abatement line that produces its headline result, so the composition of that line is derived rather than read. Second, no certificate records were provided, so the renewable-electricity claim is tested against what the notes say rather than against retirement evidence. Third, the statutory emissions register for FY2025-26 is not published until February 2027, so this year's figures cannot yet be reconciled to the regulator. Where these bite, the review records "cannot verify" rather than inferring a fault.

2. Verdict

2.1 Decision-usefulness by audience

3Carbon / supply-chain emissions accounting3 met · 1 partial · 0 not met
The inventory is now usable. Scope 3 is broken out by category for the first time, at 7,572.6 ktCO₂-e across four named categories plus a bounded residual, with categories 10 to 14 assessed out and reasons given. Scope 2 carries both a location-based and a market-based figure. Scope 1 and Scope 2 hold a reasonable-assurance audit opinion and Scope 3 a limited-assurance review. Every internal identity reconciles and the prior year ties to the statutory register exactly. The open item is where emissions from partner-operated flights sold under a Qantas code sit, which the report does not say.§3.1, §4.2
2Institutional investors2 met · 3 partial · 1 not met
Everything needed to price the target is now in one table, and the answer it gives is not the one the headline gives. Gross Scope 1 and 2 emissions are 3.8% above the 2019 baseline the 25% target is measured from, and rose 6.3% in the year. The reported 12% reduction is produced entirely by a 1,952.7 ktCO₂-e abatement line, which the company recognises when a credit is acquired and, where credits have not been acquired, on an estimate of what it will owe.§3.3, §3.4, §4.2, §5
1Consumer / retail investors2 met · 1 partial · 1 not met
The headline is that emissions fell 12%. Qantas's emissions rose. Gross Scope 1 and 2 reached 12,971.4 ktCO₂-e, the highest on record and above the 2019 baseline, and the total footprint reached 20,544.0 ktCO₂-e. Both figures are printed, in the same table as the 12%, but the report never puts them together and the arithmetic that reconciles them is left to the reader.§3.3, §4.2
1Consumers & public1 met · 1 partial · 1 not met
The company remains unusually direct that buying carbon credits "is not the same as preventing emissions from aviation in the first place". Assembled, though, the suite reads as a year of falling emissions: a 12% reduction in the Annual Report and the Sustainability Report, a Remuneration Report recording that emission reduction targets were exceeded, and the per-kilometre efficiency measure carried in every prior year now absent. Emissions rose in the year and are above where they were in 2019.§4.2, §5
2Regulators1 met · 0 partial · 1 not met
The first mandatory year is delivered properly: Climate Statements under AASB S2, a Directors' Declaration, and assurance at exactly the level the phase-in requires, with unmodified conclusions. Both gaps flagged for this year, Scope 2 dual reporting and Scope 3 category disaggregation, are closed. The problem is internal consistency: four places in the same suite say something the rest of the suite contradicts.§2.3, §5.3

What the company should fix first: publish the abatement line's composition, showing separately the tonnes from SAF, the credits retired by scheme, the credits acquired but not retired, and the tonnes accrued against credits not yet acquired, so a reader can see what the 12% is made of.

2.2 Scorecard

Headline claim ↔ evidence match
Disclosure quality9 / 15
Inventory completeness (Scope 1/2/3)
Financed-emissions completeness (if FI)N/A
Target credibility
Real reduction vs accounting movement
Offset / certificate / renewable integrity
Assurance coverage vs claim
Standards / compliance confidence
Comparability (like-for-like only)
Reader accessibility
Evidence limitations
DimensionRatingJustification
Headline claim ↔ evidence match1/5The reported 12% reduction runs opposite to the direction of the company's own gross emissions, which rose 6.3% in the year and sit above the 2019 baseline
Disclosure quality9 / 15 overallComprehensive, well-structured and explicit about its own judgements and uncertainties; the accounting basis for the contested figure is disclosed rather than hidden
Inventory completeness (Scope 1/2/3)4/5All fifteen categories addressed, four itemised, C4–C9 bounded, C10–C14 reasoned out, both Scope 2 bases published; codeshare unresolved
Financed-emissions completeness (if FI)N/ANot a financial institution
Target credibility2/5Net target on which credits do the work; 36.9% of the footprint outside every interim target; no quantified milestone between 2030 and 2050
Real reduction vs accounting movement1/5Gross emissions at a record and above baseline; the entire reported reduction is the abatement line, of which carbon credits are the large majority
Offset / certificate / renewable integrity3/5Genuine improvement in credit type, with a formal integrity framework, against undisclosed volumes and an accrual basis that counts unpurchased credits
Assurance coverage vs claim3/5Reasonable assurance over Scope 1 and 2 and limited over Scope 3, matching the mandated phase-in; the abatement line that carries the headline is outside the audited figures
Standards / compliance confidence4/5First mandatory year delivered with a Directors' Declaration and unmodified assurance conclusions
Comparability (like-for-like only)3/5Prior-year figures unrestated and the Scope 3 comparative disaggregated; the Scope 2 boundary widened within an unchanged series
Reader accessibility3/5Clear and navigable, but the reader must do the report's arithmetic to see the direction of travel
Evidence limitations2/5Credit volumes, the abatement split and LGC records are all unavailable

2.3 Standards & compliance snapshot

AreaRatingBasis
Corporations Act / Ch 2MNo apparent issueFinancial report issued with an unmodified audit opinion; sustainability report prepared under Ch 2M with a Directors' Declaration under s296A(6) dated 27 August 2026
AASB S2Appears broadly compliant: minor limitationsFirst mandatory year. Governance, strategy, risk management, metrics and targets all addressed; scenario analysis across three scenarios and three horizons; the permitted exemptions for commercially sensitive and not separately identifiable information are used and their use is disclosed
ASIC RG 280Not assessedNot assessed in this review; the company does not reference it (see section 1.2)
GHG Protocol / Scope 2 / Scope 3Appears broadly compliant: minor limitationsDual-basis Scope 2 now reported; Scope 3 presented on the Corporate Value Chain categories with method and factors per category. Recognising abatement on acquisition, and on estimate where credits are not yet acquired, departs from the convention that a credit counts when it is retired
PCAF / financed emissionsNot applicable for the periodNot a financial institution
Carbon-neutral / net-zero frameworkNot applicable for the periodNo carbon-neutral claim is made in the FY26 suite and the Climate Active program is not referenced
Certificates / creditsCannot verify: material evidence missingNo credit volumes, no LGC volumes and no retirement records for the year
Other company-referenced frameworkNo apparent issueNGER, Safeguard Mechanism and CORSIA obligations described as met; the prior year reconciles to the statutory register
Assurance (ASSA 5010)No apparent issueAudit opinion over Scope 1 and Scope 2 on both bases; review conclusion over governance, strategy and Scope 3. Both unmodified, and both at the level the phase-in requires for this year

3. What this means for a reader

3.1 What is counted / not counted

Reporting basis: Qantas Group, operational control, year ended 30 June 2026. Domestic emissions on NGER Measurement Determination factors; international on the CORSIA factor for carbon dioxide with Australian National Greenhouse Accounts factors for methane, nitrous oxide and hydrofluorocarbons. The figures below sum to a total footprint of 20,544.0 ktCO₂-e. All figures are the reviewed year.

The two Scope 2 rows are two measurements of the same electricity and are not added. The location-based figure is the one the target, the pathway and the total are built on; the market-based figure is shown as an alternative measure of the same consumption.

Emissions composition
Values as reported (tCO₂e). Bars are independent magnitudes, not a stack. Scope 2 is shown on both bases: they measure the same electricity two ways and are alternatives, not additions, so they are never added together.
Source: Sustainability Report 2026, Climate Statements, p.27 (Scope 1 and Scope 2, both bases) and p.28 (Scope 3); all figures FY2026, location-based and market-based Scope 2 are two measures of the same electricity
Scope 112,916,400
Scope 2 location-based55,000
Scope 2 market-basedthe same electricity on the other basis, not an addition900
Scope 37,572,600
Scope 3 by category (largest first)
Source: Sustainability Report 2026, Climate Statements p.28, Scope 3 by GHG Protocol category, FY2026
C3 Fuel- & energy-related activities3,382,100
C1 Purchased goods & services2,634,900
C2 Capital goods1,070,200
C15 Investments276,800
C4-C9 Other (aggregated)208,600
What is counted
Every scope and Scope 3 category, coloured by inclusion status. Values as reported. A tile shown in brackets is counted but not additive: it either sits inside another line's total, or it is the same emissions measured on the other Scope 2 basis. The values shown do not add up to the reported total.
Source: Sustainability Report 2026, Climate Statements pp.27-28 and Notes to the Climate Statements pp.40-42
Scope 1: aviation fuel, ground fuel, fugitives12,916.4Reported
Scope 2: electricity (location-based)55.0Reported
Scope 2: electricity (market-based)(0.9)Same electricity, market-based measure
Scope 3 C1 Purchased goods & services2,634.9Reported
Scope 3 C2 Capital goods1,070.2Reported
Scope 3 C3 Fuel- & energy-related3,382.1Reported
Scope 3 C4–C9 (upstream transport, waste, business travel, commuting, upstream leased assets, downstream transport)208.6Reported
Scope 3 C10 Processing of sold productsNot relevant
Scope 3 C11 Use of sold productsNot relevant
Scope 3 C12 End-of-life of sold productsNot relevant
Scope 3 C13 Downstream leased assetsNot relevant
Scope 3 C14 FranchisesNot relevant
Scope 3 C15 Investments276.8Reported
Partner-operated flights sold under a Qantas codeExcluded
Reported / counted Counted, but not additive: inside another line, or the same emissions on the other Scope 2 basis Not counted (excluded or unquantified) Not relevant or not applicable
Scope / categoryStatusQuantified (ktCO₂e)Material?Note
Scope 1: aviation fuel, ground fuel, fugitivesReported12,916.4Yes62.9% of the footprint; over 99% aviation fuel. Domestic 4,742.0, international 8,174.4. Reasonable assurance
Scope 2: electricity (location-based)Reported55.0No: 0.3%Reasonable assurance. Boundary re-assessed in the year to add international lounges and offices
Scope 2: electricity (market-based)Reported0.9Not applicable: alternative measure of the same electricity, not additiveFirst year published. Reasonable assurance. Residual relates to international sites; Australian buildings are matched by LGCs
Scope 3 C1 Purchased goods & servicesReported2,634.9Yes34.8% of Scope 3. Spend-based, EXIOBASE factors adjusted for inflation and currency
Scope 3 C2 Capital goodsReported1,070.2YesAircraft entering service and parts; up 27% on new fleet investment
Scope 3 C3 Fuel- & energy-relatedReported3,382.1Yes44.7% of Scope 3 and the largest single category; well-to-tank of aviation fuel
Scope 3 C4–C9 (upstream transport, waste, business travel, commuting, upstream leased assets, downstream transport)Reported: aggregated208.6NoDisclosed as one line and bounded at under 3% of Scope 3; method disclosed for each category individually
Scope 3 C10 Processing of sold productsNot relevantNot applicableNoReasonable for a passenger and freight airline
Scope 3 C11 Use of sold productsNot relevantNot applicableNoReasonable: the transport service is consumed on delivery and its combustion sits in Scope 1
Scope 3 C12 End-of-life of sold productsNot relevantNot applicableNoOnboard products only
Scope 3 C13 Downstream leased assetsNot relevantNot applicableCannot verifyAssessed out; the assessment is stated but not published
Scope 3 C14 FranchisesNot relevantNot applicableCannot verifyAssessed out; the assessment is stated but not published
Scope 3 C15 InvestmentsReported276.8YesJetstar Japan and, to 31 July 2025, Jetstar Asia; down 49% on the Jetstar Asia closure. Captures investee Scope 1 only
Partner-operated flights sold under a Qantas codeExcludedNot disclosedCannot verifyExcluded from Scope 1 on an operational-control basis; the report does not say whether they sit in any Scope 3 category. See §4.2

3.2 Financed-emissions detail (financial institutions)

N/A: not a financial institution. Category 15 covers two airline joint-venture interests, is quantified at 276.8 ktCO₂-e and is dealt with in §3.1 and §4.

3.3 Real reduction vs accounting movement

Scope 1 and Scope 2 are decomposed separately below, and Scope 2 is further split into the part driven by using less electricity and the part driven by the grid getting cleaner. The company frames its target on a combined net Scope 1 and 2 basis; the table shows what sits under that framing.

Reported changeDriverReal-world reduction?
Scope 1: 12,139.4 → 12,916.4 kt, FY25 → FY26 (+6.4%)Activity: new routes and increased flying activity; aviation fuel consumption up 6.2% to 5,092,639 kLIncrease: the company states it plainly
Scope 1: 12,372.7 → 12,916.4 kt, FY19 → FY26 (+4.4%)Activity: growth outrunning efficiency across seven yearsIncrease
Of which: fleet and operational efficiency initiativesReal abatement: more than 40 initiatives delivering 40 kt, itemised down to individual programs (engine overhauls 6.6 kt, operational procedures 6.0 kt, ground power units 3.0 kt, winglets 2.9 kt, airspace management 2.5 kt, flight planning 1.8 kt)Yes: 40 kt of genuine abatement, against a 777 kt increase in gross Scope 1
Of which: SAFReal abatement: 55,214 kL procured, 1.1% of jet fuel, up 5.3× on the prior year at approximately 85% lifecycle reductionYes: in-sector abatement, of the order of 120 to 130 kt
Scope 2 (location-based): 58.1 → 55.0 kt, FY25 → FY26 (−5.3%)Mixed: the company attributes the fall largely to domestic grid decarbonisation, alongside a 2% decline in consumptionPartly: majority grid, which is business-as-usual, not company action
Scope 2 (location-based): 120.9 → 55.0 kt, FY19 → FY26 (−54.5%)Mixed: property rationalisation and grid decarbonisation across seven yearsPartly
Scope 2 (market-based): 0.9 kt against 55.0 kt location-basedCertificates: LGC acquisition and retirement, and a GreenPower contract at Melbourne Airport, remove 54.1 kt, 98.4% of location-based Scope 2No: a contractual instrument, not a change in the electricity drawn
Gross Scope 1+2: 12,197.5 → 12,971.4 kt (+6.3%), and 3.8% above the FY19 baseline of 12,493.6 ktActivity: growth in flyingIncrease: the highest gross figure on record
Reported net Scope 1+2 reduction of 12% against the 2019 baselineMixed: the 1,952.7 kt abatement line, 15.1% of gross emissions. The company does not split it; on the FY25 disclosed SAF abatement ratio the SAF component is of the order of 120 to 130 kt, around 6%, leaving roughly 94% from carbon creditsNo: an accounting movement. The physical position moved the other way
Of which: credits recognised on acquisition rather than retirement, and tonnes accrued against credits not yet acquiredMethod or factor: the company recognises one credit acquired as one tonne abated in the year of acquisition, and "also recognises an estimate of emissions abatement required to meet voluntary commitments and mandatory carbon credit obligations where the associated carbon credits have not yet been acquired". No credits were retired for CORSIA in the yearNo: cannot verify what share, because the split is not published
Total footprint: 19,503.4 → 20,544.0 kt (+5.3%)Activity: growth across Scope 1 and Scope 3 togetherIncrease: an all-time high

Two controls hold on the other side of this. Credits retired for the customer Voluntary Carbon Program were kept out of the Group's own compliance and voluntary positions, apart from a stated Reconciliation Action Plan commitment, so customer money is not counted twice. And all credits retired for Safeguard Mechanism compliance in the year were carbon-removal Australian Carbon Credit Units from nature-based projects, with the remainder drawn from the ACCU Scheme, the Verified Carbon Standard or the Gold Standard.

3.4 Trajectory over time

Across eight years the shape is that Qantas's emissions collapsed through the pandemic, recovered, and have now passed where they started. Gross Scope 1 and 2 went 12.49 Mt in FY19, down to 3.30 Mt in FY21 as flying stopped, and back to 12.97 Mt in FY26, which is above the baseline the 25% target is measured from with four years left to run. The total footprint reached 20.54 Mt, the highest in the series. Against that, the reported net position improved to a 12% reduction, because the abatement line grew faster than gross emissions did; the company describes this as a "moderation in net emissions reduction" and attributes it to flying growth outpacing the scaling of its levers.

Two changes in the disclosure itself are worth a reader's attention. The first is a substantial widening: Scope 3 is broken out by category for the first time, the prior year is disaggregated on the same basis, a market-based Scope 2 figure is published for the first time, an internal carbon price of AUD $60 to $70 per tCO₂-e is disclosed, and anticipated carbon costs for the coming year are quantified at $117 million. The 2019 baseline value, absent from the metrics table since FY22, is printed again. The second is a narrowing: the fuel and emissions intensity series, published every year through FY25 and reaching 84.5 kg CO₂-e per 100 revenue tonne kilometres, does not appear anywhere in the FY26 report. It was the only measure in the suite that showed efficiency separately from volume.

One long-standing commitment is being retired: from FY27 the Group will stop purchasing carbon credits against emissions from ground and duty travel, a commitment made in 2007. The change is disclosed and the review treats it as neutral, neither credit nor fault. The Climate Active program, certified through FY2023-24 and unmentioned in FY25, is again absent, and no carbon-neutral claim is made anywhere in the FY26 suite.

Metrics over time

Trajectory over time
Reported operational emissions by scope, stacked, in tCO₂e per reporting year. Orange dotted line = a change in what is counted or how: the bars either side of it are not like-for-like. Where the later years count sources the earlier ones left out, the earlier years under-state the footprint.
Source: FY19 and FY20-FY22 from Sustainability Report 2022 p.59 and Sustainability Report 2023 p.73 (restated); FY23-FY25 from Sustainability Report 2025 p.127; FY26 from Sustainability Report 2026 pp.27-28. Scope 2 charted location-based only
tCO₂e 0M5M10M15M20M25M FY2019FY2020FY2021FY2022FY2023FY2024FY2025FY2026 FY2023: Scope 3 reporting boundary expanded490,214 to 3,182,594 tCO₂e as categories were added; earlier years not restated
Scope 1
Scope 2 (location-based)
Scope 3
Change in what is counted (not like-for-like)
MetricFY2019FY2022FY2023FY2024FY2025FY2026MovementDriverNote
Scope 1 (ktCO₂e)12,372.74,734.49,720.711,456.412,139.412,916.4Up: above the FY2019 level; +6.4% in FY2026Activity: real movement; efficiency gains outrun by growthUnrestated across the series. FY2019 is the target baseline year
Scope 2 location-based (ktCO₂e)120.964.962.560.358.155.0Down: 54.5%, falling consistentlyMixed: majority grid factor (business-as-usual), minority consumptionBoundary widened in FY26 to add international lounges and offices; comparatives not restated
Scope 2 market-based (ktCO₂e)Not disclosedNot disclosedNot disclosedNot disclosedNot disclosed0.9New: first year publishedNot applicableContractual instrument, not physical. Cannot be compared with any prior year
Scope 3 total (ktCO₂e)1,212.1490.23,182.66,094.27,305.87,572.6Not comparable: boundary break at FY2023; +3.7% in FY2026Boundary or M&A: the FY23 step is boundary expansion, not value-chain growthBy category for the first time in FY26 (five lines, C4–C9 bounded; Categories 10–14 assessed not relevant), with the FY25 comparative disaggregated, not restated
Emissions intensity (kgCO₂e per 100 RTK)92.596.087.987.484.5Not disclosedDropped: series discontinued in FY2026; it was improvingNot applicableIt was the only like-for-like efficiency measure. Dropped from the FY26 report without explanation
Renewable electricity (% of consumption)Not disclosedNot disclosedNot disclosedNot disclosedNot disclosedNot disclosedNot disclosedNot applicableA 100% renewable claim is made for Australian buildings in every year; FY26 adds a market-based Scope 2 figure and a six-month retirement position for one contract
Certificates and offsets retired (tCO₂e)Not disclosedNot disclosedNot disclosed364,000Not disclosedNot disclosedDropped: disclosure withdrawn; FY2025 and FY2026 volumes both undisclosedNot applicableFY2024 is the Group figure from the FY2025 report. Climate Active certified the customer program only, to FY2023-24; no Group total appears in the FY2022 to FY2024 Sustainability Reports. Compliance-driven and growing to FY30
Total footprint (ktCO₂e)13,705.75,289.512,965.717,610.919,503.420,544.0Up: all-time highActivity: growthArithmetic verified each year

Targets and claims over time

Target or claimAs first stated (period)As stated for FY2026ChangeExplained?Note
2030 target: 25% reduction in net Scope 1 and 2 from 2019 levelsSet March 2022: −25% net Scope 1 and 2, FY19 → FY30 (FY2022)Unchanged; a 12% net reduction reported, the first year a net figure is published; gross Scope 1 and 2 3.8% above the baselineUnchangedNot applicableBaseline value restored to the table in FY26. Scope 3 excluded from the interim target throughout (see F-4, F-13)
10% sustainable aviation fuel by 2030"SAF procured equivalent to 10 per cent of jet fuel consumption" (first period not recorded in this review)Same words; the footnote now admits book-and-claim attributes and fuel that may be uplifted by other airlines. 1.084% of jet fuel, from 0.221% (FY23), 0.220% (FY24) and 0.218% (FY25)Re-scoped: target expression "refined" in FY26Partly: the footnote discloses the change; the same page states no revisions were made (see F-10)Flat for three years, then up 5.3×
Net zero emissions by 2050Net zero by 2050, Scope 1, 2 and 3 (announced 2019)UnchangedUnchangedNot applicableNo quantified milestone between 2030 and 2050 (see F-13)
100% renewable energy for Australian buildingsClaimed 100% for Australian buildings (FY2019)Stated as "achieved through the acquisition and retirement of LGCs"UnchangedNot applicableRetirement covers six months of one contract at the reporting date (see F-11)
Carbon-neutral claim and Climate Active certificationClimate Active service certification FY2019-20Absent; no carbon-neutral claim madeWithdrawn: from the label entirelyCannot verifyCertified to FY2023-24, absent FY25. The review treats the exit as neutral, neither credit nor fault
Ground and duty travel carbon credit purchasingCommitment made in 2007Ends from FY27Withdrawn: from FY27Yes: the change is disclosedThe review treats it as neutral, neither credit nor fault

4. Findings

4.1 What stands up (genuine / qualified positives)

▲F-1
SAF procurement rose 5.3 times, from 10,436 kL to 55,214 kL, taking SAF from 0.218% to 1.084% of jet fuel. It rests on committed supply, not intention: an approximately 50 million litre per annum multi-year offtake at Los Angeles, first procurement at Vancouver, and continued volume at London Heathrow
Why it matters This is direct, in-sector abatement in a sector with few options, and it is the one lever that reduces the emissions rather than accounting for them. After three flat years the trajectory changed
Qualification (if any) It is 1.1% against a 10% requirement for 2030, so roughly a further nine-fold increase is needed in four years, and no year-by-year contracted volume is published. Part of the volume is compelled by the UK SAF Mandate. The measure counts environmental attributes where the physical fuel may be uplifted by another airline
▲F-2
Every carbon credit retired for Safeguard Mechanism compliance in FY26 was a carbon-removal Australian Carbon Credit Unit from a nature-based project certified by the Clean Energy Regulator, with all other credits drawn from the ACCU Scheme, the Verified Carbon Standard or the Gold Standard. A formal Carbon Market Integrity Framework, with third-party expert review and a governance forum, is applied before purchase
Why it matters Removal credits are a materially stronger instrument than avoidance credits, and the certified customer program's mix two years earlier was 54% Certified Emission Reductions, an instrument with well-documented vintage and additionality questions
Qualification (if any) Volumes are not published for any scheme, so the shift cannot be weighted. The framework governs what is bought, not how much of the reported abatement has actually been bought
▲F-3
Fleet and operational efficiency is quantified initiative by initiative: more than 40 programs delivering 40 ktCO₂-e, itemised down to engine overhauls at 6.6 kt, inflight procedures at 6.0 kt, ground power units at 3.0 kt, winglet retrofits at 2.9 kt, airspace management at 2.5 kt and flight planning at 1.8 kt
Why it matters Attribution at this granularity lets a reader test what the efficiency program actually delivers, rather than taking a single aggregate on trust
Qualification (if any) The total is 0.3% of Scope 1, and gross Scope 1 rose 777 kt over the same year, so the program does not change the direction of the footprint

4.2 What does not stand up (negatives)

▼F-4
The reported result runs opposite to the physical one. Gross Scope 1 and 2 emissions reached 12,971.4 ktCO₂-e, the highest on record, up 6.3% in the year and 3.8% above the FY19 baseline of 12,493.6 ktCO₂-e against which the 25% reduction target is set. The total footprint reached 20,544.0 ktCO₂-e, also a record. Both the Annual Report and the Sustainability Report lead with a 12% net reduction
Why it matters to a reader The one question the target exists to answer is whether emissions are falling. They are rising, and they are further from the 2030 target now than at the baseline. The gross figure and the baseline are printed in adjacent columns of the same table, but the report never compares them and never states that gross emissions exceed the baseline
What would fix it State the gross position against the baseline beside the net position, in the same sentence the 12% appears in
▼F-5
The 12% is produced by a single 1,952.7 ktCO₂-e abatement line, and abatement is recognised before the credit is retired. The stated basis is that one credit "acquired, and added to the Group's carbon credit inventory, is recognised as one tonne of CO₂-e emissions abated in the year of acquisition", and that the Group "also recognises an estimate of emissions abatement required to meet voluntary commitments and mandatory carbon credit obligations where the associated carbon credits have not yet been acquired". A footnote to the headline table confirms the line includes obligations "that may be acquired or retired in the future", and the report states that no carbon credits were retired for CORSIA in the year
Why it matters to a reader A carbon credit conventionally counts when it is retired, because retirement is what stops it being used again. Counting a tonne as abated when the credit has not been retired, and in part when it has not been bought, means part of the reported reduction is an accrual against a future purchase. The company explains that this aligns the climate disclosure with the provision recognised in the financial statements, which is a coherent reason, but a reader seeing "reduced emissions by 12 per cent" will not read it that way
What would fix it Report the abatement line in three parts: credits retired, credits acquired and not yet retired, and tonnes accrued against credits not yet acquired
▼F-6
No carbon credit volume is disclosed anywhere in the FY26 suite, and the composition of the abatement line is not published. The compliance metrics table names "Eligible carbon credits acquired and retired" as a reported metric for both CORSIA and the Safeguard Mechanism, gives its units, leaves the values blank, and directs the reader to the table that carries only the lumped 1,952.7 kt. The prior year's report disclosed 364,000 credits retired for FY24
Why it matters to a reader The reader cannot see how much of the headline is SAF and how much is credits, nor how many credits exist. On the abatement ratio the company disclosed for the prior year, SAF accounts for of the order of 120 to 130 kt, around 6%, which would leave roughly 94% of the headline resting on carbon markets, but that split is the review's arithmetic and not the company's disclosure
What would fix it Publish the volumes the metrics table already names, by scheme, and split the abatement line between SAF and credits
▼F-7
Compliance-driven abatement counts toward the voluntary 2030 target but is excluded from executive pay. The Group Scorecard's climate measure is confined to "Scope 1 GHG emissions reduction from the procurement of SAF and operational improvement initiatives", excluding carbon credits altogether, and abatement from mandatory SAF procurement is excluded "as it is considered a standard outcome of business operations". The public target counts the credits the scorecard will not
Why it matters to a reader The company applies a business-as-usual test to its own remuneration and the opposite test to the number it publishes. Most of what delivers the headline is a legal obligation Qantas would meet regardless, measured against the company's own stated view of what should count
What would fix it Report target progress with compliance-driven and voluntary abatement shown separately, using the test the scorecard already applies
▼F-8
The audited Remuneration Report records that "reductions in Scope 1 GHG emissions exceeded the target", in a year when gross Scope 1 emissions rose 6.4% to an all-time high of 12,916.4 ktCO₂-e. The scorecard measures the abatement increment delivered, not the level of emissions, but the sentence does not say so
Why it matters to a reader A reader of the Annual Report meets a statement that emission reduction targets were exceeded, and nothing beside it indicates that the emissions themselves went up. It is the second place in the suite where the framing and the direction of travel point opposite ways
What would fix it State the gross Scope 1 movement beside the scorecard outcome
▼F-9
The fuel and emissions intensity series is gone. Qantas published emissions per 100 revenue tonne kilometres in every prior year, reaching 84.5 kg CO₂-e in FY25 from 92.5 kg in FY19, and the FY26 report contains no intensity metric at all and no explanation for its removal
Why it matters to a reader It was the only measure in the suite that separated efficiency from volume, and the only one that showed the fleet and operational program working. Its removal leaves a reader with no like-for-like way to see whether Qantas is flying more efficiently. On available seat kilometres, the measure the Annual Report still publishes, Scope 1 per seat kilometre rose about 2.9% in the year, though that is a passenger measure and Scope 1 includes freight, so it is not like-for-like with the retired series
What would fix it Restore the per-RTK series, or publish revenue tonne kilometres so a reader can compute it
▼F-10
The SAF target's meaning changed while the report states it did not. The report says "the Group has refined how its SAF target is expressed, reflecting a broader range of SAF procurement options", and two sentences later that "no further revisions have been made to the above targets since they were set". The refinement is material: the target now counts SAF "physically delivered into shared fuelling infrastructure at airports used by the Qantas Group (where the physical fuel may be used by Qantas Group or other airlines)" and "may include environmental attributes secured on a book-and-claim basis (where the physical fuel may be delivered to other airports)"
Why it matters to a reader A reader takes "SAF procured equivalent to 10 per cent of jet fuel consumption" to mean Qantas will fly on 10% SAF. As now defined it can be met with certificates for fuel burned by other airlines at airports Qantas does not serve. The change is disclosed in the footnote; the statement that no revisions were made is what makes it hard to find
What would fix it Describe the change as a change, and state what proportion of current SAF is physically uplifted by Qantas aircraft
▼F-11
The renewable-electricity claim is stated as achieved on certificates partly still to be retired. The report says the Group "is committed to sourcing 100 per cent renewable energy for its Australian buildings, which was achieved through the acquisition and retirement of LGCs". The notes disclose that under the Melbourne Airport GreenPower contract "sufficient LGCs have been retired for the first six months of the reporting period and this contractual arrangement will continue to be in place to cover the full reporting period"
Why it matters to a reader "Was achieved" is a statement about a completed year. For that contract, at the reporting date, retirement covers half of it and the remainder rests on the contract performing. No LGC volume is published for any site
What would fix it Publish LGC volumes and retirement dates by site, and describe the position as at the reporting date
▼F-12
Emissions from partner-operated flights sold under a Qantas code are excluded and unlocated. The report states that the Group "excludes any emissions from codeshare arrangements, which aligns with industry peers", in the section setting the organisational boundary, and fuel consumption expressly excludes codeshare partners. Operational control decides what is in Scope 1 and Scope 2; it does not decide Scope 3, where an activity the company buys rather than operates is precisely what belongs. The report does not say whether these flights sit in any Scope 3 category
Why it matters to a reader A customer buying a QF-coded seat on a partner aircraft is buying a Qantas product. The emissions are somewhere or nowhere, and the reader cannot tell which, or how large they are
What would fix it State whether codeshare emissions are in Scope 3 and in which category, and size them
▼F-13
Scope 3, at 7,572.6 ktCO₂-e or 36.9% of the footprint, sits outside the transition plan and outside every interim target, and the pathway carries no quantified milestone between 2030 and 2050. The 2050 net zero target covers all three scopes; nothing between now and then does
Why it matters to a reader More than a third of the footprint has no interim commitment attached to it, and the twenty years after 2030 have no waypoint a reader can hold the company to. The company states that it aims to expand the pathway to Scope 3 over time, which is a statement about the future rather than a commitment for the period
What would fix it Set an interim Scope 3 target or a dated milestone, and publish at least one quantified waypoint between 2030 and 2050

4.3 What cannot be verified

?F-14
The composition of the 1,952.7 ktCO₂-e abatement line: how much is SAF and how much is carbon credits
Why it is open Not published. The review's estimate of roughly 6% SAF rests on the prior year's disclosed abatement ratio, not on FY26 data
What would resolve it The split, and the SAF abatement tonnage for the year
?F-15
How much of the abatement line is credits retired, credits acquired but not retired, and tonnes accrued against credits not yet acquired
Why it is open The accounting basis is disclosed but the amounts are not. No credits were retired for CORSIA in the year, so the CORSIA component is at most acquired and may be wholly accrued
What would resolve it The three-way split by scheme, with retirement dates
?F-16
Carbon credit volumes for FY26 by scheme, type, vintage and serial number
Why it is open The compliance metrics table names the metric and leaves the values blank
What would resolve it The credit register
?F-17
The renewable-electricity claim for Australian buildings
Why it is open No LGC volume for any site, and the disclosed retirement position covers six months for the Melbourne Airport contract
What would resolve it Certificate procurement and retirement records
?F-18
Reconciliation of FY26 domestic Scope 1 to the statutory register
Why it is open The FY2025-26 NGER register is not published until February 2027. The prior year reconciles exactly, so this is a timing limit rather than a discrepancy
What would resolve it The FY2025-26 register when published
?F-19
The magnitude of emissions from partner-operated flights sold under a Qantas code
Why it is open Excluded from fuel reporting and not identified in any Scope 3 category
What would resolve it The estimate and its placement
?F-20
Financial effects beyond FY27, and the financial effect of fleet renewal
Why it is open Carbon costs are quantified for FY27 only, on the stated ground that measurement uncertainty beyond that is too high to be useful. Fleet renewal effects are withheld under the commercially sensitive exemption, which the standard permits
What would resolve it Quantified effects as the modelling matures
?F-21
Emissions of investees beyond their Scope 1
Why it is open Category 15 is measured on investee Scope 1 only
What would resolve it Investee Scope 2 and 3, or a statement that they are immaterial
?F-22
The basis for assessing Categories 13 and 14 not relevant
Why it is open Stated as assessed out; the assessment is not published
What would resolve it The relevance assessment

5. Disclosure risk exposure

5.1 Risk read

The dominant exposure is the gap between a reader's impression and the underlying position. Qantas publishes, in two documents, that it reduced net Scope 1 and 2 emissions by 12% against its 2019 baseline, while its gross emissions are the highest it has ever reported and sit above that baseline. Each individual statement is accurate on its stated basis, and the basis is disclosed. The risk is that the basis is disclosed in a footnote and in the notes, while the 12% is in the Chief Executive's review of operations.

A second exposure sits in the abatement line itself. Recognising abatement on acquisition, and on estimate where credits are not yet acquired, means the reported figure depends on obligations being settled later, on schemes whose settings the company itself describes as unresolved: CORSIA's first phase is said to have been "impacted by a shortage of eligible emissions units and a lack of regulatory enforcement", the Safeguard Mechanism faces a legislated review, and the baseline that will determine the CORSIA obligation is not calculated until after December 2026. If those obligations settle differently, the reported reduction was measured against an estimate.

Confidence is high on the arithmetic and the disclosure gaps, which are read directly from the documents. Confidence is lower on how a reader responds to them, which is a judgement rather than a measurement.

5.2 Risk by lens

Risk exposure by lens
Relative exposure across disclosure-risk lenses; see the table for what drives each and what would reduce it.
Source: Review analysis of the FY2026 disclosure suite
Legal (misleading-conduct / disclosure / director-duty)ModerateMedium confidence
Regulatory (ASIC / ACCC / Clean Energy Regulator / AASB S2)ModerateMedium confidence
Technology (dependence on unproven abatement)HighHigh confidence
Physical (physical-risk disclosure consistency)ModerateMedium confidence
Other: market / reputationalHighMedium confidence
Other: transition / policyHighHigh confidence
Other: governance / remunerationModerateHigh confidence
LensExposureConfidenceWhat drives itWhat would reduce it
Legal (misleading-conduct / disclosure / director-duty)ModerateMediumThe first mandatory report is delivered with a Directors' Declaration and unmodified assurance. The exposure is not compliance with the standard but the reader-impression gap between a headline reduction and rising gross emissions, in a document that now carries directors' sign-offThe fix at F-4
Regulatory (ASIC / ACCC / Clean Energy Regulator / AASB S2)ModerateMediumThe first mandatory report is delivered with a Directors' Declaration and unmodified assurance. The exposure is not compliance with the standard but the reader-impression gap between a headline reduction and rising gross emissions, in a document that now carries directors' sign-offThe fix at F-4
Technology (dependence on unproven abatement)HighHighSAF is 1.1% of fuel against a 10% requirement in four years, and is described as the only viable direct decarbonisation option. The pathway assumes SAF reaches approximately 60% of fuel by 2050—
Physical (physical-risk disclosure consistency)ModerateMediumScenario analysis covers physical risk across three scenarios and three horizons, with mitigations described. Financial effects are not quantifiedThe resolution at F-20
Other: market / reputationalHighMediumA 12% reduction headline, a Remuneration Report recording targets exceeded, and a discontinued efficiency metric, against a record footprint. The elements are individually defensible and cumulatively point one wayThe fixes at F-4, F-8 and F-9
Other: transition / policyHighHighRoughly 94% of the reported abatement depends on carbon markets whose settings the company describes as unresolved, and anticipated carbon costs of $117 million for FY27 are disclosed as gross and rising, with no reliable estimate beyond that yearThe fixes at F-5 and F-6
Other: governance / remunerationModerateHighThe scorecard applies a stricter test than the public target, which is the correct test in the wrong place: it means the company's own framework does not credit most of what its published headline countsThe fix at F-7

5.3 Consistency across audiences

Four statements in the FY26 suite are in tension with the rest of it. The Sustainability Report counts compliance-driven credits toward the voluntary 2030 target while the Annual Report excludes mandated abatement from executive pay as a standard outcome of business operations. The Remuneration Report records that Scope 1 emission reduction targets were exceeded in a year gross Scope 1 rose 6.4%. The targets section states that no revisions have been made to the targets two sentences after stating that the SAF target's expression has been refined. And the Scope 2 note states that there have been no changes to the measurement approach in the same paragraph that records the operational control boundary being re-assessed to add sites.

None of these is a misstatement in itself; each is accurate on its own terms. Together they mean a reader who reads one document carefully can reach a different view from a reader who reads the other, which is the exposure.

Claim / metricTo the regulatorTo investors / publicConsistent after normalising boundary?
Domestic Scope 1, FY25 comparative4,622,401 t on the FY2024-25 NGER register4,622.4 kt in the Sustainability Report 2026Yes: exact agreement at the disclosed precision
Domestic Scope 1, FY26Not published until February 20274,742.0 ktNot testable: the FY2025-26 register is not yet published
Whether compliance-driven abatement counts as progressNot a regulator metricCounted toward the voluntary 2030 target in the Sustainability Report; excluded from the Group Scorecard climate measure in the Annual Report as "a standard outcome of business operations"No: opposite tests applied to the same abatement in two documents published together
Direction of Scope 1 emissionsNot a regulator metricGross Scope 1 rose 6.4% to 12,916.4 kt; the audited Remuneration Report states "Reductions in Scope 1 GHG emissions exceeded the target"No: both statements are true of different quantities, and neither document says which
Whether the targets changedNot a regulator metric"The Group has refined how its SAF target is expressed" and "No further revisions have been made to the above targets since they were set", on the same pageNo: internal to one page
Whether the Scope 2 approach changedNot a regulator metric"re-assessed its Scope 2 operational control boundary during 2025/26, which resulted in the inclusion of additional international lounges and office locations" and "There have been no changes to the Group's Scope 2 location-based GHG emissions measurement approach", in the same paragraphNo: minor; boundary and measurement approach are different things, but the paragraph does not draw the distinction

6. How to fix it

6.1 NoCO2 Standard alignment

GapNoCO2 Net Zero Standard clauseDocument / clause requirementCurrent position
Abatement recognised on acquisition and on estimate5.1.12 Carbon Credit Reporting (retirement and cancellation evidence)A credit counts only when retired in a registry, evidenced by serial number and retirement dateRecognised on acquisition; an estimate is recognised where credits are not yet acquired; no CORSIA credits retired
Residual emissions defined before netting4.8.1 Abatement Principles (residual emissions defined after all feasible reduction)Residual emissions are what remains after reduction, and are stated before any credit is appliedGross is stated, but the reader-facing figure is the net, and gross is never compared with the baseline
No credit register published5.1.12 Carbon Credit Reporting (public disclosure of credit volume, type, vintage, project, standard)Annual register published with volume by schemeCredit types described; no volume disclosed for any scheme
Gross stated before netting in claims4.9.4 Public Reporting & Disclosure (gross emissions stated before any netting)Gross and net given equal prominence wherever a reduction is claimedThe 12% net appears in the CEO review of operations; gross appears only in the table
Claims not to overstate4.9.1 Use of Claims and Statements (claims must not overstate the entity's position)A claimed reduction reflects the direction of the entity's own emissionsReported reduction runs opposite to gross movement
Value chain inside the commitment boundary4.7 Reduction Obligations (value chain within the boundary of the commitment)Material value-chain categories fall inside the interim target architectureScope 3, 36.9% of the footprint, is outside the transition plan and every interim target
Completeness of the value-chain boundary4.4 Organisational Boundary; 4.5.3 GHG Emission Categories (every material activity placed in a scope and category)Activities sold under the entity's brand are placed or excluded with a quantified basisCodeshare emissions excluded from Scope 1 and unlocated in Scope 3
Interim milestones4.7.4 Accelerated Reduction Timeline (milestones at no more than five-year intervals across the commitment period)Quantified waypoints across the whole commitment periodNo quantified milestone between 2030 and 2050
Certificate claims stated as at period end4.9.1 Use of Claims and Statements (claims stated as at the reporting date); 5.1.13 Contractual Instruments for Purchased EnergyRenewable claims rest on certificates retired by the reporting date"Was achieved" stated where retirement covers six months for one contract

7. Conclusion & next steps

Qantas's first mandatory climate report is a substantially better document than the one before it. Scope 3 is broken out by category for the first time, both Scope 2 bases are published, the 2019 baseline is back in the table, the internal carbon price and next year's carbon costs are disclosed, and the whole is signed by directors and assured at the level the phase-in requires. For a reader who wants to know what Qantas emits and how it was measured, the answer is now in the document and it holds together: every identity reconciles and the prior year ties to the statutory register exactly. That is why the carbon accounting reader is served well here.

For every other reader the result turns on one thing, and it is not a disclosure gap. Qantas's emissions rose. Gross Scope 1 and 2 reached the highest level the company has reported and stand 3.8% above the 2019 baseline the 25% target is measured from, with four years left; the total footprint reached 20.5 million tonnes. The report leads instead with a 12% net reduction, and that figure is produced by a single 1,952.7 kilotonne line which the company recognises when a credit is acquired, and, where credits have not been acquired, on an estimate of what it will owe. No credits were retired for the international scheme at all. On the company's own prior-year ratio, roughly 94% of that line is carbon markets rather than SAF, though Qantas does not publish the split and no credit volume appears anywhere in the suite.

The company is not concealing the mechanism. The accounting basis is set out in the notes, the footnote to the headline table says the obligations may be acquired or retired in the future, and Qantas states plainly that buying credits "is not the same as preventing emissions from aviation in the first place". What it does not do is put the mechanism next to the number. The result is a suite in which the Chief Executive reports a 12% reduction, the Remuneration Report records emission reduction targets exceeded, the efficiency metric that would have shown the real trend has been withdrawn, and the reader is left to do the subtraction that reveals the direction of travel.

Three things would change the picture materially, and none requires a change in performance. Publish the abatement line's composition, so the 12% can be read for what it is. State the gross position against the baseline wherever the net position appears. Restore the per-kilometre efficiency series, which is the one measure that showed the fleet and SAF program working, and which is genuine: SAF rose more than fivefold this year, the credit mix moved to nature-based removals, and forty efficiency initiatives were quantified one by one. Those are real, and they are currently harder to see than the number that is not.

Important information

This diagnosis is general information, published to support transparency, accountability and public debate on corporate climate disclosure. It sets out CRI's assessment of the publicly available climate disclosures of the organisation named above, for the reporting period stated, based on third-party information available at the review date. The assessment is made against CRI's Climate Disclosure Review Rules (version stated above), which use the CRI Net Zero Standard as the reference for a credible claim together with AASB S2 Climate-related Disclosures, and it gives reasons for each finding.

It assesses the disclosure, not the organisation's underlying climate performance or intent, and it does not allege illegality, misconduct, greenwashing or dishonesty. It is not tailored advice, nor legal, financial or investment advice, and it is not an audit, an assurance engagement or a certification. CRI does not accept liability for any error or omission in this analysis, or for any loss arising from use of or reliance on it.

AI tools help locate, extract and organise material from the source documents against a fixed rule set. Every rating and conclusion is reviewed and confirmed by CRI analysts; the rules, not the model, determine the outcome.

Organisations may contact CRI at robc@noco2.com.au to identify an error, provide relevant public information or request review of updated disclosures. Where a correction affects a finding, the diagnosis is updated and the change is noted. Further information about the review method is at noco2.com.au.

© Carbon Reduction Institute Pty Ltd, ABN 26 122 969 233. This report is protected by copyright. It reproduces third-party material for the purpose of criticism and review; any reproduction of this report not permitted under the Copyright Act 1968 (Cth) requires CRI's consent.

--- ANNEXES (internal working layer) ---

These annexes are the detailed working layer behind the findings in the body: the evidence base, rule application and traceability. Much of it is review working, retained for transparency and of interest to both the internal review team and external readers who want to see how each finding was reached.

Annex A: Documents reviewed & completeness (A-01A)

#DocumentPeriod coveredClassReviewedEffect if missing
A-1Qantas Group Sustainability Report 2026 (Climate Statements 2026, Notes, Directors' Declaration, KPMG assurance report)FY26CriticalYesPrimary: the statutory sustainability report
A-2Qantas Annual Report 2026FY26CriticalYesPrimary audited financial source; Remuneration Report
A-3Qantas Group Sustainability Reports 2022–2025FY22–FY25MaterialYesPrior-period series and dropped-disclosure detection
A-4Qantas Annual Reports 2020–2025FY20–FY25MaterialYesPrior-period context
A-5Climate Active PDS chain FY2019-20 to FY2023-24FY20–FY24MaterialYesHistorical certification chain; no live FY26 claim depends on it
A-6Sustainability Report Appendix FY25 (.xlsx)FY25OptionalYesContent index and glossary
A-7NGER register FY2024-25 (Clean Energy Regulator)FY25MaterialYesStatutory anchor for the FY25 comparative
A-8Carbon credit register FY26FY26Critical, not providedNoThe abatement line producing the headline cannot be verified: F-14, F-15, F-16
A-9LGC procurement and retirement records FY26FY26Material, not providedNoRenewable claim cannot be verified: F-17
A-10NGER register FY2025-26FY26Material, not yet publishedNoStatutory reconciliation deferred: F-18. Publication due February 2027

Corpus scoping note. The corpus was scoped to FY2026 and earlier. No document covering a later period exists at the review date, so no forward exclusion was necessary.

Non-publication versus non-provision. Items A-8 and A-9 are "not provided": they are internal records that would not normally be published, and their absence is a limit on this review, not a finding against Qantas. Item A-10 is not yet published by the regulator. The report does not imply any of this information does not exist.

Annex B: Evidence table (AI-02)

IDEvidenceSource & locationUsed for
E-01Gross Scope 1 FY26 12,916.4 kt (domestic 4,742.0, international 8,174.4)SR26 Climate Statements p.27; confirmed KPMG audit opinion p.45§3.1, F-4, D2-01
E-02Scope 2 location-based FY26 55.0 kt; market-based 0.9 ktSR26 p.27; confirmed KPMG audit opinion p.45§3.1, §3.3, D3-01
E-03Gross Scope 1+2 FY26 12,971.4 kt; FY19 baseline 12,493.6 ktSR26 p.27, arithmetic verifiedF-4, I2, I3
E-04Abatement line 1,952.7 kt; net Scope 1+2 11,018.7 kt; reduction 12%SR26 p.27F-4, F-5, I3
E-05Footnote 20: the line "includes estimated CORSIA and Safeguard Mechanism emissions abatement obligations that may be acquired or retired in the future"SR26 p.27 fn20F-5, F-15
E-06Recognition basis: one credit "acquired, and added to the Group's carbon credit inventory, is recognised as one tonne of CO₂-e emissions abated in the year of acquisition"; and an estimate is recognised "where the associated carbon credits have not yet been acquired"SR26 Notes to the Climate Statements p.42F-5
E-07"No carbon credits were retired for use toward the Group's CORSIA requirements"SR26 p.33F-5, F-15
E-08Compliance metrics table names "Eligible carbon credits acquired and retired" for CORSIA and Safeguard, units given, values blankSR26 p.25F-6, C-1
E-09Scope 3 by category FY26: C1 2,634.9; C2 1,070.2; C3 3,382.1; C15 276.8; C4–C9 208.6; total 7,572.6 ktSR26 p.28; total confirmed KPMG review conclusion p.44§3.1, A1, D4-01
E-10Categories 1–9 and 15 relevant; Categories 10–14 "assessed to be not relevant and therefore have not been measured"SR26 Notes p.41A1, F-22
E-11Scope 3 method and emission factors by category (EXIOBASE 2011 inflation and currency adjusted; NGA; DEFRA; CORSIA)SR26 Notes pp.41–42A3, A4
E-12SAF FY26 55,214 kL, 1.1% of 5,092,639 kL jet fuel; FY25 10,436 kL, 0.2%SR26 p.30F-1, F-10, D6-02
E-13LAX offtake approximately 50 million litres per annum; first Vancouver procurement; London Heathrow under the UK SAF MandateSR26 p.30F-1
E-14SAF target footnote: SAF "physically delivered into shared fuelling infrastructure at airports used by the Qantas Group (where the physical fuel may be used by Qantas Group or other airlines)" and "may include environmental attributes secured on a book-and-claim basis"SR26 p.24 fn14; and p.30 fn23F-10
E-15"The Group has refined how its SAF target is expressed"; "No further revisions have been made to the above targets since they were set"SR26 p.24F-10, C-3, G2
E-16Safeguard credits FY26 100% carbon-removal ACCUs from nature-based projects; other credits ACCU Scheme, VCS or Gold StandardSR26 p.33F-2
E-17Carbon Market Integrity Framework: six-step process, third-party expert review, Carbon Markets Governance Forum, annual red-flag reassessmentSR26 pp.31–32F-2
E-18VCP credits ring-fenced from compliance and voluntary positions apart from the RAP commitmentSR26 p.33§3.3
E-19Efficiency initiatives FY26: 40+ initiatives, 40 kt total; engine overhaul 6.6 kt; procedures 6.0 kt; GPUs 3.0 kt; winglets 2.9 kt; airspace 2.5 kt; flight planning 1.8 ktSR26 pp.28–29F-3
E-20LGCs: Melbourne Airport GreenPower contract, "sufficient LGCs have been retired for the first six months of the reporting period"; other sites purchase and surrender LGCs to the equivalent value of residual consumptionSR26 Notes p.41F-11, F-17
E-21"committed to sourcing 100 per cent renewable energy for its Australian buildings, which was achieved through the acquisition and retirement of LGCs"SR26 p.27F-11
E-22Scope 2 boundary "re-assessed... during 2025/26, which resulted in the inclusion of additional international lounges and office locations"; and "no changes to the Group's Scope 2 location-based GHG emissions measurement approach since the last reporting period"SR26 Notes p.41A3, C-2, G2
E-23"The Group includes emissions from lease arrangements under operational control and excludes any emissions from codeshare arrangements, which aligns with industry peers"SR26 Notes p.40F-12, F-19
E-24Aviation fuel scope "does not include aviation fuel consumed by Jetstar Asia, Jetstar Japan or codeshare partners"SR26 p.30 fn22F-12
E-25Scope 3 "not currently included in the pathway or interim targets"; "Over time, the Group aims to expand the pathway to include Scope 3 emissions"SR26 p.26F-13, A-21 treatment
E-26"The Group's pathway to 2050 does not currently include further quantified milestones beyond 2030"SR26 p.24F-13
E-27Pathway lever shares to 2050: technology and operational 25–35%; SAF 30–40%; carbon credits 30–40%; SAF approximately 60% of fuel by 2050SR26 p.26§5.2, F-13
E-28"The pathway and targets have not been validated by an external third party"SR26 p.24§1.2
E-29Group Scorecard climate measure: "Scope 1 GHG emissions reduction from the procurement of SAF and operational improvement initiatives to reduce fuel burn"; mandatory SAF abatement excluded "as it is considered a standard outcome of business operations"AR26 pp.46–47F-7, G2
E-30"Reductions in Scope 1 GHG emissions exceeded the target... higher-than-contracted SAF emissions abatement (approximately 85 per cent versus 80 per cent contracted)"AR26 p.45F-8, D-7, G2
E-31Review of Operations: "reducing our net Scope 1 and 2 (location-based) emissions by 12 per cent against the 2019 baseline... through a five-fold increase in Sustainable Aviation Fuel procurement, execution of fleet and operational improvement initiatives and continued compliance with carbon credit schemes"AR26 p.28F-4, P2
E-32Directors' Declaration under s296A(6), signed by the Board Chair and Chief Executive Officer, 27 August 2026SR26 p.43G1
E-33KPMG audit opinion over Scope 1 and Scope 2 (both bases); review conclusion over governance, strategy and Scope 3; both unmodifiedSR26 pp.44–46G1, A4
E-34Anticipated FY27 carbon costs: domestic compliance $25m, international compliance $66m, voluntary $26m, total $117mSR26 p.19§5.2, F-20
E-35"reliable estimation and disclosure of carbon costs beyond 2026/27 is not currently practicable and the level of measurement uncertainty is so high that the resulting quantitative disclosure would not be useful for users"SR26 p.19F-20, G1
E-36Internal carbon price AUD $60 to $70 per tCO₂-e, gross, FY26–FY28 planning averageSR26 p.21§3.4, F-20
E-37Fleet renewal financial effects withheld under the commercially sensitive exemptionSR26 p.21F-20
E-38Scenario analysis: three scenarios (low Paris-aligned, medium, high), three horizons to 2050, IPCC SSPs, IEA, BNEF, ATAG inputs; resilience assessment concludes no need for fundamental change to the business modelSR26 pp.10–11, 21I1, R3
E-39CORSIA first phase "impacted by a shortage of eligible emissions units and a lack of regulatory enforcement of the scheme's rules"; CORSIA baseline calculated after 31 December 2026; units to be retired by 31 January 2028SR26 pp.20, 25§5.1, §5.2
E-40"financing carbon projects outside the aviation sector through the purchase of carbon credits is not the same as preventing emissions from aviation in the first place"SR26 p.31R4, P1
E-41From FY27 the Group will no longer purchase carbon credits for Ground and Duty Travel, a commitment made in 2007SR26 p.33§3.4, P3-3
E-42NGER register FY2024-25: QANTAS AIRWAYS LIMITED, Scope 1 4,622,401 t, Scope 2 location-based 57,564 tClean Energy Regulator register, retrieved 1 September 2026 via tools/ngers-lookup.ps1A2, O-1, D2-02
E-43Available seat kilometres FY26 157,957 M; FY25 152,804 MAR26 five-year history p.3F-9, D-8
E-44No intensity metric of any kind appears in SR26Full-text search of SR26 for "RTK", "100 RTK", "kg CO", "intensity": no metric table returnedF-9, P3-1
E-45No reference to Climate Active or any carbon-neutral claim appears in SR26 or AR26Full-text search of both documents, 1 September 2026§1.2, §2.3, A-18 treatment
E-46Critical judgements list includes "Setting the boundaries of the transition plan, including the exclusion of Scope 3 emissions from interim targets, the net-basis approach to target setting"; and "Recognising carbon credit obligations on an accrual basis from the point emissions arise, as provisions and as inventory"SR26 p.6F-5, F-13, A3

Annex C: Claim register (AI-18 / OUT-TB-15)

IDClaim as printedClaim objectSourceStrengthAudienceAttributionEvidence found / missingStatus
C-01"In 2025/26 the Group achieved a net Scope 1 and 2 emissions reduction of 12 per cent against the 2019 baseline despite continued growth in flying activity"Net Scope 1+2, location-based, after SAF and carbon creditsSR26 p.27Strong, headlineAllSelf-declared, no external validationFound: arithmetic reconciles on the company's stated basis. Missing: the composition of the abatement line, and any statement that gross emissions are above the baselineDecision-usefulness concern: true on a disclosed basis whose effect runs opposite to the reader's likely reading
C-02"reducing our net Scope 1 and 2 (location-based) emissions by 12 per cent against the 2019 baseline"As C-01AR26 p.28, Review of OperationsStrong, headlineRetail, publicSelf-declaredAs C-01, with no footnote carried across into the Annual ReportDecision-usefulness concern
C-03"SAF procured equivalent to 10 per cent of jet fuel consumption by 2030"SAF procurement targetSR26 p.24; AR26 p.20Strong, forwardAllSelf-declaredFound: FY26 at 1.084%. Missing: contracted volumes to FY30. Definition now admits book-and-claim attributes and fuel uplifted by other airlinesDecision-usefulness concern (F-10)
C-04"committed to sourcing 100 per cent renewable energy for its Australian buildings, which was achieved through the acquisition and retirement of LGCs"Australian buildings electricitySR26 p.27Strong, completeness word bound to a named quantityPublic, retailSelf-declared, GreenPower accreditation for the Melbourne contractFound: market-based Scope 2 of 0.9 kt, audited. Missing: LGC volumes; and the notes disclose retirement covering six months for the Melbourne contractDecision-usefulness concern (F-11); not a falsity finding (A-05)
C-05"the Group's commitment to sourcing the equivalent of 100 per cent renewable energy for its Australian buildings"As C-04SR26 p.26ModerateAllSelf-declaredThe more accurate of the two formulations of the same claimNo apparent issue; noted as an internal wording inconsistency
C-06"reduce net Scope 1 and Scope 2 greenhouse gas (GHG) emissions by 25 per cent (from 2019 levels) by 2030"Interim targetSR26 p.24; AR26 pp.20, 111Strong, forwardAllSelf-declared, not externally validatedFound: baseline 12,493.6 kt; target value 9,370.2 kt derivable. Gap from net 1,648.5 kt, from gross 3,601.2 ktDecision-usefulness concern on progress attribution (F-7)
C-07"net zero emissions by 2050" covering "Absolute gross Scope 1, 2 and 3 emissions... minus emissions abatement, mostly from SAF procurement and carbon credits"Group-wide net zeroSR26 p.24Strong, forwardAllSelf-declared; aligned to ICAO LTAG and IATA, not validatedFound: lever shares disclosed (credits 30–40%). Missing: any quantified milestone between 2030 and 2050Decision-usefulness concern (F-13)
C-08"Reductions in Scope 1 GHG emissions exceeded the target"Scorecard climate measure outcomeAR26 p.45 (audited Remuneration Report)StrongRetail, publicSelf-declared, audited as part of the Remuneration ReportFound: the scorecard measures the abatement increment. Missing: any statement beside it that gross Scope 1 rose 6.4%Decision-usefulness concern (F-8)
C-09"100 per cent of carbon credits retired to meet Safeguard Mechanism requirements are carbon removal ACCUs from nature-based projects certified by the Clean Energy Regulator"Safeguard credit qualitySR26 p.33Moderate, bounded on its faceInstitutional, regulatorsSelf-declared; underlying units certified by the Clean Energy RegulatorFound: the statement is bounded to the Safeguard portion and states its own scope. Missing: volumesNo apparent issue on the claim; volume is F-16
C-10"financing carbon projects outside the aviation sector through the purchase of carbon credits is not the same as preventing emissions from aviation in the first place"Carbon credit limitationSR26 p.31CaveatAllSelf-declaredAccurate and co-located with the credit discussionNo apparent issue; baseline candour, not credited (A-16)
C-11"The pathway and targets have not been validated by an external third party"Target validation statusSR26 p.24CaveatAllSelf-declaredAccurateNo apparent issue
C-12"No further revisions have been made to the above targets since they were set"Target stabilitySR26 p.24ModerateAllSelf-declaredContradicted two sentences earlier by "the Group has refined how its SAF target is expressed"Decision-usefulness concern (F-10)

Annex D: Detailed findings, two-track (A-03)

D.1 Applicability gate & AASB S2 (Sections 04–05)

IDRuleMinimum-compliance findingDecision-usefulness / claim-quality findingSeverityConfidence
D1-01L-01..L-14, S2-01..06Met. Qantas is a Group 1 entity with a 30 June balance date; FY26 is the first mandatory reporting period. Climate Statements prepared under AASB S2, Directors' Declaration given under s296A(6), assurance obtained under ASSA 5010 at the mandated levelThe obligation is met and identified in terms; the reader can see which document is the statutory oneNo apparent issueHigh
D1-02S2-07..S2-13 (governance)Met. Board oversight described with a two-stage annual strategy review; climate considered in fleet and capital allocation with the internal carbon price applied. Reviewed at limited assuranceGovernance is described at a level a reader can interrogateNo apparent issueHigh
D1-03S2-14..S2-24 (strategy, scenario analysis, resilience)Met. Three scenarios across three horizons using IPCC SSPs, IEA, BNEF and ATAG inputs; resilience concluded without need for fundamental business-model changeMethod disclosed in enough detail to interrogate. The review does not judge modelling quality (N-04)No apparent issueMedium
D1-04S2-31..S2-37 (financial effects)Met, with permitted exemptions. FY27 gross carbon costs quantified at $117m split three ways; carbon costs beyond FY27 withheld on measurement uncertainty; fleet renewal effects withheld as commercially sensitive. All three exemptions are available under the standard and their use is disclosedQuantification for one forward year is a material advance on a qualitative position. The reader still cannot price the transition beyond FY27Minor limitationHigh
D1-05S2-38..S2-42 (targets)Met. Targets, base year, coverage, metrics and units disclosed; validation status stated; review cycle describedThe target architecture is legible. Its content is assessed at D6No apparent issueHigh

D.2 GHG inventory foundation & Scope 1 (Sections 06–07)

IDRuleMinimum-compliance findingDecision-usefulness / claim-quality findingSeverityConfidence
D2-01G-01..G-05, G-06, S2-26Met. Scope 1 12,916.4 kt, split domestic 4,742.0 and international 8,174.4; operational control; methods and factors disclosed per geography; reasonable assuranceFully liftable. The domestic/international split lets a reader separate the NGER-regulated portion from the CORSIA-regulated oneNo apparent issueHigh
D2-02A-01C, DR-02Met for the prior year. FY25 domestic Scope 1 of 4,622.4 kt agrees exactly with the NGER register's 4,622,401 t. FY26 cannot yet be tested; the register is published February 2027The most direct available evidence that a reported figure is real, carried forward from the prior yearNo apparent issueHigh
D2-03G-06, G-07 (scope decomposition)Met. Scope 1 and Scope 2 are reported separately and Scope 2 on both bases; no combined figure is the sole basis of any finding in this reviewDecomposition performed throughout §3.3No apparent issueHigh
D2-04G-10, GHG-STD-08 (restatement and comparability)Met. No prior-year figure is restated. The FY25 Scope 3 comparative is disaggregated onto categories, which is an addition rather than a restatementComparability across the series holds. The FY23 Scope 3 boundary break persists in the series and is not re-explained in FY26, though the FY26 movement is within a stable boundaryMinor limitationHigh
D2-05G-04, G-05 (boundary transparency)Partly met. The Scope 2 operational control boundary was re-assessed in FY26 to add international lounges and offices. The same paragraph states there have been no changes to the measurement approach; comparatives are not restated for the added sitesA reader is told the boundary widened but not by how much, so the disclosed 5.3% Scope 2 decrease spans a boundary change and the like-for-like decrease is largerMinor limitationHigh
D2-06G-20 (boundary reach, which-scope test)Applied. Codeshare-operated flights sold under a QF code would, if counted, be a purchased service and therefore Scope 3, not Scope 1. The consolidation approach governs Scope 1 and 2 and does not reach Scope 3, so operational control does not answer the question the exclusion is put onThe exclusion is stated in Scope 1 boundary terms; the report does not say whether these emissions sit in any Scope 3 category. Magnitude cannot-verifyDecision-usefulness concernMedium

D.3 Scope 2 & renewable electricity (Section 08)

IDRuleMinimum-compliance findingDecision-usefulness / claim-quality findingSeverityConfidence
D3-01S2-28, G-07, E-01..E-07Met. Dual-basis Scope 2 published for the first time: location-based 55.0 kt, market-based 0.9 kt, both under reasonable assuranceThe gap of 54.1 kt, 98.4% of location-based Scope 2, is now visible to a reader. Scope 2 is 0.27% of the footprint, so the gap is material to the claim and immaterial to the totalNo apparent issue on reportingHigh
D3-02E-08..E-16 (certificate claims)Partly met. LGC acquisition and retirement is asserted and a GreenPower contract identified. No LGC volume is published for any site, and the notes disclose retirement covering the first six months of the period for the Melbourne Airport contract, with the remainder resting on the contract continuing"Was achieved" is stated of a completed year on certificates partly still to be retired at the reporting date. Not a falsity finding: the qualification is disclosed in the notesDecision-usefulness concernHigh
D3-03E-24 (enablement versus use)Applied. The claim is about matching consumption with certificates, and the more careful formulation elsewhere in the report says "the equivalent of 100 per cent renewable energy", which is the accurate descriptionTwo formulations of one claim appear in the same document, one bounded and one notMinor limitationHigh

D.4 Scope 3 & value chain (Section 09)

IDRuleMinimum-compliance findingDecision-usefulness / claim-quality findingSeverityConfidence
D4-01S2-29/30, S3-01..S3-31Met. Scope 3 disaggregated by GHG Protocol category for the first time: four categories itemised, C4–C9 aggregated and bounded at under 3%, C10–C14 assessed not relevant. Total 7,572.6 kt under limited assuranceA carbon accountant can now see the composition of 36.9% of the footprint and lift it by category. This is what OUT-STK-13's rebuttal test requiresNo apparent issueHigh
D4-02S3-ESTNot scored. C1, C2, C4, C6 and C8 use spend-based methods on EXIOBASE factors adjusted for inflation and currency. Estimation is the expected starting point and is not a faultRecorded as an improvement note only. The company states an intention to move to supplier-specific factors, which is neutral until deliveredNo apparent issueHigh
D4-03S3-25, G-19Partly met. Codeshare emissions are not identified in any category. The report's basis for exclusion is operational control and peer practiceSee D2-06. Escalated to F-12 and F-19Decision-usefulness concernMedium
D4-04S3-26 (categories optional to report)Met. C10–C14 assessed not relevant with the assessment stated. For a passenger and freight airline, C10, C11 and C12 are defensible on their face; C13 and C14 are asserted without published reasoningCarried as F-22, not as a findingMinor limitationMedium
D4-05S3-16, C15 scopePartly met. Category 15 measured on investee Scope 1 only, using the CORSIA methodInvestee Scope 2 and 3 are outside the figure and this is not stated as a limitation. Carried as F-21Minor limitationMedium

D.5 Offsets, credits & net claims (Section 10)

IDRuleMinimum-compliance findingDecision-usefulness / claim-quality findingSeverityConfidence
D5-01G-11, E-08..E-22Not met on retirement evidence. Abatement is recognised on acquisition, and on estimate where credits are not yet acquired. No credits were retired for CORSIA in the year. No volume is disclosed for any schemeThe headline net figure counts tonnes for which no credit has been retired, and in part none purchased. The convention that a credit counts on retirement exists because retirement is what prevents reuseDecision-usefulness concernHigh
D5-02E-17..E-20 (credit integrity)Met and improving. All Safeguard credits retired in FY26 are carbon-removal ACCUs from Clean Energy Regulator certified nature-based projects; other credits are ACCU Scheme, VCS or Gold Standard reduction credits. A documented integrity framework with third-party review and a governance forum governs purchaseA genuine improvement in instrument quality against a certified customer-program mix two years earlier that was 54% Certified Emission Reductions. Cannot be weighted without volumesNo apparent issue; qualified positive at F-2Medium
D5-03E-21, double countingMet. Customer Voluntary Carbon Program credits are ring-fenced from the Group's compliance and voluntary positions, apart from a stated Reconciliation Action Plan commitmentCorrect treatment. Baseline, not credited (A-16)No apparent issueHigh
D5-04A-18 (exit is neutral)Applied. The Climate Active program and any carbon-neutral claim are absent from the FY26 suite. From FY27 the Group ends carbon credit purchasing for ground and duty travel, a 2007 commitmentBoth scored neutral. No live FY26 claim depends on the certification, so the prior open question about its continuation lapsesNo apparent issueHigh
D5-05A-19 / G-BAUNot met. No decomposition of the reported movement between real abatement, business-as-usual and accounting instruments is published. The company attributes the Scope 2 fall "largely" to grid decarbonisation without quantifying the splitThe reader is given a 12% figure and no means to attribute it. The review's own decomposition is at §3.3 and its SAF component is derived, not disclosedDecision-usefulness concernHigh

D.6 Targets & transition (Section 11)

IDRuleMinimum-compliance findingDecision-usefulness / claim-quality findingSeverityConfidence
D6-01T-01..T-13, S2-38..42Met on disclosure. Baseline, base year, coverage, metric, units and target year are all printed in the report for the first time since FY22. Headroom is directly derivable: target 9,370.2 kt, net position 11,018.7 kt, gap 1,648.5 ktThe single largest improvement in the report for an institutional reader. What is derivable is also what defeats the progress claim: gross is 3,601.2 kt from the targetNo apparent issue on disclosure; see D6-02 on progressHigh
D6-02A-19, A-17Not met on progress honesty. Gross Scope 1+2 rose 6.3% to 12,971.4 kt and is 3.8% above the baseline. The reported 12% rests wholly on the abatement lineThe headline claim's direction is opposite to the physical movement, and the report does not state the gross position against the baseline anywhereDecision-usefulness concernHigh
D6-03T-14 (intensity versus absolute)Not applicable this year, and adversely so. The company published no intensity metric in FY26, so there is no intensity target to qualify. The per-RTK series carried in every prior year is absentThe rule's usual concern is intensity substituting for absolute. Here the intensity measure was withdrawn while absolute emissions rose, which removes the one measure separating efficiency from volumeDecision-usefulness concernHigh
D6-04T-DEP-04 (externally dependent target)Partly met. The pathway depends on SAF supply, carbon market settings and policy, all disclosed as outside the Group's control, with the dependencies listedDependencies are named and the risk of non-delivery is stated plainly. No fallback plan is given and no bridge from 1.1% to 10% SAF by yearDecision-usefulness concernHigh
D6-05T-COV-02, S3 target coverageNot met. 36.9% of the footprint sits outside every interim target and outside the transition plan; no quantified milestone exists between 2030 and 2050A stated intention to expand the pathway to Scope 3 over time is neutral under A-21 and is not the evidence for this finding; the present exclusion isDecision-usefulness concernHigh
D6-06T-BASE-01, S2-41Partly met. The 25% target is unchanged in base year, coverage and value. The SAF target's expression was "refined" to admit book-and-claim attributes and fuel that may be uplifted by other airlines, in the same paragraph stating no revisions have been madeA target definition change presented as a non-revision. The footnote discloses the substance, which is why this is a decision-usefulness concern rather than a stronger labelDecision-usefulness concernHigh

D.7 Governance, remuneration & assurance (Section 12)

IDRuleMinimum-compliance findingDecision-usefulness / claim-quality findingSeverityConfidence
D7-01GOV-01..GOV-16, assuranceMet. Audit opinion over Scope 1 and Scope 2 on both bases; review conclusion over governance, strategy and Scope 3. Both unmodified and both at the mandated phase-in levelObtaining the mandated level is baseline and is not credited (A-16). The prior year's reasonable assurance was obtained ahead of obligation; this year it is the obligationNo apparent issueHigh
D7-02A-11, GOV remunerationPartly met. The Group Scorecard climate measure covers Scope 1 reduction from SAF procurement and operational improvement only, excluding carbon credits, and excludes mandatory SAF abatement as a standard outcome of business operationsThe business-as-usual test applied to pay is the correct test. It is not applied to the published target, which counts the credits the scorecard will not. The same suite applies opposite tests to the same abatementDecision-usefulness concernHigh
D7-03OUT-TB-02 (reader impression), GOVNot met. The audited Remuneration Report records that Scope 1 emission reductions "exceeded the target" in a year gross Scope 1 rose 6.4% to a recordAccurate as a statement about the scorecard's abatement increment; the sentence does not say so, and nothing beside it gives the emissions directionDecision-usefulness concernHigh
D7-04Assurance perimeter versus claimGap. The abatement line of 1,952.7 kt, which produces the headline result, is not among the assured figures. Scope 1, Scope 2 and Scope 3 gross totals are assured; the netting is notThe number the reader is given is the one number in the emissions table outside the assurance perimeterDecision-usefulness concernHigh

D.8 Sector module & new-module findings (Section 13)

IDRuleMinimum-compliance findingDecision-usefulness / claim-quality findingSeverityConfidence
D8-01SEC-AVI (aviation)Met. Fuel is over 99% of Scope 1; the fleet, SAF and carbon market levers are each described with quantified FY26 contributions for the first twoSector-appropriate structure. The absent per-RTK measure is the sector's standard efficiency metric and its removal is a sector-specific lossDecision-usefulness concernHigh
D8-02SEC-AVI, SAFMet and improving. SAF up 5.29× to 1.084% of jet fuel with committed offtake, an integrity framework requiring ISCC or RSB certification and at least 50% lifecycle reduction, and approximately 85% lifecycle reduction achieved against 80% contractedGenuine in-sector abatement. The gap to a 10% 2030 requirement is roughly nine-fold in four years and no annual contracted volume is publishedNo apparent issue; qualified positive at F-1High
D8-03SEC-AVI, compliance schemesMet. CORSIA and Safeguard Mechanism obligations described with their mechanics, deadlines and current uncertaintiesThe company discloses that CORSIA's first phase has been affected by a unit shortage and enforcement gaps, and that its own baseline is not calculable until after December 2026No apparent issueHigh
D8-04SEC-INV-LT-17, T-INV-01Met. Category 15 quantified at 276.8 kt and explained; Jetstar Asia ceased 31 July 2025Look-through is raised and now sized, which the prior year could not do. Investee Scope 2 and 3 remain outsideMinor limitationMedium

D.9 Nature & physical risk (Section 14)

IDRuleMinimum-compliance findingDecision-usefulness / claim-quality findingSeverityConfidence
D9-01N-01..N-03Met. Physical risk assessed for the aviation segments across three scenarios and three horizons; hazards named (high temperatures, flooding), assets identified (airport infrastructure), mitigations described including airport engagement and supply chain resilienceRelevant to the business model and transparent enough to interrogate. The review does not assess modelling quality (N-04)No apparent issueMedium
D9-02N-01..N-03, financial linkagePartly met. Physical risk financial effects are not quantified; the not separately identifiable and measurement uncertainty exceptions are applied and disclosedA reader cannot size physical exposure. The exemptions are available under the standardMinor limitationHigh
D9-03NatureMet. Nature-based carbon projects described with biodiversity and First Nations co-benefits; Australia's first Nature Repair Market project co-located within a carbon project registered in the yearRecorded as context. Not credited as a climate positiveNo apparent issueMedium

Annex E: Cross-rule escalation chains (AI-06 / AI-23)

ChainBase findingEscalates toLink statedNet effect
CH-1D5-01: abatement recognised before retirement, and in part before acquisitionD6-02 (target progress), D7-04 (assurance perimeter), C-01/C-02 (headline claims)The abatement line is the entire difference between a 3.8% overshoot and a reported 12% reduction, so its recognition basis determines whether the headline claim standsDefeats I3; principal driver of R1 and P2
CH-2D5-05: no BAU or real-versus-accounting decomposition publishedD6-02, F-4Without the split, the reader cannot attribute the reported movement, and the company's own narrative attributes the Scope 2 fall "largely" to the grid without quantifying itReinforces the I3 defeat
CH-3D7-02: compliance abatement excluded from pay, counted in the public targetD6-02, O-3The company's own stated test for what counts as achievement is applied in one document and not the other, on the same abatement, in the same suiteDefeats G2; contributes to I3
CH-4D7-03: Remuneration Report records reductions exceeded targetC-08, P2An audited document tells a retail and public reader that emission reduction targets were exceeded in a record-emissions yearContributes to P2 and G2
CH-5D6-03: per-RTK intensity series withdrawnP2, F-9Removing the measure that separates efficiency from volume, in the year volume rose, leaves the composite impression uncorrectedContributes to P2
CH-6D2-06 / D4-03: codeshare unlocatedA1 (tested, not defeated), F-19The which-scope test places codeshare in Scope 3 where operational control does not reach; but this is a within-category content question, not an absent categoryRecorded; does not defeat A1
CH-7D6-06: SAF target expression changed while stated unchangedC-03, C-12, G2The target's meaning and the statement about its stability are in the same paragraph and disagreeContributes to G2

Annex F: NoCO2 Net Zero Required Interventions, CAAM & Prohibited Activities screen (OUT-05)

ScreenResultBasis
Prohibited activitiesNone identifiedNo activity on the prohibited list is disclosed or evident
Controversial activities requiring assessment (CAAM)None identifiedAviation is a hard-to-abate sector, not a CAAM-listed activity
Required interventionsThree(i) publish the abatement line's composition including retirement status; (ii) state gross against baseline wherever net is stated; (iii) restore or replace the withdrawn efficiency metric
Nature / biodiversity screenNo adverse findingNature-based credit projects carry disclosed biodiversity and First Nations co-benefits

Annex G: Rule-application table

Rule IDAppliedOutcomeWhere it shows
A-01AYesDocument set complete but for the credit and LGC registers, both "not provided" not "not published"Annex A
A-01BYesRating derived from FY26 on the audited and assured statutory sources; prior years context only§2, Annex K
A-01C / DR-02YesFY25 domestic Scope 1 reconciles exactly to the NGER register; FY26 register not yet publishedAnnex J, D2-02
A-03YesTwo-track findings produced for every rule familyAnnex D
A-04YesPermitted severity labels onlyAnnex D
A-05YesNine cannot-verify items; no absence treated as proof either way§4.3
A-16YesFirst-mandatory-year compliance, dual-basis Scope 2, Scope 3 disaggregation, assurance at the mandated level, candour and the ICP disclosure are all baseline and none is credited as a positive§4.1, D7-01
A-17YesThe unsubstantiated headline sets the ceiling for institutional, retail and public rows despite a materially better inventoryAnnex L
A-18YesClimate Active absence and the ground and duty travel commitment withdrawal both scored neutralD5-04, §3.4
A-19 / G-BAUYesNo decomposition published; the review's own is at §3.3 with its derived component labelledD5-05, §3.3
A-21Yes"Aims to expand the pathway to include Scope 3" and "committed to maturing its boundary" treated as neutral; F-13 and D4-02 rest on the present treatment aloneD6-05, D4-02
AI-19YesConfidence recorded separately from severity throughoutAnnex D
AI-20YesNo inference of intent, misconduct or greenwashing. The recognition basis is described and its effect stated; the company's stated rationale is givenF-5, §5.1
G-06 / G-07YesScope 1 and Scope 2 decomposed; Scope 2 split location and market§3.1, §3.3
G-10 / T-BASE-01YesNo restatement detected; the SAF target definition change recordedD2-04, D6-06
G-20YesWhich-scope test applied to codeshare: Scope 3, so operational control does not answer itD2-06
OUT-TB-02YesReader-impression test applied to the 12% headline and the Remuneration Report wordingD6-02, D7-03
OUT-TB-14YesNo cross-report or peer comparison anywhere in the proseThroughout
OUT-TB-15YesEvery headline claim attributed to source and boundaryAnnex C
OUT-TB-21Yes"100 per cent renewable energy for its Australian buildings" is bounded on its face; tested on evidence and timing, not on the size of the bounded quantityC-04, D3-02
OUT-STK-04/-05/-13, AMD-032, AMD-034YesFull criterion enumeration published before scoring; OUT-STK-13's rebuttal test satisfiedAnnex L
S3-ESTYesSpend-based estimation not scored as a faultD4-02
S3-25YesApplied to codeshare; not displaced by G-20D4-03
SEC-AVIYesAviation module appliedD8
T-14YesRecorded adversely: the intensity measure was withdrawnD6-03
YOY-01..08YesEight-period series; dropped disclosures and target-definition change loggedAnnex K

Annex H: Evidence requests / cannot-verify items (AI-21 / A-05)

IDRequest (factual sources only)Rule basisStatus
K-1FY26 carbon credit register: volume, scheme, standard, project, vintage, serial number and retirement dateE-08..E-22, G-11Outstanding: F-14, F-15, F-16
K-2Split of the 1,952.7 kt abatement line between SAF and carbon credits, and SAF abatement tonnage for FY26A-19, G-BAUOutstanding: F-14
K-3Three-way split of the credit component: retired, acquired but not retired, accrued against credits not yet acquired, by schemeG-11, E-08Outstanding: F-15
K-4LGC procurement and retirement records by site, with retirement datesE-01..E-16Outstanding: F-17
K-5Estimate of emissions from partner-operated flights sold under a QF code, and the category they sit inS3-25, G-19Outstanding: F-19
K-6Category 15 investee Scope 2 and 3, or a statement that they are immaterialS3-16Outstanding: F-21
K-7The relevance assessments for Categories 13 and 14S3-26Outstanding: F-22
K-8Revenue tonne kilometres for FY26, or the per-RTK emissions figureT-14, SEC-AVIOutstanding: F-9
K-9NGER register FY2025-26 when publishedA-01CDeferred to February 2027: F-18

No request asks the user or the company to judge compliance. All are requests for factual sources.

Annex I: Evidence-chain & triggered-scan log (AI-10)

#Trigger detectedFollow-up scans runOutcome
M-1Net zero claim (2050, all scopes)10, 11, 03D6-05, D6-06, F-13; lever shares captured at E-27
M-2Target achievement / on-track claim (12% reduction)11, 06D6-02, F-4, F-5; the central finding of the review
M-3Carbon credit reliance10, 06D5-01, D5-02, F-5, F-6; recognition basis at E-06, retirement status at E-07
M-4100% renewable electricity / market-based Scope 208D3-01, D3-02, F-11; first-year market-based figure at E-02
M-5Scope 3 disclosed by category09D4-01..D4-05; OUT-STK-13 rebuttal satisfied
M-6Assurance statement12D7-01, D7-04; perimeter gap on the abatement line
M-7Climate-linked remuneration12D7-02, D7-03, F-7, F-8
M-8Transition plan / low-carbon opportunity11D6-04, D6-05, F-13; Scope 3 outside the plan
M-9Method / boundary change06, 11D2-04, D2-05, D6-06, F-10
M-10Coverage claim and completeness word bound to a quantity02 (OUT-TB-21)C-04, C-09 tested; both bounded on their face
M-11Australian entity, metric in more than one place16, 01Annex J; NGER reconciliation at D2-02; four cross-source tensions
M-12Multiple periods and report types17, 06, 11Annex K; eight-period series; two dropped disclosures
M-13Source contracted or operated by another party (codeshare)06, 09 (G-20)D2-06, D4-03, F-12; which-scope test resolves to Scope 3
M-14Disclosed intention to review, extend or improve03, 17 (A-21)D4-02, D6-05; both treated neutral, findings rest on present treatment
M-15Spend-based Scope 3 categories09 (S3-EST)D4-02; not scored as a fault
M-16Any reduction claim: BAU decomposition06, 03 (A-19/G-BAU)D5-05; no company decomposition published

Annex J: Cross-source consistency matrix & disclosure-risk register (DR-01..DR-07 / A-01C / OUT-TB-18)

O.1 Cross-source consistency matrix (DR-02). Boundary and period normalised before any divergence is recorded.

#Metric / claimSustainability Report 2026Annual Report 2026NGER registerNormalised?Divergence
O-1Domestic Scope 1, FY25 comparative4,622.4 kt—4,622,401 t (FY2024-25)Yes: operational control, AU facilities, same periodNone. Exact agreement at the disclosed precision
O-2Domestic Scope 1, FY264,742.0 kt—Not published until February 2027N/ACannot verify by timing (F-18), not a divergence
O-3Whether compliance-driven abatement counts as progressCounted toward the voluntary 2030 target; the abatement line includes CORSIA and Safeguard obligationsExcluded from the Group Scorecard climate measure, which covers SAF procurement and operational improvement only; mandatory SAF abatement excluded as "a standard outcome of business operations"N/AYes: same abatement, same period, same suiteMaterial. Opposite tests applied to the same abatement in two documents published together
O-4Direction of Scope 1 emissionsGross Scope 1 rose 6.4% to 12,916.4 kt"Reductions in Scope 1 GHG emissions exceeded the target" (audited Remuneration Report)N/AYes: the scorecard measures the abatement increment, not the levelMaterial as presented. Both statements are true of different quantities; neither document says which
O-5Whether the targets changed"The Group has refined how its SAF target is expressed" and "No further revisions have been made to the above targets since they were set", same pageTargets restated unchanged at pp.20 and 111N/AYesMaterial. Internal to one page
O-6Whether the Scope 2 approach changed"re-assessed its Scope 2 operational control boundary during 2025/26, which resulted in the inclusion of additional international lounges and office locations" and "There have been no changes to the Group's Scope 2 location-based GHG emissions measurement approach", same paragraph—N/AYesMinor. Boundary and measurement approach are different things, but the paragraph does not draw the distinction
O-7Headline reduction figure12% net Scope 1+2 against the 2019 baseline, with footnote 2012% net Scope 1+2 against the 2019 baseline, no footnote carried acrossN/AYesMinor. The qualification does not travel with the number into the Annual Report
O-8Carbon credit volumesMetric named in the compliance table, values blankCarbon credits noted within inventories; no amount broken outN/AYesMaterial as an absence. The metric the company says it reports to the regulator is not reported to the reader

O.2 Disclosure-risk register (DR-01..DR-07).

#LensExposureConfidenceRisk statement (risk-labelled only, no allegation)
DR-1Legal / regulatoryModerateMediumThe first mandatory statements carry a Directors' Declaration. The reader-impression gap between a 12% headline and rising gross emissions now sits inside a document with directors' sign-off, which raises the consequence of that gap without itself indicating non-compliance
DR-2Market / reputationalModerate to highMediumFour elements of the suite point one way and the emissions point the other. Each is defensible individually
DR-3Transition / policyHighHighRoughly 94% of the reported abatement, on the review's derivation, depends on carbon markets. The company discloses that CORSIA's first phase faced a unit shortage and enforcement gaps, that the Safeguard Mechanism faces a legislated review, and that its own CORSIA baseline is not calculable until after December 2026
DR-4TechnologyHighHighSAF is 1.1% against a 10% requirement in four years and the 2050 pathway assumes approximately 60% of fuel
DR-5PhysicalModerateMediumAssessed across three scenarios with mitigations described; financial effects not quantified under permitted exemptions
DR-6Governance / remunerationModerateHighThe company's own scorecard does not credit most of what its published headline counts
DR-7AssuranceModerateHighThe figure carrying the headline result sits outside the assured perimeter

Annex K: Longitudinal series & cross-period tracking register (YOY-01..08 / OUT-TB-19)

P.1 Multi-period headline series (YOY-02): values as stated, with the source each came from.

Metric / claimPeriod →FY19FY20FY21FY22FY23FY24FY25FY26Source(s) per cellBoundary/method normalisation
Scope 1 (t CO₂-e)12,372,7359,340,7213,236,7534,734,4079,720,68711,456,41812,139,42512,916,400FY19: SR22 p.59. FY20–22: SR23 p.73 (restated). FY23–25: SR25 p.127. FY26: SR26 p.27Operational control throughout; NGER, CORSIA and NGA methods unchanged. FY26 stated in kt to one decimal
Scope 2 (location-based)120,88183,92064,98364,89462,46260,29758,10655,000As aboveLos Angeles and London added from FY24; international lounges and offices added FY26, comparatives unrestated
Scope 2 (market-based)———————900SR26 p.27First year published; no comparator exists
Scope 3 total1,212,055906,298272,022490,2143,182,5946,094,1857,305,8457,572,600As above; FY26 SR26 p.28Boundary break at FY23: categories added; FY19–FY22 not like-for-like with FY23–FY26
Scope 3 by category——————Disaggregated retrospectively in SR26C1 2,634,900; C2 1,070,200; C3 3,382,100; C15 276,800; C4–C9 208,600SR26 p.28First published FY26, with the FY25 comparative disaggregated on the same basis
Total footprint13,705,67110,330,9393,573,7585,289,51512,965,74317,610,90019,503,37720,544,000As aboveArithmetic verified each year
Gross Scope 1+2 against the FY19 baseline12,493,616 (base)—————12,197,531 (−2.4%)12,971,400 (+3.8%)SR22 p.59; SR25 p.127; SR26 p.27Baseline value republished in FY26 after four years absent
Reported net Scope 1+2 reduction——————Not published12% (net 11,018,700)SR26 p.27First year a net figure or percentage is published; no prior comparator
Intensity (kg CO₂-e / 100 RTK)92.588.6102.296.087.987.484.5Not publishedFY19: SR22 p.59. FY20–22: SR23 p.73. FY23–25: SR25 p.127Series discontinued in FY26 with no explanation
SAF as % of jet fuel————0.221%0.220%0.218%1.084%SR23–SR25; SR26 p.30Target expression "refined" FY26 to admit book-and-claim attributes
Renewable electricity claimClaimed 100% (AU buildings)ClaimedClaimedClaimedClaimedClaimedClaimedClaimed, with market-based Scope 2 published and a six-month retirement position disclosed for one contractSR26 p.27 and Notes p.41First year any supporting figure is published; volumes still absent
Carbon credit volume—2019-20 certified2020-21 certified2021-22 certified2022-23 certified364,000 retiredNot disclosedNot disclosedPDS chain; SR25 p.45Two consecutive years with no volume
Carbon-neutral claim statusClimate Active service certification FY2019-20CertifiedCertifiedCertifiedCertified to FY2023-24Absent from SR25Absent; no carbon-neutral claim madeSR25, SR26 full-text search 1 September 2026Neutral under A-18

P.2 Silent restatement & baseline-rebasing log (YOY-04)

#Figure / baselineAs stated in report of the periodAs restated in a later reportDisclosed & like-for-like?Effect on an on-track / pay / financing claimLabel
P2-1FY25 Scope 1, Scope 2 and Scope 3 totals12,139,425; 58,106; 7,305,845 (SR25 p.127)12,139.4 kt; 58.1 kt; 7,305.8 kt (SR26 pp.27–28)Yes: identical at the disclosed precision. No restatementNoneAcceptable
P2-2FY25 Scope 3 compositionSingle total onlyDisaggregated into C1, C2, C3, C15 and C4–C9 (SR26 p.28)Yes: an addition, not a restatement; the total is unchangedImproves comparabilityAcceptable: an added disclosure
P2-3FY19 Scope 1+2 target baseline12,493,616 t (SR22 p.59)Republished as 12,493.6 kt (SR26 p.27) after absence from FY23 to FY25Yes: unchanged value, restored to the tableMaterial and positive: the denominator of the headline target is legible againAcceptable: a restored disclosure, closing the prior period's principal retail gap
P2-4Scope 2 operational control boundary—Re-assessed FY26 to add international lounges and offices; comparatives not restated (SR26 Notes p.41)Partly: the re-assessment is disclosed, its magnitude is not, and the same paragraph says no changes were madeThe disclosed 5.3% Scope 2 decrease spans the changeConcern: drives A3 and O-6
P2-5SAF target definition"SAF procured equivalent to 10 per cent of jet fuel consumption"Same words; footnote 14 now admits book-and-claim attributes and fuel that may be uplifted by other airlines (SR26 p.24)Partly: the footnote discloses it; the body states no revisions have been madeMaterial: changes what meeting the target requiresConcern: drives F-10 and G2

P.3 Dropped / added disclosure log (YOY-05)

#ItemPresent inAbsent/added inExplained?Label
P3-1Fuel and emissions intensity per 100 RTKEvery report FY22 to FY25Absent from SR26 entirely; no intensity metric of any kind appearsNoConcern: drives F-9 and contributes to P2
P3-2Revenue tonne kilometresSR25 and priorAbsent from SR26; ASK remains in AR26NoConcern: compounds P3-1 by removing the means to recompute
P3-3Carbon credit volume retiredSR25 (FY24 figure)Absent from SR25 for FY25 and from SR26 for FY26NoConcern: drives F-6
P3-4FY19 baseline value in the metrics tableSR22Absent FY23–FY25; restored in SR26Not explained, but restoredAcceptable: an added disclosure
P3-5Scope 3 category breakdownNeverAdded in SR26, with the FY25 comparativeYes: presented as GHG Protocol categoriesAcceptable: an added disclosure
P3-6Market-based Scope 2NeverAdded in SR26Yes: "disclosing Scope 2 market-based emissions for the first time"Acceptable: an added disclosure
P3-7Internal carbon price valueWithheld as commercially sensitive to FY25Added in SR26 at AUD $60 to $70 per tCO₂-eYesAcceptable: an added disclosure
P3-8Quantified anticipated carbon costsNeverAdded in SR26 for FY27 at $117m, split three waysYes, with the reason for stopping at FY27Acceptable: an added disclosure
P3-9Climate Active program / certificationPDS chain to FY2023-24Absent from SR25 and SR26; no carbon-neutral claim madeNoNeutral under A-18; no live claim depends on it
P3-10Carbon credit purchasing for Ground and Duty TravelCommitment made 2007, operative to FY26Ends FY27, stated in SR26 p.33Yes: reason givenNeutral under A-18
P3-11Carbon credit recognition basisNot stated in prior reportsAdded in SR26 Notes p.42 and critical judgements p.6YesAcceptable as disclosure; the treatment itself drives F-5

P.4 Target-trajectory log (YOY-06 / YOY-08)

#Target / claimBase yrTarget yrCoverage / scopeChange across periodsOn-track survives series?Label
P4-125% net Scope 1+2 reductionFY19FY30Scope 1+2, net of SAF and creditsNo change across FY22–FY26 in base year, coverage or valueNo: gross is now 3.8% above the baseline, having been 2.4% below it a year earlier, so the gross position moved away from the target while the reported net position moved toward itConcern on trajectory and on attribution, not on target integrity
P4-2SAF equivalent to 10% of jet fuel—FY30Group jet fuelExpression changed FY26 to admit book-and-claim attributes and fuel uplifted by other airlines, while the report states no revisions were madeNot yet determinable: 1.084% at FY26 against 10%, with no annual bridge publishedConcern: drives F-10
P4-3Net zero—2050Scope 1, 2 and 3, netNo change. No quantified milestone exists between 2030 and 2050; carbon credits are disclosed as 30–40% of the 2050 pathwayCannot verify: no interim waypoint to test againstConcern: drives F-13
P4-4Ground and Duty Travel carbon credit purchasing2007OngoingCustomer and staff travelRetired from FY27, disclosed with reasonsN/ANeutral under A-18

*Prepared under the Climate Disclosure Review Rules v15.23 (controlled AI-assisted review). The body (§1–§7) states the verdict and may be issued on its own; the annexes are the working layer. General information only: not legal, financial or investment advice, an audit, an assurance opinion, or a NoCO2 certification or conformance determination. © Carbon Reduction Institute Pty Ltd, ABN 26 122 969 233.*

Annex L: How each score was reached

Each audience score is built from a fixed set of load-bearing criteria, marked before the score is set. "Partial" means the criterion is satisfied only with reader effort that this audience can reasonably spend, not a soft failure. The count matters as well as the score: a score can reach its floor on two failed criteria, so two reports sharing a score may sit some distance apart on the detail below.

#AudienceCriterionVerdictWhy
A1Carbon accountingNo material category excludedPassOUT-STK-13's own rebuttal test is satisfied: a full GHG Protocol category breakdown is published (C1, C2, C3, C15 itemised; C4–C9 bounded at under 3%; C10–C14 assessed out with the assessment stated), and the total carries limited assurance. Where a rule supplies its own rebuttal test, satisfying it makes the criterion pass. The codeshare concern at F-12 is recorded and does not defeat this criterion: it is a question about the contents of a category, not an absent category, its magnitude is cannot-verify, and the GHG Protocol does not settle marketing-carrier treatment, so no compliance finding is invented (AI-01)
A2Carbon accountingSingle reconcilable footprintPassOne footprint. Every identity holds: Scope 1 components sum, Scope 1 + Scope 2 = gross, gross − abatement = net, net against baseline reproduces 12%, Scope 3 categories sum to the assured total in both years. FY25 domestic Scope 1 matches the statutory register exactly. No competing totals in any source
A3Carbon accountingMethod, boundary and version transparencyPartial (workable)Methods, activity data and emission factors disclosed per scope, per geography and per Scope 3 category; critical judgements listed, including the carbon credit recognition basis; no restatements. Gap: the Scope 2 boundary was re-assessed to add sites in the same paragraph that states no changes were made, with comparatives unrestated. Action: read the same paragraph, which discloses the re-assessment. Data: SR26 Notes p.41. Not counted
A4Carbon accountingGranularity and assurance sufficient to liftPassThe whole footprint is liftable: Scope 1 by geography, Scope 2 on both bases, Scope 3 by category, with a reasonable-assurance audit over Scope 1 and 2 and a limited-assurance review over Scope 3. The withdrawn per-RTK factor is a liftability loss but is a rate metric, not inventory, and is recorded at I6 and F-9 rather than counted twice
I1Institutional investorsPhysical risk relevant and transparent (N-04)Partial (workable)Three scenarios, three horizons, named inputs, hazards and mitigations; resilience concluded. Financial effects not quantified, on disclosed and permitted exemptions. Action: read the scenario architecture and risk tables. Data: SR26 pp.10–11, 15–17, 21. Not counted
I2Institutional investorsTransition risk: derivable target headroomPassBaseline, gross, abatement, net and the percentage are printed in one table. Target value 9,370.2 kt, gap from net 1,648.5 kt, from gross 3,601.2 kt, all derivable within the document with no cross-document work
I3Institutional investorsTarget achievement: real reductions, honest progressNot metGross Scope 1+2 rose 6.3% to a record and is 3.8% above the baseline; the entire reported 12% is the abatement line, recognised on acquisition and in part on estimate where credits are not acquired, with no CORSIA credits retired; no BAU decomposition is published; and compliance-driven abatement is counted here while the company's own scorecard excludes it. OUT-STK-05 independently caps this audience at 2 for a grossly misleading headline
I4Institutional investorsPortfolio / financed-emissions completenessPassNot a financial institution. Category 15 is in-boundary and now quantified at 276.8 kt rather than declared only
I5Institutional investorsFlow-through / look-through exposurePartial (workable)C15 raised, quantified, explained and method disclosed. Gap: investee Scope 1 only. Action: treat 276.8 kt as a floor and note the CORSIA-method basis. Data: SR26 Notes p.42. Magnitude of the residual stays cannot-verify (A-05); no figure manufactured. Not counted
I6Institutional investorsReconstructability by a sophisticated readerPartial (workable)The inventory and the target position are fully reconstructable in-document. What cannot be rebuilt is the abatement line's composition, which is recorded once at I3 and not counted again, and the withdrawn per-RTK series. Action: compute a per-seat-kilometre proxy from the Annual Report. Data: ASK 157,957 M (FY26), 152,804 M (FY25), AR26 p.3, with the freight caveat at F-9. Not counted
R1Retail investorsHeadline matches evidence without cross-document workNot metThe headline in both documents is a 12% reduction. Gross emissions rose 6.3% to a record and stand above the baseline, and the total footprint is an all-time high. The criterion tests whether the headline matches the evidence, and its direction is opposite to the physical movement. Mitigant recorded: the gross figure and the baseline sit in adjacent columns of the same table, so the correction is co-located as data even though it is never stated as a correction, and OUT-STK-05 allows a 2 where a correction is co-located and legible. The line is drawn at defeat because no correction is made, only the raw inputs to one the reader must construct while disbelieving the sentence above it
R2Retail investorsTargets cover material sources; achievement honestPartial (workable)The interim target covers Scope 1+2, 63.1% of the footprint and the material lever for an airline, and the Scope 3 exclusion is stated with reasons on the same page. The SAF target definition change is disclosed in the footnote on the same page as the target. Achievement honesty is carried at R1 and I3. Action: read footnote 14 beside the target. Data: SR26 p.24. Not counted
R3Retail investorsMaterial risks legiblePassRisks presented in plain tables with time horizons, financial significance and mitigations; physical and transition both covered; carbon cost exposure quantified for the coming year
R4Retail investorsCaveats findable, understandable, fairly presentedPassCaveats are direct and co-located: credits are "not the same as preventing emissions from aviation in the first place"; the targets are "not been validated by an external third party"; achieving them "is not guaranteed"; the uncertainty list is explicit; and footnote 20 sits on the same page as the headline metric it qualifies. Candour is baseline and earns no credit (A-16), but the criterion is not defeated
P1Consumers & publicClaims literally true within their implied boundaryPartial (workable)The testable claims hold within their stated and disclosed boundaries: the 12% is arithmetically correct on the company's disclosed net basis; the credit disclaimer is accurate; the Safeguard credit claim is bounded on its face and states its own scope. The renewable claim's "was achieved" is qualified by a notes disclosure that retirement covers six months for one contract, which makes it a decision-usefulness concern, not a falsity finding (A-05, AI-20). Action: read the Scope 2 note beside the claim. Data: SR26 Notes p.41. Not counted
P2Consumers & publicNo misleading composite impressionNot metIndividually accurate statements assemble into an impression the numbers do not support: a 12% reduction in both documents, an audited Remuneration Report recording that emission reduction targets were exceeded, a five-fold SAF headline, and the per-kilometre efficiency series that would have shown the real trend withdrawn without explanation, against gross Scope 1 at a record, gross Scope 1+2 above the 2019 baseline and a 20.5 Mt total footprint. The lowest-caveat-tolerance audience (OUT-STK-05) cannot be expected to assemble the correction from a footnote and a notes page
P3Consumers & publicGenuine climate action evidencedPassAction is measured, not asserted: SAF up 5.29× on committed offtake, 40+ efficiency initiatives quantified individually to 40 kt, all Safeguard credits shifted to nature-based removals under a documented integrity framework, $36m of Climate Fund deployment in the year
G1RegulatorsStandards compliance / readinessPassThe first mandatory year is delivered: Climate Statements under AASB S2, Directors' Declaration under s296A(6), audit opinion over Scope 1 and 2 and review conclusion over governance, strategy and Scope 3, all unmodified and at exactly the mandated phase-in level. Both gaps dated to this year, Scope 2 dual reporting and Scope 3 disaggregation, are closed. The three financial-effect exemptions used are available under the standard and their use is disclosed
G2RegulatorsCross-source / audience consistencyNot metFour tensions within one suite published together: the Sustainability Report counts compliance-driven credits toward the voluntary target while the Annual Report excludes mandated abatement from pay as a standard outcome of business operations; the Remuneration Report records reductions exceeded target in a record-emissions year; "no further revisions have been made to the above targets" sits two sentences after "the Group has refined how its SAF target is expressed"; and "no changes to the Group's Scope 2 location-based GHG emissions measurement approach" sits in the paragraph recording the Scope 2 boundary being re-assessed to add sites